APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information Sr. Item Details No. 1. Name of the project/s Environmental Clearance for the Proposed Residential cum Commercial Project (“ Rajagiri Retreat” ) by M/s Rajagiri Retreat Trust 2. S. No. in the schedule 8 (a), Construction Project with built-up area 1,17,051 sq. m. 3. Proposed capacity / area / length Total Plot Area = 2.7316 ha. (27,316.30 sq.m.) /tonnage to be handled/command Total Built-up Area = 1,17,051 sq. m. area/lease area/ number of wells Total No. of Apartment (Old age) = 450 nos. to be drilled Total No. of Rooms = 25 nos. 4. New/Expansion/Modernization New (Proposed Residential cum Commercial Project) 5. Existing capacity/area etc., N.A. 6. Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ 7. Does it attract the general NO condition? If yes, please specify 8. Does it attract the specific NO condition? If yes, please specify 9. Location Re-survey nos. 149/4 (old sy. No. 939/1/8) in block no. 35, Aluva East Village, Edathala Panchayat, Aluva Taluk, Ernakulam District, Kerala. Plot/Survey/Khasra No. Re-survey nos. 149/4 (old sy. No. 939/1/8) Village Aluva East Tehsil Aluva District Ernakulam State Kerala 10. Nearest railway station/airport The nearest railway stations (Aluva Railway along with distance in Kms Station) which is located at about 5.5 km. and Cochin International Airport, Nedumbassery is at about 12.5 km. away from the project site. 11. Nearest Town, city, District Aluva Town – about 8 km. Headquarters along with distance District Headquarter - Kakkanad Civil in Kms Station – about 13.5 km. 12 Village Panchayats, Zilla Village Office :- Parishad, Municipal Corporation, Aluva East Village Office, Local body (complete postal Aluva - Pukkattupady Road, addresses with telephone nos. to Edathala, Aluva, be given) Kerala-683563. Panchayat Office :- Panchayat Secretary, Edathala Panchayat Office, Aluva - Pukkattupady Road, Edathala, Aluva, Kerala 683563. Ph. 0484 283 7132. 13 Name of the applicant M/s Rajagiri Retreat Trust 14 Registered Address 4/565, Santhi Nilayam Centre, Chunangamvely, Erumathala Post, Ernakulam, Kerala-683112. Address for correspondence : M/s Rajagiri Retreat Trust Rajagiri Hospital, Chunangamvely, Aluva, Ernakulam, Kerala-683112. Name Fr. Johnson Vazhapppilly CMI Designation(Owner/Partner/CEO) Secretary & Treasurer Address M/s Rajagiri Retreat Trust Rajagiri Hospital, Chunangamvely, Aluva, Ernakulam, Kerala-683112. Pin Code Kerala-683112. E-Mail [email protected] [email protected] Telephone No. 0484-6655000 Mobile No. 09895497262 Fax No. Nil 16 Details of Alternative Sites Not Applicable examined, if any. Location of Village-District-State these sites should be shown on a 1. topo sheet 2. 17 Interlinked Projects Not applicable 18 Whether separate application of Not applicable interlinked projects has been submitted? 19 If yes, date of submission Not applicable 20 If no, reason Not applicable 21 Whether the proposal involves approval/clearance under: If yes, details of the same and their status to be given. (a) The Forest (Conservation) NO Act, 1980? (b) The Wildlife (Protection) Act, NO 1972? (c) The CRZ Notification, 2011 ? NO 22 Whether there is any NO Government Order / Policy relevant / relating to the site? 23 Forest land involved (hectares) NO 24 Whether there is any litigation NO pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation / No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes There will be permanent change in land change in land use, land cover use, land cover or topography including or topography including increase in intensity of land use. increase in intensity of land use The present project is a residential cum (with respect to local land use commercial project and is located at plan) Aluva Village which is falling in Panchayat limits of Edathala Grama Panchayat, Ernakulam District, Kerala. During construction phase, about 200 workers (average) will be at site. During operation phase, on full occupancy of housing project, the maximum population expected is 6,505 persons (fixed / floating) and hence there is increase in the intensity of land use. (Source: population is calculated based on NBC) 1.2 Clearance of existing land, Yes There are some of native species of vegetation and buildings? trees and different varieties of shrubs, herbs, grass & climbers at site. For the development of the proposed project, existing trees, different varieties of shrubs, herbs, grass & climbers will be cleared. 1.3 Creation of new land uses? Yes The new land use will be for residential cum commercial development project. 