Florida Department of Transportation

Florida Department of Transportation

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT SIX MIAMI-DADE COUNTY PROJECTS TENTATIVE WORK PROGRAM FISCAL YEARS 2019/20 20 THRU 2023/2024 as of NOVEMBER 7, 2018 PROJECT INFORMATION IS SUBJECT TO CHANGE The Department’s Mission “The Department will provide a safe transportation system that ensures the mobility of people and goods, enhance economic prosperity and preserves the quality of our environment and communities.” Plan Status: TENTATIVE ; Florida Department of Transportation ; Effective: 11/07/2018 10.43.24 Budgeting District: 06 ; 5-Year Transportation Plan ($000) ; Run: 11/07/2018 10.43.24 Detail Report: By Workmix w/Item ; Fiscal Year: 2020 thru 2024 Miami-Dade County Highways: Interstate ITEM DESCRIPTION TYPE WORK LENGTH PHASE 2020 2021 2022 2023 2024 SR 93/I-75 RAMP SB TO SR 826 AT NW 138 STREET REPAIR 4299961 BRIDGE # 870604 BRIDGE-REPAIR/REHABILITATION .102 CONSTRUCTION 2,005 0 0 0 0 4419671 SR 112/I 195 OVER WESTSHORE WATERWAY BRIDGE# 870314 BRIDGE-REPAIR/REHABILITATION .030 CONSTRUCTION 0 1,497 0 0 0 SR 836/I-395 FROM WEST OF I-95 TO MACARTHUR CSWY BRIDGE-REPLACE AND ADD 2516881 BRIDGE LANES 1.693 DESIGN BUILD 2,269 876 316 0 0 SR 836/I-95 INTERCHANGE RAMPS FROM NW 17 AVE TO I-95 4231261 (MDX) INTERCHANGE IMPROVEMENT 1.953 DESIGN BUILD 165 91 93 0 0 4231262 SR 9A/I-95 SOUTHBOUND RAMP TO WESTBOUND SR 836 INTERCHANGE IMPROVEMENT .227 DESIGN BUILD 41,233 0 0 0 0 4302913 ITS EQUIPMENT REPLACEMENT - CONSULTANTS /GRANTS ITS COMMUNICATION SYSTEM DESIGN BUILD 795 0 0 0 0 4302914 ITS EQUIPMENT REPLACEMENT - CONSULTANTS /GRANTS ITS COMMUNICATION SYSTEM CAPITAL 2,373 0 0 0 0 4302914 ITS EQUIPMENT REPLACEMENT - CONSULTANTS /GRANTS ITS COMMUNICATION SYSTEM DESIGN BUILD 156 315 0 0 0 4302915 ITS EQUIPMENT REPLACEMENT - CONSULTANTS /GRANTS ITS COMMUNICATION SYSTEM CAPITAL 0 9,233 0 0 0 4302915 ITS EQUIPMENT REPLACEMENT - CONSULTANTS /GRANTS ITS COMMUNICATION SYSTEM DESIGN BUILD 0 525 1,258 0 0 4302916 ITS EQUIPMENT REPLACEMENT - CONSULTANTS /GRANTS ITS COMMUNICATION SYSTEM CAPITAL 0 0 3,371 0 0 4302916 ITS EQUIPMENT REPLACEMENT - CONSULTANTS /GRANTS ITS COMMUNICATION SYSTEM DESIGN BUILD 0 0 197 472 0 4302917 ITS EQUIPMENT REPLACEMENT - CONSULTANTS /GRANTS ITS COMMUNICATION SYSTEM CAPITAL 0 0 0 1,305 0 4302917 ITS EQUIPMENT REPLACEMENT - CONSULTANTS /GRANTS ITS COMMUNICATION SYSTEM DESIGN BUILD 0 0 0 78 188 4302918 ITS EQUIPMENT REPLACEMENT - CONSULTANTS /GRANTS ITS COMMUNICATION SYSTEM CAPITAL 0 0 0 0 1,951 4302918 ITS EQUIPMENT REPLACEMENT - CONSULTANTS /GRANTS ITS COMMUNICATION SYSTEM DESIGN BUILD 0 0 0 0 90 PRELIMINARY 4234523 SR 9A/I-95 FROM N.W. 155TH STREET TO N.W. 170TH STREET LANDSCAPING 1.060 ENGINEERING 0 0 0 530 0 4290471 SR 93/I-75 FROM NW 178 STREET TO NW 202 STREET LANDSCAPING 1.463 CONSTRUCTION 0 1,470 0 0 0 4290472 SR 93/I-75 FROM NW 162 STREET TO NW 178 STREET LANDSCAPING .979 CONSTRUCTION 0 935 0 0 0 4154569 SR 