Boiler Economizer Systems Presented By: Hayward Burton, H.V

Boiler Economizer Systems Presented By: Hayward Burton, H.V

Exhaust Heat Recovery Boiler Economizer Systems Presented by: Hayward Burton, H.V. Burton Co. THE CAIN INDUSTRIES FAMILY OF BOILER ECONOMIZERS “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com Overview • Most boilers have a combustion efficiency of 78-82%. • Stack energy loss is typically 18-22%. • Boiler exhaust temperatures exiting into the atmosphere: 350º - 600º F. • Economizers recover a portion of the stack loss and return the energy (Btu) to the system in a usable form such as pre-heated water. • Economizers increase efficiency thus reducing fuel costs. Average efficiency increase is 4-7%. • Typical simple payback of an installed economizer is 6 months to 3 years. Average ROI (Return on Investment) for economizer and installation is 18 months. “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com 1 System Configuration “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com Economizer Applications Steam Boiler with Continuous Modulating Feedwater Preheating boiler feedwater “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com 2 Economizer Applications Steam Boiler with On/Off Feedwater Preheating boiler feedwater “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com Economizer Applications Steam Boiler with 50% or More Make-up Water Preheating make-up water “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com 3 Economizer Applications Hot Water Boiler Preheating return water loop “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com Economizer Product Lines: Cylindrical Cain Cylindrical Economizers: •Compact • Lightweight • Hinged stainless steel access doors • Stainless steel internal exhaust gas bypass “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com 4 Economizer Product Lines: Rectangular Cain Rectangular Economizers: • Individually removable tubes • Stainless steel interior shell • Hinged full face access door • Stainless steel internal exhaust gas bypass “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com Installation Before & After Before After Before After “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com 5 Case Study #1 Location: Sparrow Hospital, Lansing, MI Boiler: 800 HP Steam Boiler Exhaust gas temp before economizer: 370º F Exhaust gas temp after economizer: 295º F Btu transferred into boiler feedwater: 2954 MBtu/hr Capital cost: $31,662 Annual savings: $65,592/year Simple payback: 5.8 months Installation cost not included in example “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com Case Study #2 Location: Dow Corning Corp., Midland, MI Boiler: 2500 HP Steam Boiler Exhaust gas temp before economizer: 450º F Exhaust gas temp after economizer: 332º F Btu transferred into boiler feedwater: 592 MBtu/hr Capital cost: $44,061 Annual savings: $217,038/year Simple payback: 2.4 months Installation cost not included in example “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com 6 Economizer Proposal To receive a detailed proposal: 1. Gather information: 2. Complete simple 3. Proposal issued, typically Minimum criteria for potential Application Data Form: within 24 hours: boiler economizer application: Available at www.cainind.com: Cain Proposal includes: • Hours of Operation Basic information: • Quotation i.e. 8 hrs/day • Boiler type and size • Performance and projected fuel savings 5 days/week • Fuel type • Equipment payback 50 weeks/year • Economizer submittal and dimensions (2000 hours) • Exhaust gas data • Exhaust stack dimensions • Flow diagram • Minimum Stack Temperature • Inlet water temperature • Cut sheets, technical information, i.e. 350º F literature • Fuel Cost i.e. .70/therm “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com Summary • Economizers reduce energy costs by recovering Btu lost in boiler exhaust waste heat. • Typical economizer applications are: preheating boiler feedwater, make-up water, hot water return loop. • Typical payback of an installed economizer is 6 months to 3 years (equivalent to 75% ROI per year of boiler operation). THE CAIN INDUSTRIES FAMILY OF BOILER ECONOMIZERS “Manufacturing Waste Heat Transfer Products to Save Energy” www.cainind.com 7.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us