FINAL IDP.Xlsx

FINAL IDP.Xlsx

Gateshead and Newcastle CIL 2016 P06 Gateshead and Newcastle Infrastructure Delivery Plan Update (February 2014) February 2016 2 Gateshead and Newcastle Infrastructure Delivery Plan (February 2014), Update (February 2016) Feb-16 SHORT TERM MEDIUM TERM LONG TERM KEY TBC = To Be Confirmed 2011-20 2020-25 2025-30 Potential Funding Ref Scheme Location Estimated Cost (2013) Delivery Responsibility Phasing Sources 1. Critical Schemes - required to facilitate delivery of the Plan On-line road widening of A1: Coal House to the A1 in Gateshead at T1 Metrocentre £64m Highways Agency National Roads Programme 2014-15 Lobley Hill and Team [COMMITTED] Valley 2. Essential Schemes - required to facilitate development A1 Corridor through Newcastle & Gateshead, including new lane at Department for Transport Road A1: Route Based Strategy Seaton Burn to Scotswood Investment Strategy, National T2 £350m Highways England 2020+ [COMMITTED] Rd ( A1 Birtley to Coal Roads Programme, Pinch House (J65-J67); A1 Point, Local contribution Scotswood to North Brunton (J74-J79) Developer contributions. West Rd Bus Corridor - Devolved funding through Local West Rd, improved West Road and Westgate T3 £6.3m LTP, Council Transport Body / Local Growth 2014-20 junctions to prioritise bus Road, Newcastle Fund, DfT Major schemes movements funding Bensham Road/Lobley Hill Bensham Rd (A692) Bus DfT Local Pinch Point Fund, Road, incl. junction with T4 Corridor £3.4m Council developer contributions and 2013-15 Kingsway at north end of [COMMITTED] Council funding Team Valley Durham Rd Bus Corridor T5 Saltwell, Low Fell £1.6m Council LTB , developer contribution 2013-19 Phases 4-6 Gosforth Bus Corridor Phase 1 - improved DfT Cycle Safety Fund, 2013-20 Gosforth £3.5m Council, Sustrans junctions to prioritise bus Developer contributions movements. Including Gosforth Transport T6 Developer contributions. Improvements Phase 2 - Devolved funding through Local Cowgate to Haddricks Mill 2013-20 Gosforth £20m Council Transport Body / Local Growth improved junctions Fund, DfT Major schemes (incorporating Cow Hill and funding Blue House) Devolved Local Transport Body Park and ride scheme: T7 Eighton Lodge £6m Council Funding (LTB), 2015-21 Eighton Lodge Developer Contributions, Park and ride scheme: T8 Follingsby £3.5m Council 2020-25 Follingsby Developer Contributions, LTB Park and ride scheme: T9 Dunston Hill £2.6m Council 2015-21 Dunston Hill Developer Contributions, LTB Durham Road/Tyne LTB, Cycle City Ambition Fund, T10 Great North Cycleway Bridge/Great North Road £0.4m Councils 2011-15 Developer Contributions (outside of Urban Core) DfT, Council, Cycle City T11 Strategic Cycle Routes Newcastle £11.7m Council 2011-20 Ambition Fund, Partners Scotswood Road/ Council/Developer/NE Growth T12 Brideghead Improvements ( Scotswood £4.2m Council 2015-20 Deal Phase 1) Cowgate Roundabout A167, Stamfordham Rd. Local Pinch Points funding, T13 improvements /Ponteland Rd./ Two Ball £4.5m Council 2011-20 Council [COMMITTED] Lonnen Metro Reinvigoration, includes: Track, Station improvements, Structures , T14 Power , Metro Cars, smart Gateshead and Newcastle £385m Nexus Central Government Funding 2011-25 ticketing and gating, Depot works, Signalling [COMMITTED] Partical signalisation of T15 roundabout at Junction 38: Newcastle £111,000 Council Developer contributions. 2028 A69 Blucher Interchange Signal controlled junction T16 Newcastle £721,000 Council Developer contributions. 2028 39 West Rd/Silver Lonnen Signal controlled junction T17 41: A167 Stamfordham Newcastle £796,000 Council Developer contributions. 2030 Rd/Pooley Rd 1 P06 Signal controlled junction T18 42: A167 Stamfordham Newcastle £866,000 Council Developer contributions. 2025 Rd/Springfield Rd Signal controlled junction T19 45: A167 Ponteland Newcastle £881,000 Council Developer contributions. 2020 Rd/Springfield Rd Partial signalisation of roundabout at junction46: T20 Newcastle £592,000 Council Developer contributions. 2018 A167 Ponteland Road/Etal Ln Carriageway widening junction 49: B1318 Great T21 £71,000 Developer contributions. 2025 North Rd/A1056/Rotary Newcastle Council Way Signal controlled junction T22 junction 52: B6918 Newcastle £139,000 Council Developer contributions. 2030 Ponteland Rd/Station Rd Partial signalisation of roundabout at junction 4: T23 Newcastle £118,000 Council Developer contributions. 2018 A695 Scotswood Rd/Scotswood Bridge Carriageway widening T24 junction 5: A695 Scotswood Newcastle £1,036,000 Council Developer contributions. 2018 Rd/A1 slip Carriageway widening T25 junction 9: A167 Newcastle £131,000 Council Developer contributions. 2022 Stamfordham Rd/A1 Carriageway widening T26 junction 10: A167 Newcastle £546,000 Council Developer contributions. 