High-Speed Rail Design Advances

High-Speed Rail Design Advances

High-speed rail design advances By KATHLEEN RONAYNE Associated Press This December 2017 photo shows an elevated section of the high-speed rail under construction in Fresno. The California High- Speed Rail Authority’s board of directors on Tuesday approved releasing a request for qualified bidders for a $1.6 billion contract to design and construct the trains and systems that would cover a 119-mile segment of the high-speed rail project in the Central Valley. Associated Press SACRAMENTO — California officials on Tuesday moved toward awarding a $1.65 billion contract to design and construct the tracks and system for the first segment of its beleaguered high-speed rail project. The action taken by the California High-Speed Rail Authority’s board of directors was a first step in moving ahead with a contract they hope to award by next summer. It’s part of the authorities plan to get track up and running in the state’s Central Valley ahead of a 2022 deadline to meet the requirements of federal grants the Trump administration is now trying to take back. U.S. and international businesses can apply for the contract, and whoever wins it would be responsible for designing and building rail infrastructure along 119 miles in the Central Valley as well as maintaining it for a period that could be as long as 30 years. A U.S. subsidiary of German rail giant Deutsche Bahn AG has already been awarded a $30 million contract for early operation of the trains. The $1.65 billion is just a sliver of the $79 billion it’s estimated to cost to build a high-speed rail line between San Francisco and Los Angeles. The contractor would design and build all of the necessary infrastructure, including track and systems, signal systems, automatic and positive train control, platforms and overhead electrification systems and voltage stations. The state has already launched construction in the Central Valley on civil work such as building new viaducts and separating roadways from areas for track necessary to prepare for the full high- speed rail system. California’s rail authority is first trying to finish track between the Central Valley and San Francisco before turning toward Los Angeles.” .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us