Developmental Works - Some Glimpses INDIAN RAILWAYS Water Filtration System CSR by M/s.YES Bank Ltd, Mumbai. Increase in height of Platform no.1 at Maksi station Coach Guidance system at Dewas station (PF-1&2) NEW RAILWAYS Raising of Platform Height at Maksi Station A progressive journey since 2014 MADHYA PRADESH ON FAST TRACK DEVELOPMENT : 2014-PRESENT INPUTS BY RAILWAY IN DEWAS PARLIAMENTARY CONSTITUENCY INFRASTRUCTURE ENHANCEMENT: DEWAS PARLIAMENTARY CONSTITUENCY v New Line Projects A. ASSEMBLY SEGMENTS o New Line Projects of 521 Kms for ₹ 8646 Crore sanctioned since 2014. Ashta, Agar, Shajapur, Kalapipal, Sonkatch, Dewas, Sujalpur, Hatpipliya o New Line increased from 4 Km/Year in 2009-14 to 25 Km/Year in 2014- 2021 i. e. +525% B. WORKS COMPLETED IN LAST SEVEN YEARS B1. Infrastructure Enhancement · Binjana Crossing Station Completed in 2017. v Doubling/Tripling/4th Line Projects th · 20 Level Crossings Closed – Construction of Road Under Bridge/ Limited Height Subway. o Doubling/Tripling/4 Line Projects of 1754 Kms for ₹ 19257 Crore · 38.74 KW Roof Top Solar Plant at 04 Stations/ Locations. sanctioned since 2014. · 02 Road Over Bridge Commissioned at LC 27 and 08 Road Under Bridge has been o Doubling/Tripling/4th Line increased from 7 Km/Year in 2009-14 to 60 commissioned. Km/Year in 2014-2021 i. e. +757% · Approach road, Labour Room, Traders room, Lighting facility, Platform surface, Cover Over Shed over Goods Platform and Other Essential Services developed at Goods Shed v Electrification Projects at Shujalpur and Dewas. B2. Improvement in Passenger Amenities o Electrification Projects of 2539 Kms for ₹ 2222 Crore sanctioned since · Raising of Platform at Maksi (PF No. 1, 2 & 3), Dewas (PF No. 1) and Berchha (PF No. 1) 2014. Stations o Electrification increased from 64 Km/Year in 2009-14 to 201 Km/Year in · Extension of Platform at Berchha and Akodia Stations. 2014-2021 i. e. +214% · Provision of COP at Sujalpur PF No. 1 & 2. o 96.62 % - 4203 Route Kms in Madhya Pradesh has been Electrified. · Provision of Coach Guidance System at Dewas (PF No. 1, 2). · Water Filtration System at “D & E” Category Railway Stations under CSR by M/s. YES v Rail Fly Over Projects Bank Ltd, Mumbai. · 100 ft Monumental Flag at Dewas Station. o Rail Fly Over Projects of 74 Kms for ₹ 2174 Crore sanctioned since 2014. · Touch Screen System provided at Dewas Station. · Train Running Information System on LED Screens provided at Dewas Station. PASSENGER AMENITIES: · Multiline Display Boards commissioned at Dewas Station. v Cover Over Platforms · Wi Fi system provided at Dewas, Pirumrod, Berchha, Kalisindh, Bolai, Akodia, Jabri , v Foot Over Bridges Parbati Stations. v Washable Aprons · Old Platform Clocks have been replaced with Digital GPS clocks at Berchha Station. v Lifts & Escalators · Manual PA System installed at Berchha and Akodia Stations. v Extension and Raising of Platforms · Ladies and Gents Toilet at PF No. 1 at Dewas Station. · Toilet Block provided at Dewas, Shujalpur, Akodia, Berchha, Bolai, Jabri, Kalapipal, v Wi-Fi Facility Kalisindh, Maksi, Naranjipur, Parbati, Pirumrod and Ranayaljasmia. v Automatic Ticket Vending Machines · 02 Wheeler Parking at Shajapur Station v Coach Guidance Systems · Provision of LED Lights at Shajapur Station Platforms v Water Vending Machines v LED Lights at Stations C. WORKS IN PROGRESS · Doubling of Indore – Dewas – Ujjain Section. SAFETY – OUR PRIME CONCERN: · Shujalpur Station: Raising of PF No. 2 & 3 and Extension of Cover Over Shed on PF No 1, st 2 & 3. v Use of Drone by WCR in Madhya Pradesh for the 1 time in India for Disaster Management, Crowd Management and Project Monitoring etc; v Use of GPS Trackers for Patrolling and Monitoring by WCR in Madhya Pradesh for the 1st time in India..
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-