2018 Ponteland Rd/A1 A696 Junction 11: Kingston Park T27 Rd/A1 signalisation of Newcastle £1,156,000 Council Developer contributions. 2030 roundabout and link to J17 Lane reallocation and exit T28 widening at junction 12: A1 Newcastle £220,000 Council Developer contributions. 2030 North Brunton Interchange Roundabout at T29 junction16: Newcastle £324,000 Council Developer contributions. 2015 Broadway/Kingston Park Rd Signal controlled junction T30 Newcastle £528,000 Council Developer contributions. 2027 22: Brunton Ln/Brunton Rd Signal controlled junction T31 31: B6324 Stamfordham Newcastle £696,000 Council Developer contributions. 2030 Rd/Newbiggin Lane Developer Contributions Local Flood Levy a) Raised defence or Regional Flood Defence Levy Local Authority landraising along riverbank £3.6 million Lead Local Flood Authority 2020-30 Developer to mitigate tidal flood risk Funds Flood Defence Grant in Aid (Up to 50%) b) Shibdon Meadow flood Council (L) alleviation abd wetland £250,000 Potential for use of Landfill Tax 2015 MetroGreen Flood Durham Wildlife Trust GI & W1 Alleviation & Mitigation; habitat creation and Green Infrastructure c) Surface Water Local Flood Levy Management at Regional Flood Defence Levy MetroGreen - strategic land Lead Local Flood Authority £0.2m Developer 2020-30 drainage network Funds integrated with multi- Flood Defence Grant in Aid functional green space. (Up to 50%) d) Strategic flood mitigation and river restoration of the TBC - GI delivery plans Local Authority River Derwent - including will determine site costs an c 2020-30 Developer multi-functional GI, access, ddeliverability issues flood storage. Gateshead GTI/broadband UE1 high speed open access Gateshead Rural Areas £1.72m Private Sector BDUK and Council 2013-15 [COMMITTED] Go Digital Newcastle (incorporating the Local UE2 Broadband and Super- Citywide £8-12m Council Government DCMS and Council 2013-15 Connected Cities plans) [COMMITTED] Gateshead Urban Core. Aspiration to expand later Council owned arms length National funding for energy Gateshead District Energy UE3 to Bensham, Felling. Will £13m energy services company sector 2013-15 Centre link to all major housing (ESCO) Council funding schemes and Quays. 2 P06 Essential schemes for Growth Areas GA1 Dinnington, Hazlerigg, Wideopen Village Growth Areas, Great Park and Kingston Park/Kenton Bank Foot Neighbourhood Growth Areas Junction improvements & Airport A696 to Great Park Development consortium, Local Growth Fund, ERDF, GA1.1 Indicative Access Road £20.7m 2020-30 A1 Airport, Council Developer contributions, HCA A696 Brunton Road widening A696- Brunton Lane, GA1.2 £4.5m Developers, Council Developers 2020-30 and highway Kingston Park Newimprovements primary and secondary age schools ( 7 GA1.3 Great Park , Newcastle 31.1m Developer, provider, NCC Developer contributions 2020-30+ FE secondary and 2 x 2 FE primary) New health centre NHS Local Area Team, Clinical provision (extending GA1.4 Great Park and vicinity TBC Commirssioning Group(s), GP NHS Engalnd/ GP partner 2020-30 eixtsing provision and/or partner new provision) New health centre NHS Local Area Team, Clinical GA1.5 provision (redevelopent Dinnington TBC Commirssioning Group(s), GP NHS Engalnd/ GP partner 2020-30 and extension) partner GA1.6 District Centre facilities Great Park and vicinity TBC Facility providers Consortia, providers 2025-30 GA2 Throckley Village Growth Area, Newbiggin Hall, Upper Callerton, Middle Callerton and Lower Callerton Neighbourhood Growth Areas Junction improvements & Between A696 to A69 Development consortium, Developer contributions, Single Indicative Access Road largely through £25.6m 2020-30+ Council Local Growth Fund, ERDF, HCA GA2.1 A696 to A69 development areas. New health centre NHS Local Area Team, Clinical provision (redevloping Callerton / Newbiggin Hall TBC Commirssioning Group(s), GP NHS England/ GP partner 2020-30 eixtsing provision and/or partner GA2.2 new provision) Primary age education Outer West £11.8m Developer, provider, NCC Developer contributions 2020-30 + GA2.3 provision Improved community centre Upper and Middle Developer Consortium, £1.5m Developer, provider, NCC 2020-30 GA2.4 provision Callerton vicinity providers Developer Consortium, Local Centre facilities Callerton TBC Facility Providers 2020-30 GA2.5 providers Access Road to Throckley Throckley £0.8m Developer, Council Developer 2020-30 GA2.6 North Access Road to Newbiggin Etal Way, Newbiggin Hall £0.6m Developer, Council Developer 2020-30 GA2.7 Hall GA3 West Villages - Ryton, Crawcrook, Chopwell, Sunniside, High Spen, Highfield Extension to Bus Lane on A694 to Winlaton Mill to Chopwell, High Spen, High GA3.1 £0.8m Council Developer Contributions 2017-30 support existing bus Field service A695/Greenside Road GA3.2 Crawcrook £0.2m Council Developer

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us