C. ON GOING WORKS u Surendranagar – Rajkot Doubling u Kotasan Road – Chanasma Gauge Conversion u Bhildi – Viramgam Gauge Conversion u Sadla – Jatpipli Doubling u Indranagar – Surbari - Kataria Doubling u Mahesana – Viramgam – Samakhiali Electrification u Viramgam – Ahmedabad Electrification u Manning of unmanned level crossings on Viramgam – Samakhiyali section u Provision of Road Under Bridges Progressing Railways u Provision of Solar Power System at LC Gates u Provision of Pathway for inter-platform transfer facility for Divyangs, Sr.citizens at Progressing Gujarat Dhrangadhra station u Track Renwal works on Ahmedabad – Viramgam section, Mahesana – Viramgam section, Viramgam – Samakhiali section u Extension of platform to accommodate 24 coach trains at Surendranagar Gate station. Manual coach indicator boards at Ranpur, Divyang Ramp at Joravarnagar Limbdi, Joravarnagar, Surendranagar Gate Ramp connecting platform no. 1 with platform no. 2 & 3 New Retiring Room at Surendranagar SURENDRANAGAR PARLIAMENTARY CONSTITUENCY DEVELOPMENTS BY RAILWAYS IN GUJARAT : 2014 – PRESENT SURENDRANAGAR PARLIAMENTARY CONSTITUENCY Developments by Railways INFRASTRUCTURE ENHANCEMENTS A. ASSEMBLY SEGMENTS Ongoing projects Viramgam, Dhandhuka, Dasada, Limbdi, Wadhwan, Chotila, Dhrangadhra u New line projects of 500 kms at an approx. cost of Rs.4195 Cr. u Gauge Conversion projects of 1533 kms at an approx. cost of Rs.10265 Cr. B. WORKS COMPLETED IN LAST FOUR YEARS u Doubling projects of 1017 kms at an approx. cost of Rs.7122 Cr. B1. Infrastructure Enhancement IMPROVING CONNECTIVITY FOR GUJARAT u New station Haripar between Dhrangadhra & Vasadva u Viramgam – Jhund Sadla Doubling u 82 new trains introduced u Sukhpur – Chuli Doubling u 10 trains extended u Jatpipli – Dhrangadhra Doubling u 3704 special trains run u Elimination of unmanned level crossing by construction of Road Under Bridge (RUB). u Mahamana, Antyodaya & Humsafar trains introduced u Construction of Road Over Bridges in lieu of Level Crossings u Viramgam Private Siding SAFETY A PRIORITY u Manning of unmanned Level Crossings u Jakhwada Private Freight Terminal u 43 Road Over Bridges constructed u Sukhpur Private Freight Terminal u 238 Road Under Bridges/Limited High Subways constructed u All Unmanned Level Crossings to be eliminated by March 2019 B2. Improvement in Passenger Amenities u Provision of Toilet Blocks at Surendranagar station BOOST TO PASSENGER AMENITIES u Provision of Toilets for Divyangs at Than station u Ramps provided at Vani Road, Sabli Road, Lilapur Road, Joravanagar, Lakhtar, Bala Road, u Upgradation of Waiting rooms/Retiring rooms Surendranagar & Than stations u Fast & free Wi-fi at 35 stations u Platform height raising & extension to accommodate 24 coach trains at Wadhwan City. u Coach Guidance System at 48 stations u Benches provided at Surendranagar & Than stations u Airport type trolleys at stations u New platforms & Cover sheds provided at Vani Road, Sabli Road, Lilapur Road, Lakhtar, u Escalators and Lifts Bala Road & Surendranagar stations u Air-conditioned Retiring room at Viramgam station u New FOB at Lilapur Road, Lakhtar, Bala Road & Surendranagar stations u Improvements to surfacing of PF No.3 at Viramgam station u Water Vending machines commissioned at Surendranagar station GUJARAT PARLIAMENTARY B3. Improvement in Train Services CONSTITUENCIES Surendranagar New Trains Introduced u 22973/74 Gandhidham – Puri Express u 22964/63 Bhavnagar – Bandra Terminus Express u 22936/35 Palitana – Bandra Terminus Express u 22939/40 Hapa – Bilaspur Express u 22937/38 Rajkot – Rewa Express u 22992/91 Veraval – Bandra Terminus Superfast Express u 22994/93 Mahuva – Bandra Terminus Superfast Express u 22990/89 Mahuva – Bandra Terminus Superfast Express New Trains Introduced u 12267/68 Mumbai Central – Ahemdabad AC Duronto Express extended upto Rajkot with additional halt at Surendranagar station AHMEDABAD EAST & WEST PARLIAMENTARY CONSTITUENCIES DEVELOPMENTS BY RAILWAYS IN GUJARAT : 