The Sustainable Freight Railway: Designing the Freight Vehicle – Track System for Higher Delivered Tonnage with Improved Availability at Reduced Cost SUSTRAIL

The Sustainable Freight Railway: Designing the Freight Vehicle – Track System for Higher Delivered Tonnage with Improved Availability at Reduced Cost SUSTRAIL

The sustainable freight railway: Designing the freight vehicle – track system for higher delivered tonnage with improved availability at reduced cost SUSTRAIL Grant Agreement n°: 265740 FP7 - THEME [SST.2010.5.2-2.] Project Start Date: 2011-06-01 Duration: 48 months D1.4 Route summary: Track characteristics, condition and economic data Responsible: ADIF Due date of deliverable: 29/02/2012 Actual submission date: 30/04/2012 Work Package Number: WP 4 / Task 1.4 Dissemination Level: PU Status: Version 1 Leader of this deliverable: Maria García Santiago, ADIF Prepared by: Maria García Santiago, ADIF Enrique Mario García Moreno, ADIF Francis Franklin, UNEW Andrew Jablonski, NR Anthony Whiteing, UNILEEDS Mirena Todorova, VTU, in cooperation with NRIC David-Ibán Villalmanzo Resusta, ADIF Verified by: Paul Richards, NR Dissemination Level PU Public PU –V1 Page 2 of 56 Document History Version Date Author/s Description rev1 8-2-12 Maria García Santiago Deliverable 1.4 Enrique Mario García Moreno rev2 14-3-12 Maria García Santiago Deliverable 1.4 Enrique Mario García Moreno rev3 26-3-12 Maria García Santiago Deliverable 1.4 Enrique Mario García Moreno David-Ibán Villalmanzo Resusta rev4 26-3-12 Clemente Fuggini Editing and formatting adjustments - - Contributions by: Andrew Jablonski UK Route Anthony Whiteing Economics 4-4-12 Francis Franklin Bulgarian route Draft 2 7-4-12 Removed appendix Draft 3 8-4-12 (Bulgarian data provided by Conclusions VTU and NRIC) Editing / formatting Rev5 11-4-12 Maria García Santiago Spanish Route Enrique Mario García Moreno David-Ibán Villalmanzo Resusta Version 1 22-4-12 Francis Franklin Final edits D1.4 Route summary: track characteristics, condition and economic data PU –V1 Page 3 of 56 Table of Contents 1. INTRODUCTION .............................................................................................................................. 6 2. SPANISH ROUTE: MEDITERRANEAN CORRIDOR ................................................................ 8 2.1 HISTORICAL BACKGROUND .................................................................................................................................. 8 2.2 ACTUAL SITUATION ............................................................................................................................................ 8 2.3 CONCLUSIONS OF SPANISH ROUTE ...................................................................................................................... 19 3. U.K. ROUTE ..................................................................................................................................... 20 3.1 HISTORICAL BACKGROUND ................................................................................................................................ 20 3.2 ACTUAL SITUATION .......................................................................................................................................... 20 3.2.1 Southampton to Nuneaton ................................................................................................................. 20 3.2.2 Felixstowe to Nuneaton ...................................................................................................................... 27 3.2.3 Nuneaton to Crewe – Slow line of the West Coast Main Line ............................................................ 30 3.3 CONCLUSIONS FROM THE U.K. ROUTES ............................................................................................................... 31 4. BULGARIAN ROUTE .................................................................................................................... 33 4.1 OVERVIEW ..................................................................................................................................................... 33 4.2 SECTION CHARACTERISTICS ................................................................................................................................ 37 4.3 CONCLUSIONS OF BULGARIAN ROUTE .................................................................................................................. 48 5. ECONOMICS: DATA FOR LCC/RAMS ...................................................................................... 49 5.1 DATA COLLECTION METHODOLOGY ..................................................................................................................... 49 6. CONCLUSIONS ............................................................................................................................... 54 7. REFERENCES ................................................................................................................................. 