2018 Annual Resident LOA Meeting March 29, 2018

2018 Annual Resident LOA Meeting March 29, 2018

2018 Annual Resident LOA Meeting March 29, 2018 Advisory Committee • Pat Bologna, Keith Graveline, Casey Patrician, Linda Ridlon • Each member lives in a different neighborhood but represents the residents in the entire community • They produce “The Scoop” newsletter to keep residents informed, additional copies can be found in the mail room • Email Advisory Committee with any issues • Primary conduit to ADM/Redbrook Committees • The community has several committees that are run by residents • Sign up for committees is always welcome Redbrook Statistics • By the end of 2018 we anticipate having over 175 Redbrook Homeowners • Many homeowners come from the Plymouth/South Shore area, 20% from out of state Builder Update • Valle o First three neighborhoods are sold out o Building the White Clover Neighborhood – 36 homes nd o Building the 2 Phase of Southview – 6 homes • Stabile st o 1 Phase of Winterberry is sold out o Building on Summersweet Circle o Later this year will start building on Daylily and Bearberry • Whitman o Foundations for Townhomes are underway o Over the next 3 years the first 104 townhomes will be built • New Neighborhoods o Around the perimeter of the townhomes may have smaller duplexes instead of single- family homes o Area K &L – we have not chosen a builder yet, plan to have 70+ homes Redbrook Apartments • We have chosen Campanelli to partner with for the Redbrook Apartments • There will be 184 units • We will use our architects • Demographics will be single professionals of all different ages • Commercial Medical Building • Will be one-story, approximately 2,700 square feet • Possible tenants could include, Family Practice, Dry Cleaner, Physical Therapist, ATM • Will have set hours of operation • 10 affordable units Commercial Medical Building • Will be one-story, approximately 6,500 square feet • Possible tenants could include, Family Practice, Dry Cleaner, Physical Therapist, ATM • Will have set hours of operation Future Commercial Building Update • Between the Post Office & Farmers Table we are looking into possibly adding 2 more local restaurants and a small general store. • Could have UPS store (shared workplace) • Residents want Karen Makepeace back • Talking with some grocery stores Water & Wastewater • Water system has one well (private company rates regulated by the state) • Wastewater deferred cost 2.5M • Wastewater system is part of LOA Offsite Infrastructure • Long Pond and Ship Pond in process, will be completed by spring of 2018 • Halfway Pond & Bourne Road, construction will start in spring/summer of 2018 • Long Pond and Clark Road, construction to start in spring/summer of 2018 • Long Pond and Halfway Pond, construction will not start until 2019 • If residents have interest Dan will host a meeting to review Offsite Traffic Amenities • Trails o Upgrades for natural view o Create more trails near superintendent’s area • YMCA o Hoping to put in a pool in 2019 • Superintendent area will be staging area for events • Kayak Storage o Will work on putting a storage area at White Island Pond/Agawam Area • Dog Park o Committee will look for spots for a new area for pets LOA Financials • Revenue is off a bit due to Winterberry Neighborhood getting off to a late start • We are getting bids for trash • Looking to have Garden Club do some of the work around the islands Collaboration with the Town of Plymouth • Applying for state grant to help construct Wareham Road • Restoring Foreman’s House and Barn Questions & Answers • Advisory Board to have a meeting about the DPU process • Gas Station o No one has approached us yet o If we do it will be out on Bourne Road • Assisted Living o Looking into having an 80-100 bed facility o About 2-3 years away • Situation with Foster o Foster is one onsite landscape contractor o They do some planting and plowing o They also do work for The Valle Group o We will be bidding for landscape contractor for 2018/2019 season o Inkberry and Common Areas are incomplete • Construction Vehicles/Vendors out of Community o Sent an email to builders to send to all their vendors with rules o No work on Sunday’s unless we approve in advance • Inkberry Traffic Impact o Focus is on closed loop/walking trail o Represented to some as a walking trail not a road o Casey to set up a neighborhood meeting with Dan to discuss this issue further o Dan will review options with Plymouth Fire and Engineering • Compost Piles o Dick will coordinate • All residents should go through Gigi Murphy with any questions/concerns o [email protected] o 508-322-4009 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us