Pre-Qualification-Of-Contractor-For-Club

Pre-Qualification-Of-Contractor-For-Club

PRE-QUALIFICATION DOCUMENT FOR CONTRACTORS CONSTRUCTION OF ML&C CLUB WALTON CANTT LAHORE Walton Cantonment Board (WCB) Ahmad Bukhsh Road, Lahore Pakistan Pre-Qualification of Constructors TABLE OF CONTENTS DESCRIPTION PAGE NO. 1.0 INTRODUCTION ............................................................................................ 1 1.1 General .................................................................................................. 1 1.2 Subletting of work .................................................................................. 1 2.0 INVITATION FOR PREQUALIFICATION ................................................ 2 3.0 INSTRUCTIONS TO APPLICANTS ............................................................ 4 3.1 Submission of Applications ................................................................... 4 3.2 Qualification Criteria ............................................................................. 5 3.2.1 General ....................................................................................... 5 3.2.2 General Experience .................................................................... 5 3.2.3 Personnel Capabilities ................................................................ 6 3.2.4 Equipment Capabilities .............................................................. 6 3.2.5 Financial Position ....................................................................... 7 3.2.6 Litigation History ...................................................................... 8 3.3 Joint Venture (JV) .................................................................................. 8 3.4 Conflict of Interest ................................................................................. 9 3.5 Updating Prequalification Information .................................................. 9 3.6 Other Factors ......................................................................................... 9 4.0 EVALUATION CRITERIA .......................................................................... 10 ANNEXURES A. Letter of Application .................................................................................................. 11 Forms Application Form A-1. General Information .............................................................. 14 Application Form A-2. General Experience Record ................................................... 15 Application Form A-3. Joint Venture Summary ......................................................... 16 Application Form A-4. Particular Experience Record ................................................ 17 Application Form A-5. Details of Contracts of Similar Nature and Complexity ....... 18 Application Form A-6. Summary Sheet: Current Contract Commitments/ Works in Progress ................................................................. 19 (ii) Pre-Qualification of Constructors DESCRIPTION PAGE NO. Application Form A-7. Personnel Capabilities ........................................................... 20 Application Form A-8. Candidate Summary .............................................................. 21 Application Form A-9. Equipment Capabilities ......................................................... 22 Application Form A-10. Financial Capability .............................................................. 23 Application Form A-11. Litigation History .................................................................. 25 (ii) Pre-Qualification of Constructors (ii) Pre-Qualification of Constructors 1.0 INTRODUCTION 1.1 General The basic aim of the pre-qualification is to select, the contractors that are suitably qualified to perform the Construction of ML&C Club at Ahmad Bukhsh road Walton Cantt Lahore. heaving plot area 15.33 kanals 1.2 Subletting of Work The subletting of work or part of work shall not be allowed under any circumstances without prior approval of Walton Cantonment Board. Any pre-qualified company found violation this condition shall be disqualified/delisted. (5) Pre-Qualification of Constructors 2.0 INVITATION FOR PRE-QUALIFICATION Date: _____________ (Notice issue date) Contract No.(s)________________________ 1. The Walton Cantonment Board working under the administrative control of Ministry of Defence (ML&C Department),Ahmad Bukhsh Road has been entrusted and provided funds to finance the cost for Construction of ML&C Club at Ahmad Bukhsh road Walton Cantt Lahore, to eligible payments under the contract(s) for which this Invitation for Pre- qualification is issued. 2. The Walton Cantonment Board working under the administrative control of Ministry of Defence (ML&C Department), Ahmad Bukhsh Road hereinafter the Employer intends to prequalify constructors for this project “Construction of ML&C Club at Ahmad Bukhsh road Walton Cantt.” 