Final Combined Design Report Volume I

Final Combined Design Report Volume I

Final Combined Design Report Volume I of II FAU Route 2574 Quentin Road U.S. Route 12 to Illinois Route 22 Lake County, Illinois Section No.08-00090-12-ES Project No. M-9003(271) March 22, 2013 Prepared For: Prepared By: TABLE OF CONTENTS SUMMARY VOLUME I APPENDIX A EXHIBITS AND TABLES APPENDIX B TYPICAL ROADWAY CROSS-SECTIONS APPENDIX C TRAFFIC DATA AND CAPACITY, STORAGE BAY, AND SIGNAL WARRANT ANALYSES APPENDIX D CRASH ANALYSIS VOLUME II APPENDIX E PREFERRED ALTERNATIVE PLAN & PROFILE APPENDIX F INTERSECTION DESIGN STUDIES APPENDIX G EXISTING AND PROPOSED DRAINAGE PLAN APPENDIX H PUBLIC INVOLVEMENT APPENDIX I CORRESPONDENCE AND INTERAGENCY COORDINATION BOUND AS SEPARATE DOCUMENTS NOISE ANALYSIS ENVIRONMENTAL ASSESSMENT WETLAND DELINEATION REPORT HYDRAULIC REPORTS Final Combined Design Report i March 22, 2013 TABLE OF CONTENTS VOLUME I COMBINED DESIGN REPORT Page No. 1. INTRODUCTION ................................................................................................... 1 1.1 Location and Description of Project ............................................................ 1 1.2 Project Background .................................................................................... 1 1.3 Project Development Process .................................................................... 2 2. PURPOSE AND NEED FOR ACTION .................................................................. 3 2.1 Purpose of the Proposed Action ................................................................. 3 2.2 Need for the Proposed Action .................................................................... 3 2.2.1 Accommodate Future Transportation Demand ............................. 3 2.2.2 Increase Travel Safety .................................................................. 5 2.2.3 Enhance Bicycle and Pedestrian Mobility ..................................... 6 3. EXISTING CONDITIONS ...................................................................................... 7 3.1 Description of Project Area ......................................................................... 7 3.2 Roadway Design Features ......................................................................... 7 3.2.1 Roadway Classifications and Speed Limits ................................... 7 3.2.2 Typical Roadway Cross-Sections ................................................. 8 3.2.3 Horizontal and Vertical Alignment ................................................. 8 3.2.4 Existing Right-of-Way .................................................................... 9 3.3 Intersections ............................................................................................... 9 3.3.1 West Cuba Road ........................................................................... 9 3.3.2 East Cuba Road .......................................................................... 10 3.4 Traffic Data and Capacity Analyses .......................................................... 10 3.5 Crash History ............................................................................................ 11 3.6 Bridges and Structures ............................................................................. 12 3.7 Stream Crossings ..................................................................................... 12 3.8 Drainage Patterns..................................................................................... 13 3.9 Pavement Conditions ............................................................................... 14 3.10 Pedestrian and Bicycle Facilities .............................................................. 14 3.11 Roadway Lighting ..................................................................................... 14 3.12 Public Transit ............................................................................................ 14 3.13 Public Services and Facilities ................................................................... 14 3.14 Environmental Resources and Sensitive Areas ........................................ 15 3.14.1 Social/Economic.......................................................................... 15 3.14.2 Agricultural .................................................................................. 15 3.14.3 Cultural ........................................................................................ 16 3.14.4 Air Quality ................................................................................... 16 3.14.5 Noise ........................................................................................... 16 3.14.6 Natural Resources ...................................................................... 16 3.14.7 Water Quality .............................................................................. 17 Final Combined Design Report ii March 22, 2013 3.14.8 Floodplains .................................................................................. 17 3.14.9 Wetlands ..................................................................................... 17 3.14.10 Special Waste ............................................................................. 18 3.14.11 Special Lands ............................................................................. 18 4. ALTERNATIVES CONSIDERED ........................................................................ 20 4.1 No-Action Alternative ................................................................................ 20 4.2 Congestion Management Process (CMP) Alternative .............................. 21 4.3 Build Alternative ....................................................................................... 23 4.3.1 General Characteristics of the Build Alternative .......................... 24 4.3.2 Bicycle/Pedestrian Accommodation Alternates ........................... 24 4.4 Evaluation of Alternatives ......................................................................... 26 4.4.1 Evaluation of Bicycle/Pedestrian Accommodations .................... 26 4.4.2 Selection of Preferred Alternative ............................................... 27 5. DESCRIPTION AND ANALYSIS OF THE PREFERRED ALTERNATIVE ......... 29 5.1 Design Criteria .......................................................................................... 29 5.2 Roadway Design Features ....................................................................... 29 5.2.1 Proposed Typical Cross-Sections ............................................... 29 5.2.2 Horizontal Alignment and Vertical Profile .................................... 31 5.3 Intersection Improvements ....................................................................... 32 5.3.1 West Cuba Road ......................................................................... 32 5.3.2 East Cuba Road .......................................................................... 33 5.4 Traffic Projections and Capacity Analyses ............................................... 33 5.5 Traffic Signals ........................................................................................... 34 5.6 Access Management ................................................................................ 35 5.7 Pavement Design ..................................................................................... 36 5.8 Structures ................................................................................................. 37 5.9 Roadway Lighting ..................................................................................... 38 5.10 Proposed Drainage Plan .......................................................................... 38 5.10.1 Proposed Drainage Plans ........................................................... 38 5.10.2 Hydraulic Reports ........................................................................ 40 5.10.3 Best Management Practices and Stormwater Pollution and Prevention Plan ........................................................................... 41 5.11 Utility Relocations ..................................................................................... 41 5.12 Pedestrian and Bicycle Facilities .............................................................. 42 5.13 Right-of-Way Acquisition, Relocations, and Easements ........................... 43 5.14 Design Exceptions .................................................................................... 44 5.15 Estimate of Construction Cost .................................................................. 44 5.16 Social, Economic and Environmental Effects ........................................... 44 5.16.1 Social/Economic.......................................................................... 44 5.16.2 Agricultural .................................................................................. 45 5.16.3 Cultural ........................................................................................ 45 5.16.4 Air Quality ................................................................................... 45 5.16.5 Noise ........................................................................................... 45 5.16.6 Energy ......................................................................................... 48 5.16.7 Natural Resources ...................................................................... 48 Final Combined Design Report iii March 22, 2013 5.16.8 Water Quality .............................................................................. 49 5.16.9 Floodplains .................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    166 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us