(CSHP) DOLE-Regional Office No. 3 May 2018

(CSHP) DOLE-Regional Office No. 3 May 2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 3 May 2018 Date No. Company Name and Address Project Name Approved 18CF0061 – Construction of Flood Mitigation Structures along Brgy. Caalibangbangan, 1 A.M.P. CONSTRUCTION Pampanga River, Sta.33+494.64 to Sta. 33+749.64, Brgy. San 23-Apr-18 Cabanatuan City Anton, San Leonardo, Nueva Ecija Brgy. Caalibangbangan, 18CF0078 – Preventive Maintenance – Jose Abad Santos Ave 2 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City (JASA) – K0101 + 742 – K0106 + 867, Cabiao, Nueva Ecija Brgy. Caalibangbangan, 18CF0102 – Concreting of Road, Barangay Papaya, San 3 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City Antonio, Nueva Ecija Brgy. Caalibangbangan, 18CF0056 – Construction of Slope Protection along Pampanga 4 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City River Control, Rio Chico River, Cabiao, Nueva Ecija Brgy. Caalibangbangan, 18CF0076 – Construction of Peñaranda River Flood Control, 5 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City Peñaranda, Nueva Ecija Brgy. Caalibangbangan, 18CF0105 – Concreting of Road, Brgy. Pias, General Tinio, 6 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City Nueva Ecija 18CF0090 – Construction of a Concrete River Wall along Brgy. Caalibangbangan, 7 A.M.P. CONSTRUCTION Pampanga River Barangay San Anton, San Leonardo, Nueva 23-Apr-18 Cabanatuan City Ecija Brgy. Caalibangbangan, 18CF0107 – Concreting of Road, Brgy. Concepcion, General 8 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City Tinio, Nueva Ecija 18CF0088 – Construction of Slope Protection on Steel Sheet Brgy. Caalibangbangan, Piles Foundation along Pampanga River, Sta. 5+152.93 to Sta. 9 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City 5+554.93, Sitio Tumana, Brgy. Sto. Cristo, San Antonio, Nueva Ecija Brgy. Caalibangbangan, 18CF0059 – Construction of Slope Protection along Pampanga 10 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City River Flood Control, Brgy. Langla, Jaen, Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Barcelona St., Primavera Homes, 11 MITZIE CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 34, Paco Roman ES, 23-Apr-18 Cabanatuan City, Nueva Ecija Rizal, Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Barcelona St., Primavera Homes, 12 MITZIE CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 35, Rizal CS, Rizal, 23-Apr-18 Cabanatuan City, Nueva Ecija Nueva Ecija Page 1 of 68 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 3 May 2018 Date No. Company Name and Address Project Name Approved CY 2018 Basic Education Facilities Fund (BEFF) Repair and Barcelona St., Primavera Homes, 13 MITZIE CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 33, Macapsing ES, 23-Apr-18 Cabanatuan City, Nueva Ecija Rizal, Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Barcelona St., Primavera Homes, 14 MITZIE CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 43, Bagong Sikat ES, 23-Apr-18 Cabanatuan City, Nueva Ecija Talavera, Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Barcelona St., Primavera Homes, 15 MITZIE CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 37, Valle ES, 23-Apr-18 Cabanatuan City, Nueva Ecija Talavera North, Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Barcelona St., Primavera Homes, 16 MITZIE CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 8, Apolinario Santiago 23-Apr-18 Cabanatuan City, Nueva Ecija ES, Gen. M. Natividad, Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Barcelona St., Primavera Homes, 17 MITZIE CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 11, San Vicente ES, 23-Apr-18 Cabanatuan City, Nueva Ecija Jaen, Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Barcelona St., Primavera Homes, 18 MITZIE CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 27, Singalat ES, 23-Apr-18 Cabanatuan City, Nueva Ecija Palayan City, Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Barcelona St., Primavera Homes, 19 MITZIE CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 6, Belen ES, Gen. M. 23-Apr-18 Cabanatuan City, Nueva Ecija Natividad, Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Barcelona St., Primavera Homes, 20 MITZIE CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 5, Balangkare ES, 23-Apr-18 Cabanatuan City, Nueva Ecija Gen. M. Natividad, Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Barcelona St., Primavera Homes, 21 MITZIE CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 7, Mataas na Kahoy 23-Apr-18 Cabanatuan City, Nueva Ecija ES, Gen. M. Natividad, Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Barcelona St., Primavera Homes, 22 MITZIE CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 36, Mangga ES, San 23-Apr-18 Cabanatuan City, Nueva Ecija Isidro, Nueva Ecija Barcelona St., Primavera Homes, CY 2018 Basic Education Facilities Fund (BEFF) Repair and 23 MITZIE CONSTRUCTION 23-Apr-18 Cabanatuan City, Nueva Ecija Rehabilitation of Classrooms