Highway Structures - Capital Programme 2017-2018B

Highway Structures - Capital Programme 2017-2018B

Highway Structures - Capital Programme 2017-2018b Capital Structure No Scheme Name Structure Type Ward Area Committee Details of Scheme Allocation Various Feasibility / SAMP Various Various Various Feasibility Studies / Structures Asset Management Plan £50,000 Various Principal Inspections Various Various Various Close up structural survey of highway structures and provision of detailed condition report £70,000 4 Wellington Road Viaduct Bridge Brinnington & Central Stockport Central Waterproofing of bridge deck and revised highway layout under full road closure £200,000 25 CLC Railway Bridge Bridge Cheadle & Gatley Cheadle Masonry repairs to east parapet £60,000 97 Cheadle Lane Culvert Culvert Cheadle Hulme North Cheadle Construction of off line replacement culvert due to failure of existing culvert £207,000 376 Broadway Culvert Culvert Cheadle & Gatley Cheadle Reconstruction of collapsed downstream training wall £14,000 392 Councillor Lane Culvert Culvert Cheadle Hulme North Cheadle Confined space repairs £14,500 457 Travis Brow Footpath Retaining Wall Retaining Wall Heatons South Heatons and Reddish Masonry and joint repairs, parapet rail and devegetation £76,500 401 Manchester Road Culvert Culvert Cheadle Hulme North Cheadle Earthworks to east embankment, concrete and handrail repairs to headwalls and wing walls £16,000 907 Green Lane Retaining Wall No.2 Retaining Wall Bredbury Green & Romiley Werneth Reconstruction of drystone walling and devegetation £23,500 538 Hillcrest Road Culvert Culvert Bramhall North Bramhall and Cheadle Hulme Confined space repairs £11,500 BUDGET £743,000 Highway Structures - Capital Programme 2018-2019 Capital Structure No Scheme Name Structure Type Ward Area Committee Details of Scheme Allocation Various Feasibility / SAMP Various Various Various Feasibility Studies / Structures Asset Management Plan £50,000 Various Principal Inspections Various Various Various Close up structural survey of highway structures and provision of detailed condition report £80,000 4 Wellington Road Viaduct Bridge Brinnington & Central Stockport Central Merseyway £200,000 452 Whelmar Footbridge Footbridge Cheadle Hulme North Cheadle Reconstruction of collapsed downstream training wall £25,000 514 Hollywood Way Bridge Bridge Edgeley and Cheadle Heath Stockport Central Deck joint replacement £39,000 579 Manchester Road Culvert No.2 Culvert Cheadle Hulme North Cheadle Masonry repairs and repointing to structure arch intrados and parapet rail provision to west elevation headwall £290,000 657 Waterloo Road Culvert Culvert Brinnington and Central Stockport Central Downstream headwall reconstruction and internal repairs £20,000 BUDGET £704,000 Highway Structures - Capital Programme 2019-2020 Capital Structure No Scheme Name Structure Type Ward Area Committee Details of Scheme Allocation Various Feasibility / SAMP Various Various Various Feasibility Studies / Structures Asset Management Plan £50,000 Various Principal Inspections Various Various Various Close up structural survey of highway structures and provision of detailed condition report £100,000 12 Fogg Brook Bridge Bridge Offerton Stepping Hill Waterproofing to arch barrel and devegetation £65,000 53 Beight Bridge Bridge Bredbury and Woodley Werneth Reconstruction of collapsed downstream training wall £25,000 74 Otterspool Bridge Bridge Bredbury and Woodley Werneth Waterproofing, concrete repairs and masonry repairs £125,000 75 Romiley Canal Bridge Bridge Bredbury and Woodley Werneth Painting, joints and vermin control (pigeons) £35,000 83 Tiviot Way Bridge Bridge Brinnington and Central Stockport Central Protective coatings to deck elements, joint and parapet repairs £20,000 388 Bridge Lane Retaining Wall Retaining Wall Bramhall North Bramhall and Cheadle Hulme South Repointing and masonry repairs £20,000 462 Travis Brow Subway No.2 Subway Heatons South Heatons and Reddish Paint and protective coatings, and remove vegetation £15,000 463 Travis Brow Subway No.3 Subway Heatons South Heatons and Reddish Paint and protective coatings, and remove vegetation £15,000 514 Hollywood Way Bridge Bridge Edgeley and Cheadle Heath Stockport Central Deck joint replacement £39,000 525 Dingle Hollow Retaining Wall No.2 Retaining Wall Bredbury Green and Romiley Werneth Parapet replacement, masonry repairs and repointing throughout £20,000 526 Broadstone Road Retaining Wall Retaining Wall Heatons North Heatons and Reddish Parapet and handrail repairs and joint sealants £15,000 571 Welkin Mill Subways Subway Brinnington and Central Stockport Central Graffiti removal, vegetation removal and fence replacement £15,000 579 Manchester Road Culvert No.2 Culvert Cheadle Hulme North Cheadle Masonry repairs and repointing to structure arch intrados and parapet rail provision to west elevation headwall £100,000 617 Rock Row Retaining Wall Retaining Wall Brinnington and Central Stockport Central Graffiti removal, repointing £15,000 747 Otterspool View Retaining Wall Retaining Wall Marple North Marple Remove vegetation, repointing and masonry repairs plus joint sealants £15,000 119 Stanley Road Footbridge Footbridge Heald Green Cheadle Parapet and approach fence refurbishment £15,000 BUDGET £704,000.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us