Rotterdam-Leiden Heat Infrastructure

Rotterdam-Leiden Heat Infrastructure

European Investment Bank Rotterdam - Leiden Heat Infrastructure ELENA Completed Project Factsheet Rotterdam - Leiden Heat Infrastructure Location Cities of Rotterdam and Leiden, the Province of South Holland, The Netherlands Beneficiary Warmtebedrijf Infra N.V. CoM signatory No Sector District Heating Total PDS costs EUR 1 504 313 .00 ELENA contribution EUR 887 409.21 The preparatory activities for the Investment Programme included technical, financial and legal studies needed to support the permits request, to support the investment decision Project development and to prepare the tender documents. These included preliminary design studies to the services define integration of the heat recovered in the existing district heating infrastructure, financed by ELENA including the trajectory of the connection network, preliminary design for the booster stations, business models, financial models, identification of potenti al investors and analysis of the legal model of Warmtebedrijf Infra N.V. Timeframe January 2016 – December 2019 The investment identification was supported by several studies and preliminary activities carried out by the partners involved in the project. As result of these activities, several preliminary agreements were in place before the ELENA contract signature: Basis for investment Cooperation agreement between the cities of Rotterdam and Leiden; identification Memorandum of understanding signed between Warmtebedrijf Infra N.V. and Nuon; Memorandum of understanding signed between Warmtebedrijf Infra N.V. and Shell; Letter of Intent signed between Heineken Warmtebedrijf Infra N.V.. The investment programme included an investment to recover waste heat from the Shell refinery located in the Port of Rotterdam and its connection to the existing district heating Investment programme network through heat exchanger and pipe connections to the main DH network. A second description component, related to the expansion of the Rotterdam district heating network to the city of Leiden and to Zoeterwoude did not materialize during the project timeline. Investment EUR 17.7m in implementation phase Total energy savings of 42 GWh per year Results achieved Total CO 2 reductions of 9 114 tonnes per year Leverage factor achieved 20 The time needed to obtain the permits was longer than initially foreseen. Changes in the structure of the final beneficiary resulted in delays in the project Lessons learnt implementation. The delays could have been avoided if these changes have been implemented anticipated and developed in parallel with other activities, immediately after the ELENA Contract signature. Further information N/A sources Contact person Wouter Verhoeven - [email protected] at Beneficiary 17.09.2020 P age 1 /1 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us