4 5 A14 2 Cambridge to Huntingdon improvement scheme Development Consent Order Application +($(; TR010018 HE/A14/EX/254 Comparison between draft Development Consent Order (Rev 4) and draft Development Consent Order (Rev 6) November 2015 The Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedures) Regulations 2009 The Infrastructure Planning (Examination Procedure) Rules 2010 STATUTORY INSTRUMENTS 201[ ] No. INFRASTRUCTURE PLANNING The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 201[ ] Made - - - - *** Coming into force - - *** CONTENTS PART 1 PRELIMINARY 1. Citation and commencement 2. Interpretation 3. Disapplication of legislative provisions 4. Maintenance of drainage works PART 2 PRINCIPAL POWERS 5. Development consent, etc., granted by the Order 6. Maintenance of the authorised development 7. Limits of deviation 8. Benefit of Order 9. Consent to transfer benefit of Order PART 3 STREETS 10. Application of the 1991 Act 11. Construction and maintenance of new, altered or diverted streets and other structures 12. Classification of roads, etc. 13. Permanent stopping up of streets and private means of access 14. Temporary stopping up and restriction of use of streets 15. Access to works 16. Clearways PART 4 SUPPLEMENTAL POWERS 17. Discharge of water 18. Protective works to buildings 19. Authority to survey and investigate land PART 5 POWERS OF ACQUISITION AND POSSESSION OF LAND 20. Compulsory acquisition of land 21. Compulsory acquisition of land – incorporation of the mineral code 22. Time limit for exercise of powers to possess land temporarily or to acquire land compulsorily 23. Compulsory acquisition of rights 24. Public rights of way 25. Private rights over land 26. Application of the Compulsory Purchase (Vesting Declarations) Act 1981 27. Acquisition of subsoil or airspace only 28. Acquisition of part of certain properties 29. Rights under or over streets 30. Temporary use of land for carrying out the authorised development 31. Temporary use of land for maintaining the authorised development 32. Statutory undertakers 33. Apparatus and rights of statutory undertakers in stopped up streets 34. Recovery of costs of new connection 35. Special category land PART 6 OPERATIONS 36. Felling or lopping of trees and removal of hedgerows 37. Trees subject to tree preservation orders PART 7 MISCELLANEOUS AND GENERAL 38. Operational land for purposes of the 1990 Act 39. Defence to proceedings in respect of statutory nuisance 40. Protective provisions 41. Certification of plans, etc. 42. Service of notices 43. Arbitration 44. Appeals 45. Traffic regulation 2 SCHEDULES SCHEDULE 1 — AUTHORISED DEVELOPMENT SCHEDULE 2 — REQUIREMENTS PART 1 — REQUIREMENTS PART 2 — PROCEDURE FOR DISCHARGE OF REQUIREMENTS SCHEDULE 3 — CLASSIFICATION OF ROADS, ETC PART 1 — SPEED LIMITS PART 2 — TRAFFIC REGULATION MEASURES (CLEARWAYS AND PROHIBITIONS) PART 3 — ROADS TO BE DE-TRUNKED PART 4 — REVOCATIONS & VARIATIONS OF EXISTING TRAFFIC REGULATION ORDERS PART 5 — WEIGHT LIMIT VARIATIONS PART 6 — CLASSIFICATION OF ROADS SCHEDULE 4 — PERMANENT STOPPING UP OF HIGHWAYS AND PRIVATE MEANS OF ACCESS (PMAs) & PROVISION OF NEW HIGHWAYS AND PRIVATE MEANS OF ACCESS PART 1 — HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW HIGHWAYS WHICH ARE OTHERWISE TO BE PROVIDED PART 2 — HIGHWAYS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED PART 3 — PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW PRIVATE MEANS OF ACCESS WHICH ARE OTHERWISE TO BE PROVIDED PART 4 — PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED SCHEDULE 5 — LAND IN WHICH ONLY NEW RIGHTS ETC., MAY BE ACQUIRED SCHEDULE 6 — MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS SCHEDULE 7 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN SCHEDULE 8 — TREES SUBJECT TO TREE PRESERVATION ORDERS SCHEDULE 9 — PROTECTIVE PROVISIONS PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, OIL, WATER AND SEWERAGE UNDERTAKERS PART 2 — FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS PART 3 — FOR THE PROTECTION OF THE ENVIRONMENT AGENCY PART 4 — FOR THE PROTECTION OF DRAINAGE AUTHORITIES IN RESPECT OF ORDINARY WATERCOURSES PART 5 — FOR THE PROTECTION OF NATIONAL GRID PART 6 — FOR THE PROTECTION OF RAILWAY INTERESTS PART 7 — FOR THE PROTECTION OF ANGLIAN WATER SCHEDULE 9—TREES SUBJECT TO TREE PRESERVATION ORDERS 10 — DOCUMENTS TO 3 An application has been made to the Secretary of State, under section 37 of the Planning Act 2008( a) (“the 2008 Act”) in accordance with the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009( b) for an Order granting development consent. The application was examined by a Panel of four members (“the Panel”) (appointed