9A/I-95 EXPRESS FHP ENHANCED ENFORCEMENT OTHER ITS OPERATIONS 625 625 625 625 0 SR 9A/I-95 EXPRESS OPERATIONS & MAINTENANCE INCIDENT 4346761 MGMT/RD RANGERS OTHER ITS OPERATIONS 3,792 3,759 3,724 3,272 0 I-95 EXPRESS LANES INCIDENT MANAGEMENT ROAD RANGER 4346762 SERVICE PATROLS OTHER ITS OPERATIONS 0 0 0 0 4,124 4362021 SR 9A/I-95 EXPRESS OPERATIONS & MAINTENANCE OTHER ITS OPERATIONS 823 823 823 0 0 I-95 EXPRESS LANES INFRASTRUCTURE MAINTENANCE & 4362022 REPAIRS OTHER ITS OPERATIONS 0 0 0 864 864 SR 93/I-75 EXPRESS LANES ITS MAINTENANCE OF TOLLING 4362041 EQUIPMENT OTHER ITS OPERATIONS 452 452 452 452 0 I-75 EXPRESS LANES INFRASTRUCTURE MAINTENANCE & 4362042 REPAIRS OTHER ITS OPERATIONS 0 0 0 475 475 SR 93/I-75 EXPRESS LANES INCIDENT MANAGMNT/ROAD 4362101 RANGER SERVICE PATROLS OTHER ITS OPERATIONS 589 589 589 238 0 I-75 EXPRESS LANES INCIDENT MANAGMENT ROAD RANGER 4362102 SEVICE PATROLS OTHER ITS OPERATIONS 0 0 0 0 619 4362131 SR 93/I-75 EXPRESS LANES FHP ENHANCED ENFORCEMENT OTHER ITS OPERATIONS 225 225 225 225 0 Page 1 of 31 ITEM DESCRIPTION TYPE WORK LENGTH PHASE 2020 2021 2022 2023 2024 4362132 I-75 EXPRESS LANES FHP ENHANCED ENFORCEMENT OTHER ITS OPERATIONS 0 0 0 0 232 SR 9A/I-95 FROM N. OF NW 151 STREET TO BROWARD COUNTY 4149641 LINE PD&E/EMO STUDY 5.420 P D & E 0 13,035 0 0 0 SR 9A/I-95 FROM N. OF NW 151 STREET TO BROWARD COUNTY PRELIMINARY 4149641 LINE PD&E/EMO STUDY 5.420 ENGINEERING 0 0 0 0 20,130 SR 9A/I-95 FROM N. OF NW 151 STREET TO BROWARD COUNTY 4149641 LINE PD&E/EMO STUDY 5.420 RAILROAD & UTILITIES 0 0 0 10 0 SR 9A/I-95 FROM US-1/SOUTH DIXIE HIGHWAY TO SOUTH OF 4149647 NW 62ND STREET PD&E/EMO STUDY 5.720 P D & E 0 0 6,700 0 0 SR 9A/I-95 FROM US-1/SOUTH DIXIE HIGHWAY TO SOUTH OF PRELIMINARY 4149647 NW 62ND STREET PD&E/EMO STUDY 5.720 ENGINEERING 0 0 0 0 10,340 SR 9A/I-95 FROM SOUTH OF NW 62ND STREET TO NORTH OF 4149648 NW 151 STREET PD&E/EMO STUDY 6.120 P D & E 0 0 3,700 0 0 SR 9A/I-95 FROM SOUTH OF NW 62ND STREET TO NORTH OF PRELIMINARY 4149648 NW 151 STREET PD&E/EMO STUDY 6.120 ENGINEERING 0 0 0 0 5,720 4418331 SR 826 VARIOUS RAMPS AT SR 924 AND I-75 RESURFACING .766 CONSTRUCTION 437 0 0 0 0 SR 93/I-75 FRONTAGE RDS FROM E OF HIALEAH GDNS BLVD TO 4418341 W 23RD AVE RESURFACING 1.624 CONSTRUCTION 3,366 0 0 0 0 SR 93/I-75 FRONTAGE RDS FROM E OF HIALEAH GDNS BLVD TO 4418341 W 23RD AVE RESURFACING 1.624 CONTRACT INCENTIVES 0 140 0 0 0 PRELIMINARY 4418361 SR 93/I-75 RAMPS AT NW 138 STREET RESURFACING 2.083 ENGINEERING 0 184 0 0 0 4418361 SR 93/I-75 RAMPS AT NW 138 STREET RESURFACING 2.083 CONSTRUCTION 0 0 0 1,766 0 RIGID PAVEMENT 4293002 SR 9A/I-95 FROM NW 8 STREET TO NW 29 STREET RECONSTRUCTION 4.013 DESIGN BUILD 448 0 0 0 0 RIGID PAVEMENT 4293003 SR 9A/I-95 FROM NW 29 STREET TO NW 131 STREET RECONSTRUCTION 10.311 DESIGN BUILD 35 0 0 0 0 RIGID PAVEMENT PRELIMINARY 4438941 SR9A/I-95 RAMPS AT SR90/SW 8 STREET AND SW 7 STREET REHABILITATION .556 ENGINEERING 0 0 320 0 0 RIGID PAVEMENT 4438941 SR9A/I-95 