Basement Floor

Basement Floor

Basement Floor • Bedrock Site – Shallow soil depth – Blasting required – Limited floor options • Typical approach: pinned footings – Numerous penetrations of floor insulation • ICF Foundation Wall – lots of site work cutting EPS Cold Climate Passive House 22 Production Facility Author: Andrew W. Peel © 2016 Basement Floor • Solution: continuous insulated raft – Engineered to avoid footings – Blasting fill provided level base – Slab edge element for continuous insulation – No penetrations – Includes elevator pit Cold Climate Passive House 23 Production Facility Author: Andrew W. Peel © 2016 Basement Floor Cold Climate Passive House 24 Production Facility Author: Andrew W. Peel © 2016 Walls • Basement – Poured concrete with 12” exterior EPS: • Main – 2x8 structural wall with mineral wool batts – 7” one-sided SIPs – Gypsum board for fire rating Cold Climate Passive House 25 Production Facility Author: Andrew W. Peel © 2016 Intermediate Floors • Ground Floor – 10” core slab • Second and Third – CLT – Foam filled – Acts as finish Cold Climate Passive House 26 Production Facility Author: Andrew W. Peel © 2016 Roofs • Top Floor – Truss – 24” dense pack cellulose • Terraces – 11” CLT – EPS above – sloped insulation (various thicknesses) Cold Climate Passive House 27 Production Facility Author: Andrew W. Peel © 2016 Assembly Performance Summary Element U-value [W/m2K] R-value Floor Slab 0.11 R52 Basement Wall 0.11 R52 Main Wall 0.12 R47 CLT Roof 0.07 – 0.11 R52-R81 Top Roof 0.07 R81 Cold Climate Passive House 28 Production Facility Author: Andrew W. Peel © 2016 Terraces • CLT prevents insulation above if flush threshold is desired Psi-value = 0.064 W/mK (0.037 BTU) Cold Climate Passive House 29 Production Facility Author: Andrew W. Peel © 2016 Terraces • Solution: raised floor above CLT • Issues: – Lose CLT floor finish – Additional construction – Deemed acceptable Cold Climate Passive House 30 Production Facility Author: Andrew W. Peel © 2016 Airtightness Strategy • Basement Floors & Walls – Taped 15 mil Stego membrane • Main Walls – Intello – required to avoid dew point issues – Protected by service cavity where services are installed – Wrapped around intermediate floors • Roofs – Taped Plywood – Intello wrapper around CLT (exposed floors) • Windows – Intello taped to frames or plywood buck Cold Climate Passive House 31 Production Facility Author: Andrew W. Peel © 2016 Windows 2 • Comfort Requirement: Uw,installed ≤ 0.70 W/m K (0.12 BTU) • Only one certified cold climate window available – Price premium • Could relax performance by including heat source by window – Layout and heating system not conducive for this – Baseboard heaters would cause issues with total electrical capacity Cold Climate Passive House 32 Production Facility Author: Andrew W. Peel © 2016 HVAC Cold Climate Passive House Production Facility Author: Andrew W. Peel © 2016 Ventilation • Building Layout facilitated centralized approach • Flow rates controlled based on occupancy – Working hours office & production – Lunch shift to canteen • Extract in production rooms enable more balanced flow • Only one damper pair per floor required Cold Climate Passive House 34 Production Facility Author: Andrew W. Peel © 2016 Ventilation Issues: • Floor Layout only allowed for heating/cooling ducting in suspended ceiling, not additional ventilation ducting • Engineer and designer were hesitant to rely on single machine • Opted for semi-decentralized with 7 HRVs – Numerous issues... Cold Climate Passive House 35 Production Facility Author: Andrew W. Peel © 2016 Decentralized Ventilation Issues • Overventilation – Extract rooms Supply rooms – Code rates much higher • No humidity recovery (HRV) • Uncertified Performance – 75% agreed with PHI • Longer ducts – Up to 10.5m (35 ft)! – Up to 6% ↓ in HRE • Ducts shared with heating/cooling system – Mismatch in flow rates Cold Climate Passive House 36 Production Facility Author: Andrew W. Peel © 2016 Heating & Cooling • Residential VRF system – Heads installed in suspended ceiling above corridors • Total Electrical Capacity limited by utility company – Process, elevator loads • No products of small enough capacity • HP system – Manufacturer claimed it could operated below design temperature – Code requires backup system for peak loads – Electric resistance not possible, due to capacity limit – Solution: Propane-fired boiler – Also used for DHW (small demand) Cold Climate Passive House 37 Production Facility Author: Andrew W. Peel © 2016 Summary • Think through the details early – Initial thermal bridging modelling • Simplified approach critical in cold climates • Find engineers who are willing to explore options • Cold climate production innovation required Cold Climate Passive House 38 Production Facility Author: Andrew W. Peel © 2016 Questions? Thank you for your attention Andrew Peel Peel Passive House Consulting t: 905 483 9925 e: [email protected] Cold Climate Passive House Production Facility Author: Andrew W. Peel © 2016 39.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us