Advanced Notification Messages and Use of Sequential Portable Changeable Message Signs in Work Zones

Advanced Notification Messages and Use of Sequential Portable Changeable Message Signs in Work Zones

Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. FHWA/TX-05/0-4748-1 4. Title and Subtitle 5. Report Date ADVANCED NOTIFICATION MESSAGES AND USE OF July 2005 SEQUENTIAL PORTABLE CHANGEABLE MESSAGE SIGNS IN WORK ZONES 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Gerald L. Ullman, Brooke R. Ullman, Conrad L. Dudek, Alicia Report 0-4748-1 Williams, and Geza Pesti 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Texas Transportation Institute The Texas A&M University System 11. Contract or Grant No. College Station, Texas 77843-3135 Project 0-4748 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Texas Department of Transportation Technical Report: Research and Technology Implementation Office September 2003- June 2005 P. O. Box 5080 14. Sponsoring Agency Code Austin, Texas 78763-5080 15. Supplementary Notes Project performed in cooperation with the Texas Department of Transportation and the Federal Highway Administration. Project Title: Effective Use of Portable Changeable Message Signs in Work Zones 16. Abstract In this report, researchers document the results of a laptop-based human factors study of alternative formats of presenting advance notice work zone information on portable changeable message signs (PCMSs) and a Texas Transportation Institute (TTI) driving simulator study of the ability of motorists to capture and process information on two PCMSs used in sequence to convey information about upcoming traffic situations. Based on the studies, researchers recommend that messages that require the display of calendar dates for future roadwork and other traffic control activities should utilize a message format consisting of the three-character abbreviation of the month (e.g., APR for April) in conjunction with the date. When future work activities span several days all in the same month, the month needs be noted only once in the message (i.e., APR 21-23) rather than repeating the month (i.e., APR 21-APR 23). The TTI driver simulator study results indicate the need to keep overall messages at or below the four-unit maximum recommended in existing guidelines. Researchers found that presenting five units of information on sequential PCMSs resulted in low comprehension rates, below what would be acceptable for highway applications. However, by keeping the message length to four units, it does appear that the use of sequential PCMSs will result in comprehension rates comparable to those obtained by presenting the same information at a single location on a large dynamic message sign (DMS), and is recommended as an acceptable formatting approach for TxDOT. Comprehension may be enhanced by repeating one of the units of information on both PCMSs. 17. Key Words 18. Distribution Statement No restrictions. This document is available to the Driver information systems, variable message signs, public through NTIS: work zones National Technical Information Service Springfield, Virginia 22161 http://www.ntis.gov 19. Security Classif.(of this report) 20. Security Classif.(of this page) 21. No. of Pages 22. Price Unclassified Unclassified 86 Form DOT F 1700.7 (8-72) Reproduction of completed page authorized ADVANCED NOTIFICATION MESSAGES AND USE OF SEQUENTIAL PORTABLE CHANGEABLE MESSAGE SIGNS IN WORK ZONES by Gerald L. Ullman, Ph.D., P.E. Research Engineer Texas Transportation Institute Brooke R. Ullman, P.E. AssociateTransportation Researcher Texas Transportation Institute Conrad L. Dudek, Ph.D., P.E. Research Engineer Texas Transportation Institute Alicia Williams Research Associate Texas Transportation Institute and Geza Pesti, Ph.D, P.E. Associate Research Engineer Texas Transportation Institute Report 0-4748-1 Project Number 0-4748 Project Title: Effective Use of Portable Changeable Message Signs in Work Zones Performed in cooperation with the Texas Department of Transportation and the Federal Highway Administration July 2005 TEXAS TRANSPORTATION INSTITUTE The Texas A&M University System College Station, Texas 77843-3135 DISCLAIMER The contents of this report reflect the views of the authors, who are responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official view or policies of the Federal Highway Administration (FHWA) or the Texas Department of Transportation (TxDOT). This report does not constitute a standard, specification, or regulation. The engineer in charge was Dr. Gerald L. Ullman, Ph.D., P.E. (TX, # 66876). v ACKNOWLEDGMENTS This project was conducted in cooperation with TxDOT and FHWA. The authors would like to thank several TxDOT staff members for their insights and guidance in this research: Ismael Soto (Corpus Christi District), project director; Paul Frerich (Yoakum District), program coordinator; Susan Feudo (Corpus Christi District), Howard Holland (Brownwood District), Dale Barron (Waco District), and Charles Kratz (Traffic Operations Division), Project Monitoring Committee; and Wade Odell, Research and Technology Implementation (RTI) office liaison. The authors gratefully acknowledge the assistance of numerous other TxDOT employees who provided assistance during the data collection activities of this project. Similarly, the researchers appreciate the contributions of Susan Chrysler, Nada Trout, Steven Schrock, and Melisa Finley of TTI during various phases of the project. vi TABLE OF CONTENTS Page LIST OF FIGURES ....................................................................................................................... ix LIST OF TABLES...........................................................................................................................x INTRODUCTION ...........................................................................................................................1 STATEMENT OF THE PROBLEM.......................................................................................... 1 PROJECT OBJECTIVES ........................................................................................................... 3 CONTENTS OF THIS REPORT ............................................................................................... 4 INVENTORY OF PCMS MESSAGES DISPLAYED IN TEXAS WORK ZONES .....................5 OVERVIEW ............................................................................................................................... 5 HUMAN FACTORS CRITIQUE OF PCMS APPLICATIONS ............................................... 6 Lane Closure Messages...........................................................................................................6 Advance Notice of Changes in Traffic Conditions or Control ............................................... 9 Speed-Related Messages....................................................................................................... 10 Road and Ramp Closure or Detour Messages ...................................................................... 10 Exit Messages ....................................................................................................................... 10 General Warning and Other Miscellaneous Messages ......................................................... 10 SUMMARY OF ISSUES IDENTIFIED .................................................................................. 11 INTERVIEWS OF TXDOT PERSONNEL REGARDING PCMS APPLICATION ISSUES.....13 OVERVIEW ............................................................................................................................. 13 SURVEY RESULTS ................................................................................................................ 13 Typical PCMS Applications ................................................................................................. 13 PCMS Guidelines Used ........................................................................................................ 14 Specific PCMS Issues or Problems Encountered ................................................................. 15 Suggestions to Overcome Issues and Difficulties................................................................. 16 Guideline Desirability and Format........................................................................................ 17 SUMMARY.............................................................................................................................. 17 EVALUATION OF ALTERNATIVE DATE, DAY, AND TIME DISPLAYS FOR ADVANCE NOTIFICATION PCMS MESSAGES..........................................................................................19 QUESTIONS INVESTIGATED AND STUDY OBJECTIVES.............................................. 19 STUDY BACKGROUND........................................................................................................ 19 STUDY APPROACH............................................................................................................... 20 STUDY RESULTS................................................................................................................... 22 Message Set 1: Numeral versus Text Month Displays ......................................................... 22 Message Set 2: Calendar Dates with and without Day of Week Included ........................... 23 Message Set 3: Repeating Month Information in the Message ............................................ 25 Message Set 4: Including Days versus Times in a Message................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    86 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us