
Project: Commercial Colony Project, Village- Badshahpur, Sector-66, Gurgaon (Haryana) EC Ref. No. – SEIAA/HR/2015/260 at dated 09.03.2015. CHAPTER-1 INTRODUCTION AND PROJECT DESCRIPTION 1.1 Introduction M/s NCR Business Park Pvt. Ltd. has proposed a the expansion of the commercial colony project at village-Badshahpur, Sector-66, Gurgaon , Haryana . The Project is going to start soon. The Project has been awarded “Gold Grading” in the meetings held on 30-04-2013. The Project has been recommended by State Expert Appraisal Committee (SEAC).This Project has obtained its Environmental Clearance from State Environment Impact Assessment Authority (SEIAA), Haryana with the EC No. SEIAA/HR/2013/942 on the date 15/10/2013. Now the Project Proponent has proposed the expansion of this project and obtained its Environmental Clearance from the State Environment Impact Assessment Authority (SEIAA), Haryana with the recommendation of State Expert Appraisal Committee (SEAC), having EC No. SEIAA/HR/2015/939 dated 09.03.2015.. 1.2 Purpose of the Report This report is supposed to submit after every six month as per the conditions stipulated in Environment Clearance Order. The Environmental assessment has been carried out to verify: i. That the proposed project has not any adverse effect on the project site as well as it’s surrounding. ii. That there is compliance with the conditions stipulated in the Environmental Clearance Letter. iii. That the Project proponent is implementing the environmental safeguards in true spirit. iv. The non conformity in the project with respect to the environmental implication of the project. v. That the project proponent is implementing the environmental pollution mitigative measures as suggested in approved Form-1 and Form – 1A, Environmental Management Plan and Building Plan. Vardan Enviro Net, D-142, Sushant Lok-lll, Golf Course Road, Sector 57, Gurgaon E-mail: [email protected], [email protected] 1 Project: Commercial Colony Project, Village- Badshahpur, Sector-66, Gurgaon (Haryana) EC Ref. No. – SEIAA/HR/2015/260 at dated 09.03.2015. CHAPTER-2 PART A – SPECIFIC CONDITIONS I. Construction Phase S. No. Conditions of Environmental Clearance Status of Compliance 1) . “Consent For Establishment” shall be obtained Consent to establishment has been obtained from from Haryana state Pollution Control Board under Haryana Pollution Control Board with the Regd No. Air and Water Act and a copy shall be submitted to HSPCB/Consent/: 2821214GUNOCTE432067. The the SEIAA, Haryana before start of any same is enclosed as Annexure-1 for the ready reference. construction work at site. 2) A First aid room as proposed in the project report We assure to provide the first aid room facility during will be provided in both during construction and full span of the project. operation phase of project. 3) Adequate drinking water and sanitary facilities Adequate drinking water & sanitary facilities shall be should be provided for construction workers at provided for construction workers at the site. The safe the site. Provision should be made for mobile disposal of waste water and solid waste will be done toilets. Open defecation by the laboures is strictly properly. Sanitation & hygiene will be of prime prohibited. The safe disposal of waste water and importance. solid wastes generated during the construction phase should be ensured. 4) All the top soil excavated during construction Top soil shall be stored for use in horticulture/landscape activities should be stored for use in development. horticulture/landscape development within project site. 5) The project proponent should ensure that the The constructional waste will be regularly stored in the building material used in the construction phase project site so as to avoid any effect on the people health. should be stored within the project area and disposal of construction waste should not create any adverse effect on the neighboring and should be disposed of after taking necessary precautions for general safety and health aspects of the people .only in the approved sites with the approval of competent authority. 6) Construction spoils, including bituminous Construction spoils shall be stored in a dedicated area materials and other hazardous materials must not duly bounded to avoid contamination to the environment be allowed to contamination watercourses and the in proximity. Storage area shall be covered by insulated dump site for such materials must be secured so lining to prevent contamination from hazardous that they should not leak into groundwater and materials like fuel of DG sets. Waste oil of the DG Set any hazardous waste generated during shall be disposed of through authorized vendors. construction phase should be disposed off as per applicable rules and norms with necessary approval of Haryana State Pollution Control Board. 