Jackson Avenue at Pulaski Bridge Pedestrian Improvements & Network Redesign

Jackson Avenue at Pulaski Bridge Pedestrian Improvements & Network Redesign

Jackson Avenue at Pulaskit Bridge e e Pedestrian Improvements & Networkr Redesign 48th Avenue t S h t 1 1 49th Avenue 49th Avenue e u n e e g v d A i r n B o s i k k c a s J a l u P Pedestrian Projects Group Office of Alternative Modes Traffic Operations Bureau Final Plan April 20, 2009 Gateway & nexus between: Brooklyn & Queens, Hunters Point & Long Island City Pedestrian safety complaints New residential buildings More foot traffic & cyclists Neighborhood in need of amenities Traffic approaching Jackson Avenue from Pulaski Bridge No crosswalk Bus stop to east – subway west Numerous vehicle-pedestrian conflicts NORTH Bus stop to east – subway west Existing Marking Plan Subway Bus Stop Numerous pedestrian-vehicle conflicts No crosswalk Adds new signalized crosswalk at Bridge Proposed Plan Subway Bus Stop Provides safe connection between B61 bus stop Proposed Plan and #7 train Subway Bus Stop Proposed Plan Right-turns off Bridge ONLY from service road Proposed Plan Provides protected signal phase for right turning vehicles & eliminates conflicts during WALK phase – east crosswalk Proposed Plan Adds pedestrian refuge islands for crossing comfort Channelizes turning vehicles to eliminate conflicts Re-characterizes street as walkable & appealing th Avenue conflicts Street Direction Changes Eliminates right turns Bridge & westbound47th A v49enue t e e r t t Circulation Options S 47th Road e t e s r 1 t e 2 S u n h t e v 1 1 A n o s k c 8th Avenue a 4 J d r a v e l u 49th Avenue o 49th Avenue B n t o e n e r r t e S V e h t g t e 1 e d u 1 50th Avenue i e n r r e t v B S i A h t n k 1 o s s 1 a k l c a u J P 51st Avenue Jackson Avenue at Pulaski Bridge Recent Bicycle Improvements Bicycle intersection markings to Pulaski Bridge shared path installed Summer 2008 Covered Bicycle Parking at Jackson Avenue & 50th Avenue Subway Station Streetscape Enhancements Landscaping adds environmental benefits Existing Greenstreets Bridge island expanded Streetscape Enhancements LOS Analysis Existing Proposed C/C/C C/C/C C/B/B E/B/C C/C/C C/B/C AM/MD/PM 2 2 6 1 4 8 5 8 / / / / 2 1 4 1 Traffic Network - Existing 1 2 5 7 / / / / 1 1 8 1 9 1 2 1 2 0 1 6 9 /1 1 0 4 0 /1 4 /1 2 /9 8 0 0 /3 /1 5 9 4 1 8 /5 2 7 /1 / 0 2 3 3 /7 7 54/56/46 72/69/51 409/309/481 282/197/267 687/440/557 282/192/267 7/24/18 287/197/153 2 2 31/41/33 4 7 3 /1 1 /4 9 8 7 / 2 1 2 7 09 / / 4 7 26 6 / 3 AM/MD/PM 3 Timeline • Community Board approved February • Construction complete May.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us