RAMPS AT SR90/SW 8 STREET AND SW 7 STREET REHABILITATION .556 CONSTRUCTION 0 0 0 0 1,523 SR 9A/I-95 (SHOULDERS ONLY) FROM SOUTH DIXIE HIGHWAY RIGID PAVEMENT PRELIMINARY 4439421 TO SW 8TH STREET REHABILITATION 1.547 ENGINEERING 0 0 285 0 0 SR 9A/I-95 (SHOULDERS ONLY) FROM SOUTH DIXIE HIGHWAY RIGID PAVEMENT 4439421 TO SW 8TH STREET REHABILITATION 1.547 CONSTRUCTION 0 0 0 0 566 SR 9A/I-95 EXPRESS LANES ITS OPERATIONS CONSULTANT 4154567 CONTRACT TECHNICAL ASSISTANCE 17.260 OPERATIONS 3,529 3,529 0 0 0 4361991 SR 93/I-75 EXPRESS LANES TOLLING AND OPERATIONS TECHNICAL ASSISTANCE OPERATIONS 689 689 0 0 0 SR 907/ALTON ROAD TO WESTBOUND SR 112/I-195/JULIA 4304443 TUTTLE CSWY TRAFFIC OPS IMPROVEMENT .075 CONSTRUCTION 0 2,274 0 0 0 SR 907/ALTON ROAD TO WESTBOUND SR 112/I-195/JULIA 4304443 TUTTLE CSWY TRAFFIC OPS IMPROVEMENT .075 CONTRACT INCENTIVES 0 0 0 80 0 4402281 I-195/SR 112 FROM NW 12 AVENUE TO SR 907/ALTON ROAD TRANSPORTATION PLANNING 8.582 P D & E 50 50 50 50 0 SR 9A/I-95 FROM N. OF BISCAYNE CANAL TO SR 860/MIAMI PRELIMINARY 4283585 GARDEN DR WIDEN/RESURFACE EXIST LANES 2.193 ENGINEERING 552 220 0 0 0 SR 9A/I-95 FROM N. OF BISCAYNE CANAL TO SR 860/MIAMI 4283585 GARDEN DR WIDEN/RESURFACE EXIST LANES 2.193 RAILROAD & UTILITIES 10 1,602 0 0 0 SR 9A/I-95 FROM N. OF BISCAYNE CANAL TO SR 860/MIAMI 4283585 GARDEN DR WIDEN/RESURFACE EXIST LANES 2.193 CONSTRUCTION 0 54,778 3,478 0 0 Miami-Dade County Highways: State Highways ITEM DESCRIPTION TYPE WORK LENGTH PHASE 2020 2021 2022 2023 2024 SR 25/OKEECHOBEE RD FROM BROWARD COUNTY LINE TO 4232512 WEST OF HEFT ADD LANES & RECONSTRUCT 4.591 RIGHT OF WAY 4,125 615 0 0 0 SR 25/OKEECHOBEE RD FROM BROWARD COUNTY LINE TO 4232512 WEST OF HEFT ADD LANES & RECONSTRUCT 4.591 CONSTRUCTION 0 0 49,415 0 0 Page 2 of 31 ITEM DESCRIPTION TYPE WORK LENGTH PHASE 2020 2021 2022 2023 2024 SR 25/OKEECHOBEE RD FROM BROWARD COUNTY LINE TO 4232512 WEST OF HEFT ADD LANES & RECONSTRUCT 4.591 CONTRACT INCENTIVES 0 0 0 0 2,000 SR 25/OKEECHOBEE RD FROM EAST OF NW 87 AVE TO NW 79 4232513 AVE (CONCRETE) ADD LANES & RECONSTRUCT .667 RIGHT OF WAY 2,193 8,996 12,850 4,259 0 SR 25/OKEECHOBEE RD FROM EAST OF NW 87 AVE TO NW 79 4232513 AVE (CONCRETE) ADD LANES & RECONSTRUCT .667 RAILROAD & UTILITIES 0 0 0 0 20 SR 25/OKEECHOBEE RD FROM EAST OF NW 87 AVE TO NW 79 4232513 AVE (CONCRETE) ADD LANES & RECONSTRUCT .667 CONSTRUCTION 0 0 0 0 44,717 SR 997/KROME AVENUE FROM SW 296 STREET TO S OF SW 232 4273691 STREET ADD LANES & RECONSTRUCT 3.674 RIGHT OF WAY 8,389 1,000 1,000 0 0 SR 997/KROME AVENUE FROM SW 296 STREET TO S OF SW 232 4273691 STREET ADD LANES & RECONSTRUCT 3.674 CONSTRUCTION 5,643 0 0 0 0 SR 997/KROME AVENUE FROM SW 296 STREET TO S OF SW 232 4273691 STREET ADD LANES & RECONSTRUCT 3.674 CONTRACT INCENTIVES 0 0 1,800 0 0 SR 997/KROME AVENUE FROM SW 232 STREET TO S OF SW 4273692 184TH ST/EUREKA DR.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    49 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us