The Confederation Bridge, PEI, Canada

The Confederation Bridge, PEI, Canada

The Confederation Bridge, PEI, Canada Wind Engineering Study Client Engineer Year Tested Strait Crossing Inc. Jean Muller Engineers, Inc 1988 - 1994 & Stanley Engineers Length of Superstructure Main Span Lengths Navigation Span Deck Height 12.91 kilometres 42 spans at 250 metres 60.3 metres Marine Span Deck Height Deck Depth Deck Width 49 metres Varies 4.5 to 14 metres 12 metres The Project The Wind Tunnel Studies (cont’d) The Confederation Bridge is a two-lane precast concrete A section model study: i) for the development of static bridge between Borden Prince Edward Island and Cape force coefficients on three representative deck depths, to Tormentine, New Brunswick in Eastern Canada over the be used in the wind loading model; ii) to estimate wind Northumberland Straits. Alternate spans consist of rigid speeds over the deck as it would affect the drivability of frame and cantilever / drop-in section designs. Wind en- the bridge and iii) with scaled dynamic structural proper- gineering studies were carried out for the Confederation ties of the prototype. The section model was tested in Bridge in order to optimise the design loads for wind for smooth flow, as well as grid generated turbulent wind. the bridge while under construction and after completion. Tests of a full aeroelastic model of the bridge in turbulent boundary layer flow included three stages of construction The Wind Tunnel Studies of typical marine and navigation spans. A meteorological study, which included the analysis of A consistent design methodology was developed that in- existing records at six locations near the project site, tegrated the wind tunnel test data with the full-scale prop- comprised of both surface and upper-level data. Two im- erties of the prototype. Wind loads for each span of the portant sources of data were the ferry terminals, which bridge were defined using a gust factor approach that de- were located in close proximity to the abutments of the fined the loading for the fully completed bridge, as well as bridge. the critical double and single cantilever stages of con- struction. Alan G. Davenport Wind Engineering Group The Boundary Layer Wind Tunnel Laboratory The University of Western Ontario Faculty of Engineering, London, Ontario Canada, N6A 5B9 Tel: (519) 661-3338 Fax: (519) 661-3339 FSBR/04/September 2000/PK Internet: www.blwtl.uwo.ca E-mail: [email protected] Last Printed: June 26, 2007 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us