Hazelwood’s closure in review: What happened 12 months on? Report for Environment Victoria March 2018 Disclaimer: The data, analysis and assessments included in this report are based on the best information available at the date of publication and the information is believed to be accurate at the time of writing. Green Energy Markets does not in any way guarantee the accuracy of any information or data contained in this report and accepts no responsibility for any loss, injury or inconvenience sustained by any users of this report in relation to any information or data contained in this report. Green Energy Markets Pty Ltd ABN 92 127 062 864 2 Domville Avenue Hawthorn VIC 3122 Australia T +61 3 9805 0777 F +61 3 9815 1066 [email protected] greenmarkets.com.au Part of the Green Energy Group Green Energy Markets Green Energy Markets Pty Ltd has been engaged by Environment Victoria to undertake an assessment of how Victoria’s electricity market has filled the gap following the closure of the Hazelwood Power Station in March 2017. Summary Hazelwood Power Station representing 1600 MW of brown coal capacity closed at the end of March 2017, various politicians and commentators raised concerns about the ability of Victoria to keep the lights on. The 2017 peak summer period of 2017/18 passed on 28 February this year without any supply-side power outages. This report looks at what has transpired over the period since the closure of Hazelwood and how its contribution to meeting Victoria’s electricity demand since it closed was covered. The report also considers the contribution that new large-scale renewables under construction and demand side activities will make over the coming four years. Key findings are: • Victoria’s energy system was reliable through a hot summer without Hazelwood with no supply- side interruptions to the grid; • Hazelwood’s closure led to a significant drop in greenhouse gas emissions in Victoria – approximately 12 million tonnes over the year. When accounting for emissions associated with imported energy, the avoided emissions were just over four million tonnes; • The pipeline of committed renewable energy projects, behind the meter resources (such as efficiency and rooftop solar) and new battery storage projects continue to drive change in Victoria’s energy market toward a cleaner grid. 1. What had been Hazelwood’s contribution? • Whilst Hazelwood had a notional capacity of 1600 MW (8 x 200 MW units) the most that it actually ever generated over the 2016/17 summer was 1450 MW, and often it was considerably lower than this (Figure 1); • On a “sent out” basis (after deducting auxiliaries, ie. electricity used in the power station and mine) the highest contribution over the 2016/17 summer was 1300 MW, many times only 1000 MW was available, and sometimes even lower than this; • In Energy generation terms (on a sent out basis) Hazelwood has averaged around 10 TWh per annum over the last 6 years; and • In 2016, its last full year of operation it generated 9.2 TWh. Page 1 Green Energy Markets Figure 1. Hazelwood generation (Dec 2016 to 31 March 2017) Source: NEM Review 2. Meeting Victoria’s power needs • Victoria’s electricity consumption on an annual basis has been falling since 2011. Demand has reduced from 50 TWh in 2011 to less than 44 TWh in 2017; • The drop in consumption, over a period of strong population and economic growth, can be explained by: closure of the Point Henry smelter; part closure of the Portland smelter in late 2016 and fully restored by Aug 2017. Importantly though, behind the meter rooftop solar and energy efficiency activities installed under the Victorian Energy Savings (VEET) scheme have also made a significant contribution. As an example, the VEET scheme has supported the large- scale upgrade of lighting facilities (to high efficiency LEDs) in warehouses and commercial and industrial facilities; • Peak demand in Victoria has also fallen since 2011 (Figure 2), and similar factors that contributed to the reduction in energy use will also have contributed to the reduction in peak demand; • Peak demand over the 2017/18 period reached 9.1 GW, which was higher than the 8.5 GW in 2016/17, but lower than the 9.3 GW in 2015/16. Generation required to meet peak demand is not required for very long. In the 2017/18 summer, demand reached above 8.0 GW for a total of only 40 hours, this is less than 0.5% of the time; • With the loss of Hazelwood’s capacity, The Australian Energy Market Operator (AEMO) triggered Reserve Trade provisions to secure additional reserves (RERT). This included demand response as well as 105 backup diesel generators (110 MW) at the old Morwell power station site; and • RERT was called upon by AEMO to assist with the peak on 19 January 2018. AEMO predominantly drew on short term demand reduction from the Portland Smelter. The diesel generators at Morwell were not required and are expected to be removed in April 2018. Page 2 Green Energy Markets Figure 2. Victoria’s half hourly demand since January 2011 Source: NEM Review 3. So how did Victoria cover the loss of Hazelwood’s contribution? (11 months to end of Summer 2018) • Hazelwood generated 8509 GWh in the 11 months to February 2017 • Comparing the 11 months to February 2018 to the 11 months to February 2017 when Hazelwood was operating, Hazelwood’s output can be seen to have been predominantly covered as follows: o Additional gas generation provided 1,200 GWh (after allowing for reduction in hydro output of 1,100 GWh) o Increased output from other brown coal fired generation in Victoria of 900 GWh o Reduction in net exports to other states of 5,000 GWh o Net import of electricity from other states of 1,500 GWh Table 1. Victorian Generation by Fuel Type Other Brown Total GWh Sent Out Wind Gas Hydro Hazelwood Coal Generation Total Demand 11 Months to Feb 2017 3,290 856 3,422 8,509 29,435 45,512 40,567 11 Months to Feb 2018 3,218 3,122 2,315 0 30,328 38,983 40,503 Variance -72 2,266 -1,107 -8,509 893 -6,529 -64 Note: the output of the Murray Power station which is part of Snowy is included in the above (AEMO notionally included it in Victoria). Murray’s output was 2,684 GWh for 11 Months to Feb 2017 and 1,753 GWh for 11 months to Feb 2018 (931 GWh or 35% less). Page 3 Green Energy Markets 4. Emissions Reductions • Victoria’s greenhouse gas emissions from electricity generation was 11 million tonnes lower over the 11 months to February 2018 as a result of Hazelwood closing (Table 3). On an annual basis this amounts to a reduction of 12 million tonnes. This is equivalent to 9.4% of 2005 emissions and is well on the way to achieving the Government’s target of 15-20% below 2005 emissions by 2020. • If we adjust emissions for the reduction in the net exports over the period then Victoria’s emissions as a direct result of its electricity consumption reduces by 3.8 million tonnes compared to the 11 months to February 2017. On an annual basis this amounts to a reduction of 4.1 million tonnes. This is equivalent to removing 1.3 million cars from our roads. Table 3. Greenhouse Emissions from Electricity Generation Other Brown Export/ Net Emissions '000 Tpa Gas Hazelwood Coal Total Imports Emissions 11 Months to Feb 2017 485 13,241 39,439 53,165 -5,776 47,388 11 Months to Feb 2018 1,755 0 40,501 42,255 1,368 43,623 Variance 1,270 -13,241 1,062 -10,909 7,144 -3,765 % change 262.1% 2.7% -20.5% -7.9% Note: In calculating emissions for Net Exports and Imports we have assumed that net exports (for 11 months to Feb 2017) have the average emissions intensity of total Victorian generation and that net imports (for 11 months to Feb 2018) have emission intensity of 0.9 tonnes per MWh which is equivalent to NSW black coal emissions which is assumed to be the marginal generation source. 5. Contribution of renewables and demand side activities • Only two small wind Farms (Kiata, 31 MW and Yaloak South, 29 MW) came on line since Hazelwood closed. Both of these wind farms first started generating electricity towards the end of 2017. We did have a full year contribution from Ararat wind farm which offset the lower output from the other operating wind farms (due to less favourable wind conditions compared to the 11 months to Feb 2017). • There were 1594 MW of large-scale renewables projects under construction in Victoria at 15 March 2018 (Table 2). These projects have all reached financial close and are proceeding and are expected to produce 4,712 GWh per annum when fully operational over the next 18 months or so. Page 4 Green Energy Markets Table 2. Large-scale renewable projects under construction (15 March 2018) Capacity Project Fuel Source (MW) Bannerton Solar Farm Solar 88.0 Deakin Waurn Ponds solar array Solar 7.3 Gannawarra Solar Farm Solar 52.8 Karadoc Solar Farm Solar 112.0 Swan Hill Solar Farm Solar 19.0 Wemen Solar Farm Solar 88.0 Yatpool Solar Park Solar 81.0 448.1 Bulgana Wind Farm Wind 196.0 Maroona Wind Farm - Vic Wind 6.9 Mount Gellibrand Wind Farm Wind 132.0 Murra Warra Wind Farm Wind 226.0 Salt Creek Wind Farm Wind 54.0 Stockyard Hill Wind Farm Wind 530.0 Wannon Water - Portland Wind 0.8 1,145.7 1,593.8 • 203 MW of rooftop solar PV was installed in Victoria in 2017, on an annual basis this will result in 245 GWh of generation which will be seen by the system as a reduction in demand.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us