Middle Section: Thlea Ma'am – Battambang, and Sri Sophorn

Middle Section: Thlea Ma'am – Battambang, and Sri Sophorn

MINISTRY OF PUBLIC WORKS AND TRANSPORT(MPWT) THE ROYAL GOVERNMENT OF THE KINGDOM OF CAMBODIA PREPARATORY SURVEY FOR NATIONAL ROAD NO. 5 IMPROVEMENT PROJECT (MIDDLE SECTION: THLEA MA'AM – BATTAMBANG, AND SRI SOPHORN – POIPET) IN THE KINGDOM OF CAMBODIA FINAL REPORT (VOLUME I MAIN REPORT) OCTOBER 2014 JAPAN INTERNATIONAL COOPERATION AGENCY KATAHIRA & ENGINEERS INTERNATIONAL EI JR (先) 14-178 (1) Exchange Rate US$ 1.0 = JPY 102.93 KHR 1.0 = JPY 0.025 As of August 2014 Location Map of Survey Area Preparatory Survey for National Road No.5 Improvement Project (Middle Section: Thlea Ma’am – Battambang, and Sri Sophorn – Poipet) TABLE OF CONTENTS Location Map Table of Contents List of Appendix List of Tables List of Figures List of Abbreviations CHAPTER 1 INTRODUCTION ................................................................................................... 1-1 1.1 Background of the Survey ................................................................................................... 1-1 1.2 Objective of the Survey ....................................................................................................... 1-1 1.3 Survey Area ......................................................................................................................... 1-2 1.4 Scope of Work ..................................................................................................................... 1-2 1.5 Survey Schedule .................................................................................................................. 1-3 1.6 Organization of the Survey .................................................................................................. 1-5 CHAPTER 2 PROFILE OF THE SURVEY AREA ..................................................................... 2-1 2.1 Physical Profile .................................................................................................................... 2-1 2.2 Socio - Economic Profile .................................................................................................... 2-9 CHAPTER 3 NATIONAL ROAD NETWORK OF CAMBODIA AND ROLE OF NATIONAL ROAD NO. 5 ..................................................................................... 3-1 3.1 National Road Network of Cambodia ................................................................................. 3-1 3.2 Development Plan ............................................................................................................... 3-2 3.3 Role of National Road No. 5 ............................................................................................... 3-7 3.3.1 Role in the National Road Network and Role as an International Arterial Road ........ 3-7 3.3.2 Benefit to Japanese Businesses ................................................................................. 3-10 3.4 Planned, Ongoing and Past Project for Rehabilitation / Improvement of NR 5 and Other Relevant Project ...................................................................................................... 3-11 3.5 Necessity of Improvement of the Middle Section and the Sri Sophorn - Poipet Section .. 3-14 CHAPTER 4 PRESENT CONDITION OF MIDDLE SECTION AND SRI SOPHORN – POIPET SECTION .................................................................... 4-1 4.1 Overall Conditions .............................................................................................................. 4-1 4.2 Geometric Structure ............................................................................................................ 4-4 4.2.1 Cross Section ............................................................................................................... 4-4 4.2.2 Horizontal Alignment .................................................................................................. 4-5 4.2.3 Vertical Alignment ...................................................................................................... 4-7 4.3 Pavement ........................................................................................................................... 4-12 i Preparatory Survey for National Road No.5 Improvement Project (Middle Section: Thlea Ma’am – Battambang, and Sri Sophorn – Poipet) 4.4 Bridge Condition ............................................................................................................... 4-14 4.4.1 Inventory of Bridges .................................................................................................. 4-14 4.4.2 Condition of Bridges ................................................................................................. 4-19 4.4.3 Condition of Bridge Members ................................................................................... 4-24 4.5 Roadside Land Use ............................................................................................................ 4-26 4.5.1 Land Use along NR 5 ................................................................................................ 4-26 4.5.2 Occupancy of ROW by Roadside Shops and Utilities .............................................. 4-28 4.6 Utilities .............................................................................................................................. 4-28 CHAPTER 5 FUTURE TRAFFIC DEMAND FORECAST ........................................................ 5-1 5.1 Methodology ....................................................................................................................... 5-1 5.2 Traffic Survey Data ............................................................................................................. 5-2 5.3 Socio-Economic Framework ............................................................................................... 5-3 5.3.1 Future Socio-Economic Framework ............................................................................ 5-3 5.4 Future OD Table .................................................................................................................. 5-7 5.4.1 Zoning System ............................................................................................................. 5-7 5.4.2 Preparation of Present OD Table ................................................................................. 5-9 5.4.3 Trip Generation and Attraction ................................................................................... 5-9 5.4.4 Future OD Matrix (Future Traffic Demand) ............................................................. 5-13 5.4.5 Modal Split ................................................................................................................ 5-15 5.5 Traffic Demand Forecast ................................................................................................... 5-15 5.5.1 Traffic Assignment .................................................................................................... 5-15 5.5.2 Peak Hour Traffic Volume and Congestion .............................................................. 5-21 5.5.3 Traffic Volume on Bypass ......................................................................................... 5-22 CHAPTER 6 NATURAL CONDITION OF SURVEY AREA/SURVEY ROAD ....................... 6-1 6.1 Hydrological Condition and Flood Records ........................................................................ 6-1 6.1.1 River System and Existing Drainage Facilities ........................................................... 6-1 6.1.2 Water Level of The Mekong River and The Tonle Sap River and Lake ................... 6-14 6.1.3 Information of Road Inundation/Flood ..................................................................... 6-18 6.1.4 Estimated Flood Discharge from Mountains ............................................................. 6-25 6.1.5 Study of the Flood of 2013 ........................................................................................ 6-31 6.2 Topographical Survey ....................................................................................................... 6-38 6.2.1 Objective ................................................................................................................... 6-38 6.2.2 Contents ..................................................................................................................... 6-38 6.2.3 Detail and Output ...................................................................................................... 6-39 6.2.4 Landmine Clearance .................................................................................................. 6-43 6.2.5 Result of Survey ........................................................................................................ 6-43 6.3 Aerial Photo Survey .......................................................................................................... 6-44 6.4 Geotechnical Investigation ................................................................................................ 6-46 ii Preparatory Survey for National Road No.5 Improvement Project (Middle Section: Thlea Ma’am – Battambang, and Sri Sophorn – Poipet) 6.4.1 CBR Tests of Existing Subgrade ............................................................................... 6-46 6.4.2 Geotechnical Investigation for Bridges ..................................................................... 6-48 6.4.3 Geotechnical Characteristics of the Survey Area ...................................................... 6-57 6.4.4 Soil Parameter ..........................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    207 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us