1.4 Pre-construction investigations Yes Pre-construction Soil Investigation has e.g. bore houses, soil testing? been carried out for the site. It is observed that the wate r table is encountered at higher level. 1.5 Construction works? Yes Construction of residential cum commercial project for residential facility for old age homes, commercial area with supporting infrastructure facilities . Internal roads for movement inside the complex will be constructed. 1.6 Demolition works? No Not applicable 1.7 Temporary sites used for Yes Temporary sheds constructed for construction works or housing housing of construction workers (about of construction workers? 200 persons). 1.8 Above ground buildings, Yes It is proposed to construct residential structures or earthworks cum commercial development for including linear structures, cut residential facility of old age homes, and fill or excavations commercial area with supporting infrastructure facilities within the site. Excavation of earthwork for foundation of structures & basement work will be carried out. The top soil which is fertile will be kept at site for landscaping work. The excavated earth will be used for back filling wo rk and for internal road construction purposes. There is a level difference of about 10 m. between north to south side of the project site. This level difference is made use of to the maximum possible level to accommodate the parking & other facilities. RCC retaining walls will be constructed wherever required for slope stability. 1.9 Underground works including Yes No underground works including mining mining or tunneling? / tunneling required except the work and foundation work for the structures. 1.10 Reclamation works? No Not applicable 1.11 Dredging? No No dredging work required. 1.12 Offshore structures? No No offshore structure required. 1.13 Production and manufacturing No No production / manufacturing process processes? involved. 1.14 Facilities for storage of goods Yes Separate raw material store of cement or materials? and other construction materials is made within the project premises. Bricks and steel laid in open. 1.15 Facilities for treatment or Yes Construction phase :- disposal of solid waste or liquid Solid waste generation from the project effluents? during construction phase will be about 80 Kg/day and domestic sewage will be about 11 KL/day. The non-biodegradable waste and other packaging material will be sold to the vendors. The bio- degradable solid waste will be disposed in a bio-bin system for microbial composting and a mobile STP for the treatment of domestic sewage from the labour colony. Operation phase :- Solid waste generation will be about 976 Kg/day and w hich will be collected separately as Bio-degradable and Non- biodegradable waste as per the MSW Rules, 2000. The non-biodegradable and recyclable wast e would be sold to the vendors. The biodegradable waste would be sent to the bio-gas generation plant / bio-bin system. Further, the spent oil from the D.G. sets (defined as hazardous waste) will be sold to C.P.C.B. approved recyclers. Further, the spent oil from the D.G. sets (defined as hazardous waste) will be sold to C.P.C.B. approved recyclers. Effluent :- The domestic sewage about 191 KL/day will be generated which will be treated through proposed Sewage Treatment Plant to be installed within the project premises. 1.16 Facilities for long term housing No The proposed project is a residential of operational workers? cum commercial project which includes apartments for old age home, bachelor accommodation and commercial area with supporting infrastructure facilities and therefore no accommodation facility is proposed for the operational workers. 1.17 New road, rail or sea traffic No Not applicable during construction or operation? 1.18 New road, rail, air waterborne No Not applicable or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not applicable lines or pipelines? 1.21 Impoundment, damming, No Not applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable 1.23 Abstraction or transfers of Yes Water from wells. It is proposed to use water form ground or surface the well water for the project. waters? 1.24 Changes in water bodies or the No There is no changes in water bodies or land surface affecting drainage the land surface affecting drainage or or run-off? run-off. 1.25 Transport of personnel or Yes Transportation of personnel / material materials for construction, during the construction and operation operation or decommissioning? phase is envisaged. In the construction phase, approx. 14-16 trucks / day is envisaged for transportation of materials.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages15 Page
-
File Size-