3. Pre-qualification is open to constructors/joint ventures of constructors who are registered with PEC in Category (C-3) and above in relevant PEC code for Construction and Operation of Engineering Works, described in para 2 mentioned hereinabove. Applications may be submitted for pre-qualification for the above Works. 4. Category C-3 Or above PEC registered constructors may obtain the prequalification documents from office of the Walton Cantonment Board (WCB), Ahmad Bukhsh road Walton Cantt 5. The request must clearly state “Request for Pre-qualification Documents” Construction of ML&C Club at Ahmad Bukhsh road Walton Cantt Lahore The documents are available for a non refundable fee Rs. 1000/-. 6. A minimum requirement for pre-qualification will be to have successfully completed 50% Marks each category i.e. in financial soundness, personal capabilities, experience record and equipments capabilities. 7. Applications for Pre-qualification must be delivered in sealed envelopes by hand or through registered mail, to:- Cantonment Board Walton Ahmad Bukhsh road on 20.6.- 2019 till 1100 hrs. Pre-qualification documents / application will be opened the same day at 1130 hrs. and be clearly marked “Application for Pre-qualification for: Construction of ML&C Club at Ahmad Bukhsh road Walton Cantt Lahore, Name of the Contract ______________________________________________________ Address _________________________________________________________________ Contact Number __________________________________________________________ 8. The Walton Cantonment Board reserves the right to accept or reject late applications. 9. Applicants will be informed, in due course, of the result of the evaluation of applications. Only the firms of constructors and joint ventures prequalified under this process will be invited to bid. (6) Pre-Qualification of Constructors 3.0 INSTRUCTIONS TO APPLICANTS 3.1 Submission of Applications 3.1.1 Applications for pre-qualification (one original and one copy) must be received in sealed envelopes to be delivered by hand or through registered mail to:- Walton Cantonment Board, Ahmad Bukhsh road not letter than dated 20.06-2019 till 1100 hrs Pre-qualification documents / application will be opened the same daat 1130 hrs. and be clearly marked “Application for Pre-qualification” for Construction of ML&C Club Address. Ahmad Bukhsh Road Walton Cantt. Ph. # 042-99220406, Fax 042-99220161 Website: [email protected]. The Employer reserves the right to accept or reject the late applications. 3.1.2 The name and mailing address of the Applicant shall be clearly marked left hand on the envelope. 3.1.3 The applications shall be prepared in the English language. Information in any other language shall be accomplished by its translation in English. Employer reserves the rights to reject the Pre-qualification incase, of non-compliance of the above requirement. 3.1.4 The Applicants must respond to all questions and provide complete information as advised in this document. Any lapses to provide essential information may result in dis-qualification of the Applicant. 3.1.5 Any mis-statement(s) by the Aplicant will result into his disqualificiation at any stage (7) Pre-Qualification of Constructors 3.2 Qualification Criteria 3.2.1 General Pre-qualification will be based on all the criteria given in succeeding paras 3.2.2 to 3.2.6 regarding the Applicant’s Financial Soundness, Experience Record, Personnel Capabilities and Equipment Capabilities as demonstrated by the Applicant’s responses in the forms attached to this letter. The WCB reserves the right to waive minor deviations, if these don’t materially affect the capability of an applicant to perform the contract. Sub-contractor’s experience and resources shall not be taken into account in determining the Applicant’s compliance with the qualifying criteria. The WCB consider the following criteria for Prequalification of Contractors:- Sr. No. Category Weightage/Marks 1. Financial Soundness 30 2. Experience Record 35 3. Personnel Capabilities 15 4. Equipment Capabilities 20 Total: 100 Note: Prequalification status shall be decided on the basis of Pass/Fail basis. The applicant must secure at least 50% score in each category. The further detailed criteria for each category may be developed as given under the each head as follows: 3.2.2 General Experience Credit Marks for experience shall be awarded on the basis of following qualifications: Maximum Sr.No. Description Points i) Projects having cost more than 100 Million of related 15 building works like, Multy Storys building, sports, Recrational Building Project etc completed over latest 10 years. (5 marks for each project). General Building Project having cost morethan 100 (M) (3 marks for each Project) ii)

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    30 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us