2014 – PRESENT SURENDRANAGAR PARLIAMENTARY CONSTITUENCY Developments by Railways INFRASTRUCTURE ENHANCEMENTS A. ASSEMBLY SEGMENTS Ongoing projects Viramgam, Dhandhuka, Dasada, Limbdi, Wadhwan, Chotila, Dhrangadhra u New line projects of 500 kms at an approx. cost of Rs.4195 Cr. u Gauge Conversion projects of 1533 kms at an approx. cost of Rs.10265 Cr. B. WORKS COMPLETED IN LAST FOUR YEARS u Doubling projects of 1017 kms at an approx. cost of Rs.7122 Cr. B1. Infrastructure Enhancement IMPROVING CONNECTIVITY FOR GUJARAT u New station Haripar between Dhrangadhra & Vasadva u Viramgam – Jhund Sadla Doubling u 82 new trains introduced u Sukhpur – Chuli Doubling u 10 trains extended u Jatpipli – Dhrangadhra Doubling u 3704 special trains run u Elimination of unmanned level crossing by construction of Road Under Bridge (RUB). u Mahamana, Antyodaya & Humsafar trains introduced u Construction of Road Over Bridges in lieu of Level Crossings u Viramgam Private Siding SAFETY A PRIORITY u Manning of unmanned Level Crossings u Jakhwada Private Freight Terminal u 43 Road Over Bridges constructed u Sukhpur Private Freight Terminal u 238 Road Under Bridges/Limited High Subways constructed u All Unmanned Level Crossings to be eliminated by March 2019 B2. Improvement in Passenger Amenities u Provision of Toilet Blocks at Surendranagar station BOOST TO PASSENGER AMENITIES u Provision of Toilets for Divyangs at Than station u Ramps provided at Vani Road, Sabli Road, Lilapur Road, Joravanagar, Lakhtar, Bala Road, u Upgradation of Waiting rooms/Retiring rooms Surendranagar & Than stations u Fast & free Wi-fi at 35 stations u Platform height raising & extension to accommodate 24 coach trains at Wadhwan City. u Coach Guidance System at 48 stations u Benches provided at Surendranagar & Than stations u Airport type trolleys at stations u New platforms & Cover sheds provided at Vani Road, Sabli Road, Lilapur Road, Lakhtar, u Escalators and Lifts Bala Road & Surendranagar stations u Air-conditioned Retiring room at Viramgam station u New FOB at Lilapur Road, Lakhtar, Bala Road & Surendranagar stations u Improvements to surfacing of PF No.3 at Viramgam station u Water Vending machines commissioned at Surendranagar station GUJARAT PARLIAMENTARY B3. Improvement in Train Services CONSTITUENCIES Surendranagar New Trains Introduced u 22973/74 Gandhidham – Puri Express u 22964/63 Bhavnagar – Bandra Terminus Express u 22936/35 Palitana – Bandra Terminus Express u 22939/40 Hapa – Bilaspur Express u 22937/38 Rajkot – Rewa Express u 22992/91 Veraval – Bandra Terminus Superfast Express u 22994/93 Mahuva – Bandra Terminus Superfast Express u 22990/89 Mahuva – Bandra Terminus Superfast Express New Trains Introduced u 12267/68 Mumbai Central – Ahemdabad AC Duronto Express extended upto Rajkot with additional halt at Surendranagar station AHMEDABAD EAST & WEST PARLIAMENTARY CONSTITUENCIES C. ON GOING WORKS u Surendranagar – Rajkot Doubling u Kotasan Road – Chanasma Gauge Conversion u Bhildi – Viramgam Gauge Conversion u Sadla – Jatpipli Doubling u Indranagar – Surbari - Kataria Doubling u Mahesana – Viramgam – Samakhiali Electrification u Viramgam – Ahmedabad Electrification u Manning of unmanned level crossings on Viramgam – Samakhiyali section u Provision of Road Under Bridges Progressing Railways u Provision of Solar Power System at LC Gates u Provision of Pathway for inter-platform transfer facility for Divyangs, Sr.citizens at Progressing Gujarat Dhrangadhra station u Track Renwal works on Ahmedabad – Viramgam section, Mahesana – Viramgam section, Viramgam – Samakhiali section u Extension of platform to accommodate 24 coach trains at Surendranagar Gate station. Manual coach indicator boards at Ranpur, Divyang Ramp at Joravarnagar Limbdi, Joravarnagar, Surendranagar Gate Ramp connecting platform no. 1 with platform no. 2 & 3 New Retiring Room at Surendranagar SURENDRANAGAR PARLIAMENTARY CONSTITUENCY.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages4 Page
-
File Size-