7) The diesel generator sets to be used during Silent DG sets with ultra low sulphur diesel will be used construction phase should be of ultra low sulphur at the project site during construction stage, with diesel type and should conform to Environment maintained noise and emission within the permissible (Protection) Rules prescribed for air and noise limits. emission standard. 8) The diesel required for operating DG sets shall be The diesel will be stored in dug and pits covered with stored in underground tank tank if required metal sheet/asbestos sheets. If quantity of diesel stored Vardan Enviro Net, D-142, Sushant Lok-lll, Golf Course Road, Sector 57, Gurgaon E-mail: [email protected], [email protected] 2 Project: Commercial Colony Project, Village- Badshahpur, Sector-66, Gurgaon (Haryana) EC Ref. No. – SEIAA/HR/2015/260 at dated 09.03.2015. clearance from chief controller of explosive shall will be more than 2500 litres, approval of chief controller be taken. of explosives is will be obtained. 9) Ambient noise levels should conform to standards Ambient air & noise monitoring has been conducted at both during day and night. Incremental pollution project site and the results shows that the noise and air loads on the ambient air and noise quality should pollution levels are within the prescribed limits. Lab be closely monitored during construction phase. report are attached as Annexure-2 Adequate measures should be taken to reduce ambient air and noise level during construction phase, so as to confirm stipulated residential standards. 10) Fly ash should be used as building materials in the Fly ash based construction material will be used . construction as per the provision of fly ash notification of September 1999 and amendment as on 27th August 2003. 11) Storm water control and its re-use as per CGWB The recharge structures for storm water control as well and BIS standard for various applications should as rain water harvesting are proposed for recharging of be ensured. ground water. 12) Water demand during construction phase should Premix concrete and curing agent will be be used for be reduced by uses of premix concrete, curing water conservation. agent and other best practices. 13) In view of severe constrains in water supply STP Treated water provided by HUDA will be used for augmentation in the region and sustainability of construction purpose. This water is further treated by a water resources, the developers will submit the Tertiary Treatment Plant. NOC from CGWA specifying water extraction quantities and assurance from HUDA/ utility provider indicating source of water supply and quantity of water with details of intended use of water –potable and non potable. Assurance is required for both construction and operation stages separately. It shall be submitted to the SEIAA/R.O. MoEF, Chandigarh before start of construction. 14) Roof should meet prescribed requirements as per Thermal insulation of roofs shall be done. energy conservation building code by using appropriate thermal insulation material. 15) Opaque wall should meet prescribed The walls will be constructed as per ECBC norms by use requirements as per energy conservation building of thermal insulation material as a source of energy code which is proposed to be mandatory for all air conservation. conditioned spaces while it is desirable for non air conditioned spaces by use of appropriate thermal insulation to fulfill the requirement. 16) The approval of competent authority shall be The approval for structural safety will be obtained in due obtained for structural safety of the building due course of time. However we have taken the approval to earthquake, adequacy in firefighting equipment from Forest Department for the construction of the etc as per national building code including building along with the Aravalli clearance. NOC Forest protection measures for light etc. If any forest land and Aravalli Clearance are enclosed as Annexure- 3 & 4 is involved in the proposed site, clearance under Forest conservation act shall be taken from competent authority. 17) Overexploited ground water and impending We have proposed to use STP treated water for the severe shortage of water supply in the region construction of the project. We have already obtained requires the developers to redraw the water and the permission from HUDA for supply of water for energy conservation plan. Developer shall submit domestic use during the operational phase of the project details of good practices that have been included (Annexure-5) Vardan Enviro Net, D-142, Sushant Lok-lll, Golf Course Road, Sector 57, Gurgaon E-mail: [email protected], [email protected] 3 Project:
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages27 Page
-
File Size-