Batch 2 – Lot 38, Collado ES, Page 2 of 68 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 3 May 2018 Date No. Company Name and Address Project Name Approved Talavera South, Nueva Ecija 18CF0109 – Construction of Rainwater Collector System San Anton, San Leonardo, Nueva 24 FRAMECON BUILDERS (RWCS), Nueva Ecija 2ND DEO, 3RD and 4TH District, Nueva 23-Apr-18 Ecija Ecija JERRY R. SANTIAGO 888 Brgy. Curva, Bongabon, Road Concreting (Gymnasium to Library), NEUST Gabaldon 25 23-Apr-18 CONSTRUCTION Nueva Ecija Campus, Gabaldon, Nueva Ecija JERRY R. SANTIAGO 888 Brgy. Curva, Bongabon, Perimeter Fencing, Tabon, San Isidro Campus, San Isidro, 26 23-Apr-18 CONSTRUCTION Nueva Ecija Nueva Ecija R.C. PALLARCA 43 Don Mariano Marcos St., Proposed Two-Storey Science and Technology Building, NEUST 27 23-Apr-18 CONSTRUCTION Jaen, Nueva Ecija Gabaldon Campus, Gabaldon, Nueva Ecija 1575 V. Fugoso St., Sta. Cruz, 28 SMK BUILDER Uno Fuel Gasoline Station, Calumpit, Bulacan 23-Apr-18 Manila Brgy. Caalibangbangan, 18CF0108 – Concreting of Road, Brgy. Alua, San Isidro, Nueva 29 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City Ecija Brgy. Caalibangbangan, 18CF0111 – Concreting of Papaya – Cabanatuan Road in 30 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City Barangay San Pedro, General Tinio (Papaya), Nueva Ecija Brgy. Caalibangbangan, 18CF0110 – Concreting of Road, Brgy. Poblacion, General Tinio, 31 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City Nueva Ecija Brgy. Caalibangbangan, 18CF0060 – Concrete Slope Protection, Peñaranda River Flood 32 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City Control, Brgy. San Roque, San Leonardo, Nueva Ecija Panabingan, San Antonio, Nueva DIII-RRENIS-2018-08 – Improvement of Lateral V, ITB No. 33 AR ESBI CONSTRUCTION 23-Apr-18 Ecija IPRIIS-DIII-2018-01, Cabanatuan City, Nueva Ecija 150 Malasin Sto. Domingo, Construction of Additional 50-Bed Ward Building, San Jose City 34 M.O.M. ENTERPRISES 23-Apr-18 Nueva Ecija General Hospital, San Jose City, Nueva Ecija 150 Malasin Sto. Domingo, Construction and Rehabilitation of Barangay Poblacion Drainage 35 M.O.M. ENTERPRISES 23-Apr-18 Nueva Ecija Canal, Pobalcion, San Antonio, Nueva Ecija R.D. TALENS Zulueta, Maharlika Hi-way, 18CF0057 – Construction of Slope Protection along Pampanga 36 23-Apr-18 CONSTRUCTION & TRADING Cabanatuan City, Nueva Ecija River Control, Barangay San Roque, San Leonardo, Nueva Ecija Page 3 of 68 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 3 May 2018 Date No. Company Name and Address Project Name Approved UPRIIS-D1-CW-2018-01 – Improvement of Canal Service Road 37 G.T.Y. CONSTRUCTION Poblacion Sur, Rizal, Nueva Ecija 23-Apr-18 at DC-1, San Jose City, Nueva Ecija Ben Saturno Ave., Brgy. Sibut, 38 ADROIT CONSTRUCTION 18CE0030 – Construction of Drainage, District V, Cuyapo, Nueva 23-Apr-18 San Jose City, Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Bitas, Maharlika Highway, 39 MABB CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 39, Talugtug, Nueva 23-Apr-18 Cabanatuan City, Nueva Ecija Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Bitas, Maharlika Highway, 40 MABB CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 29, Peñaranda, 23-Apr-18 Cabanatuan City, Nueva Ecija Nueva Ecija CY 2018 Basic Education Facilities Fund (BEFF) Repair and Bitas, Maharlika Highway, 41 MABB CONSTRUCTION Rehabilitation of Classrooms Batch 2 – Lot 28, Peñaranda, 23-Apr-18 Cabanatuan City, Nueva Ecija Nueva Ecija BY ADMINISTRATION #500 Shaw Centrum, 500 Shaw Renovation of Commercial Stall, SM Telabastagan, Barangay 42 23-Apr-18 (SUNGEARS SALES INC.) Blvd., Mandaluyong City Telabastagan, City of San Fernando, Pampanga 658 Gov. F. Halili Ave., 18CD0132 Road Concreting of Brgy. Poblacion, Norzagaray, 43 ROADWORKS, INC. 23-Apr-18 Bagbaguin, Sta. Maria, Bulacan Bulacan 19TH Melencio Ext., San Josef IJK MAE CONSTRUCTION, Construction of Covered Shed for MRF (Garbage Transfer 44 Sur, Cabanatuan City, Nueva 23-Apr-18 INC. Station), Gerona, Tarlac Ecija Brgy. Caalibangbangan, 18CF0062 – Construction of Slope Protection with Earth Dike 45 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City along Pampanga River, Brgy. Apo Esquivel, Jaen, Nueva Ecija 18CF0087 – Construction of Slope Protection on Steel Sheet Brgy. Caalibangbangan, 46 A.M.P. CONSTRUCTION Piles Foundation along Pampanga River, Sta. 5+956.73 – Sta. 23-Apr-18 Cabanatuan City 6+358.33, Purok 7, Brgy. Luyos, San Antonio, Nueva Ecija Brgy. Caalibangbangan, 18CF0101 – Construction of a Concrete River Wall, Barangay 47 A.M.P. CONSTRUCTION 23-Apr-18 Cabanatuan City Burgos, San Leonardo, Nueva Ecija 18CF0094 – Rehabilitation / Improvement of Pampanga River Brgy. Caalibangbangan, 48 A.M.P. CONSTRUCTION Control, Sta. 36+986366 – Sta. 37+146.66, Brgy. La Fuente, Sta. 23-Apr-18 Cabanatuan City Rosa, Nueva Ecija Page 4 of 68 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 3 May 2018 Date No.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    68 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us