56 D1.4 Route summary: track characteristics, condition and economic data PU –V1 Page 4 of 56 List of Figures FIGURE 2.1 THE AGE OF THE MATERIALS (RAIL, SLEEPERS AND BALLAST) OF THE MEDITERRANEAN CORRIDOR 9 FIGURE 2.2 TRACK QUALITY OF THE MEDITERRANEAN CORRIDOR .................................................................... 10 FIGURE 3.1 AGE IN YEARS: RAIL, SLEEPERS AND BALLAST. ................................................................................ 22 FIGURE 3.2 A POSSIBLE RELATIONSHIP BETWEEN AVERAGE RESIDUAL LIFE OF THE RAIL AND THE NUMBER OF DEFECTS. ....................................................................................................................................................... 23 FIGURE 3.3 AGE OF RAILS, SLEEPERS AND BALLAST (BML1). ............................................................................ 25 FIGURE 3.4 AGE OF RAILS, SLEEPERS AND BALLAST (DCL). ............................................................................... 25 FIGURE 3.5 AGE OF RAILS, SLEEPERS AND BALLAST: FELIXSTOWE TO NUNEATON. ........................................... 28 FIGURE 3.6 AGE OF RAIL, SLEEPERS AND BALLAST (EMP). ................................................................................ 28 FIGURE 3.7 AGE OF RAIL, SLEEPERS AND BALLAST (NUNEATON TO CREWE). .................................................... 31 FIGURE 4.1 PODUJANE MARSHALLING YARD, SOFIA, NO LONGER ACTIVE. ......................................................... 33 FIGURE 4.2 PLOVDIV MARSHALLING YARD. LEFT: VIEW OF THE HUMP. RIGHT: VIEW OF THE ASSEMBLY AREA FROM THE HUMP. ........................................................................................................................................... 33 FIGURE 4.3 CONTAINER TRAFFIC AT DRAGOMAN (LEFT) AND PAZARDJIK (RIGHT), INCLUDING TANKS IN INTERMODAL FRAMES. .................................................................................................................................. 34 FIGURE 4.4 CONTAINER TRAFFIC AT DRAGOMAN: FLATBED WAGONS WITH STANCHIONS CARRYING TWO CONTAINERS. ................................................................................................................................................. 34 FIGURE 4.5 LOCOMOTIVE AND COACHES AT IHTIMAN. ....................................................................................... 34 FIGURE 4.6 KALOTINA STATION ON THE BRANCH LINE TO THE COAL MINE. ....................................................... 35 FIGURE 4.7 LEFT: STRETCH OF TRACK WEST OF DRAGOMAN. RIGHT: STEEL BRIDGE BETWEEN DRAGOMAN AND THE SERBIAN BORDER. .................................................................................................................................. 35 FIGURE 4.8 TRACK WITH ‘TIE-PLATE FASTENING WITH PRESSING CLAMP’: ON WOODEN SLEEPERS AT KALOTINA ON THE BRANCH LINE (LEFT), AND ON CONCRETE SLEEPERS AT IHTIMAN (RIGHT). ....................................... 36 FIGURE 4.9 VOSSLOH W 14 RAIL CLAMPS ON CONCRETE SLEEPERS WEST OF DRAGOMAN (LEFT) AND AT PAZARDJIK (RIGHT). ...................................................................................................................................... 36 FIGURE 4.10 LEFT: NEWLY LAID DOUBLE TRACK WITH CWR AND ELECTRIFICATION AT SADOVO EAST OF PLOVDIV. RIGHT: CLOSE-UP OF WELDS AND VOSSLOH W 14 RAIL CLAMPS. ................................................. 37 D1.4 Route summary: track characteristics, condition and economic data PU –V1 Page 5 of 56 List of Tables TABLE 1.1 DATA TO BE COLLECTED AT KEY LOCATIONS ...................................................................................... 7 TABLE 2.1 NUMBER AND TYPE OF SWITCHES ...................................................................................................... 10 TABLE 2.2 P.K. 3.765 – P.K. 7.238 LOCATED IN THE CABAÑAL TUNNEL .............................................................. 11 TABLE 2.3 P.K 15.132 LOCATED IN MASSAFASSAR STATION. .............................................................................. 12 TABLE 2.4 P.K 48.000 – P.K. 69.000 LOCATED BETWEEN MONCOFAR AND CASTELLÓN. .................................... 13 TABLE 2.5 P.K. 82.100– P.K. 90.700 LOCATED BETWEEN BENICASSIM AND OROPESA. ....................................... 14 TABLE 2.6 P.K. 110.000 – P.K. 119.000 LOCATED BETWEEN TORREBLANCA AND ALCALÁ DE CHIVER. ............. 15 TABLE 2.7 P.K. 147.000 LOCATED IN THE AREA OF VINAROZ. ............................................................................ 16 TABLE 2.8 P.K. 214.900 – P.K. 276.000 LOCATED BETWEEN BIFURCACIÓN CALAFAT AND TARRAGONA ........... 17 TABLE 2.9 P.K. 275.100 LOCATED IN TARRAGONA CLASIFICACIÓN .................................................................... 18 TABLE 3.1 ROUTE SUMMARY: SOUTHAMPTON TO NUNEATON ..........................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    56 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us