by the Secretary of State) pursuant to Chapter 3 of Part 6 of the 2008 Act and carried out in accordance with Chapter 4 of Part 6 of the 2008 Act, and the Infrastructure Planning (Examination Procedure) Rules 2010( c). The Panel, having examined the application with the documents that accompanied the application, and the representations made and not withdrawn, has, in accordance with section 83(1) of the 2008 Act, made a report and recommendation to the Secretary of State. The Secretary of State, having considered the representations made and not withdrawn, and the report of the Panel, has decided to make an Order granting development consent for the development described in the application [with modifications which in the opinion of the Secretary of State do not make any substantial changes to the proposals comprised in the application]. In accordance with section 131(5) of the 2008 Act, the Secretary of State is satisfied, having considered the report and recommendation of the Panel, that the parcels of common, open space or fuel or field garden allotment land comprised within the Order land are less than 200 square metres in extent individually, or that this land is required for the widening or drainage of an existing highway or partly for the widening and partly for the drainage of such a highway, and that the giving in exchange of other land is unnecessary, whether in the interests of the persons, if any, entitled to rights of common or other rights or in the interests of the public. The Secretary of State, in exercise of the powers conferred by sections 114, 115, 120 and 122 of, and paragraphs 1 to 4, 10 to 17, 19 to 23, 26, 33, 36 and 37 of Part 1 of Schedule 5 to, the 2008 Act, makes the following Order— PART 1 PRELIMINARY Citation and commencement 1. This Order may be cited as the A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 201[ ] and comes into force on [ ] 201[ ]. Interpretation 2. —(1) In this Order— “the 1961 Act” means the Land Compensation Act 1961( d); (a) 2008 c.29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c.20). (b) S.I. 2009/2264, amended by S.I. 2010/439, S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522 and S.I. 2013/755. (c) S.I. 2010/103, amended by S.I. 2012/635. (d) 1961 c.33. Section 2(2) was amended by section 193 of, and paragraph 5 of Schedule 33 to, the Local Government, Planning and Land Act 1980 (c.65). There are other amendments to the 1980 Act which are not relevant to this Order. 4 “the 1965 Act” means the Compulsory Purchase Act 1965( a); “the 1980 Act” means the Highways Act 1980( b); “the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 1981( c); “the 1984 Act” means the Road Traffic Regulation Act 1984( d); “the 1990 Act” means the Town and Country Planning Act 1990( e); “the 1991 Act” means the New Roads and Street Works Act 1991( f); “the 2008 Act” means the Planning Act 2008( g); “address” includes any number or address for the purposes of electronic transmission; “apparatus” has the same meaning as in Part 3 of the 1991 Act; “the authorised development” means the development and associated development described in Schedule 1 (authorised development) and any other development authorised by this Order, which is development within the meaning of section 32 (meaning of development) of the 2008 Act; “the book of reference” means the book of reference with document reference [XXX] of that description set out in Schedule 10 certified by the Secretary of State as the book of reference for the purposes of this Order; “the borrow pits” means the borrow pits shown on the engineering section drawings and sections and the works plans; “bridleway” has the same meaning as in the 1980 Act; (a) 1965 c.56. Section 3 was amended by section 70 of, and paragraph 3 of Schedule 15 to, the Planning and Compensation Act 1991 (c.34). Section 4 was amended by section 3 of, and Part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c.71). Section 5 was amended by sections 67 and 80 of, and Part 2 of Schedule 18 to, the Planning and Compensation Act 1991 (c.34). Section 11(1) and sections 3, 31 and 32 were amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c.67) and by section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (2006 No.1). Section 12 was amended by section 56(2) of, and Part 1 to Schedule 9 to, the Courts Act 1971 (c.23). Section 13 was amended by section 139 of the Tribunals, Courts and Enforcement Act 2007 (c.15). Section 20 was amended by section 70 of, and paragraph 14 of Schedule 15 to, the Planning and Compensation Act 1991 (c.34).
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages263 Page
-
File Size-