Nagaland Priority List of 2009-10

Nagaland Priority List of 2009-10

Nagaland Priority List of 2009-10 (Rs. in crore) Sl. No. Name of the Projects Estimated cost 1 Construction of end equipments and 220 KV S/C, T/L 62.88 from PGCIL Sub-station Dimapur to Chiephobozou 2 Providing water supply to New District Hq. complex, 10.63 Peren 3 Construction of Rest House at Administrative 129.78 Centres 4 Setting up of Medical College at Dimapur 340.22 5 World Language Institute or South East Asian 8.19 6 Setting up of Pilot & Maintenance Academy in 6.53 Dimapur 7 Railway connectivity from Dimapur to Tizit via Tuli 0.00 Paper Mill 8 Flyover at Kuda (half Nagarjan) Kevija-u / Thakekhu 20.00 railway line tri-junction, Dimapur 9 Improvement of road from Zhekiye to Satoi-70 km 40.44 (from Ghukhuyi upto Satoi Administrative Hq. (MDR) – 42 km 10 Construction of road Kohima to Leikie road junction 21.26 to Tepuiki to Barak-3 km (MDR) 11 Construction of Longtho-Governor’s Camp via 59.35 Baghty Road (New Akuk to Governor’s Camp)-85 km (ODR) 12 Construction of Road from Tuophema to Pughoboto 10.59 road via Kasha (Kahsa to Pughoboto)-21 km (MDR) 13 Construction of road from Surohoto to Asukhume 17 16.37 km (MDR) 14 Construction of NH-150 to Chokriba road via Thipuzu 10.33 (Thipuzu to Chokriba-35 km (ODR) 15 Upgradation of Dimapur-Nuiland road from ORD to 30.39 MDR-28 km 16 Upgradation of Pungro to Mimi Road 75 kms (MDR) 72.23 17 Construction of road from Porba Mithun Research 43.34 Centre near Govt. High School Junction to Chizami via Enhulumi village -45 kms (ODR) 18 Upgradation of Co-Co-Doyang Road (NH-61 to 33.70 Kitsakita via Atoizu, SDO Hq-37 (MDR) 19 Construction of road from Diezephe to Razaphe via 11.70 Vidima-15 kms 20 Construction of road from Lukahmi BRO junction to 103.56 Seyochung Tizu Bridge on Satoi road, Khuza, Phughe, Chozouba State Highway junction – 120 km (ODR) 21 Construction of road from Tuli to Molungyimsen, 44.01 Khar, Changki, Mokokchung Mariani road-51 22 Construction of road from Zero Point Sanis to 23.30 Woroku village-27 km (ODR) Sl. No. Name of the Projects Estimated cost 23 Construction of road from Pughoboto to Satakha, 30.20 Zunheboto road – 37 km (ODR) 24 Improvement of road from Border Road to 5.40 Changlanshu 19 km 25 Construction of road from Lerie to Kidima via 30.21 Phesama, Kigwe, Mima-35 km (ODR) 26 Construction of road from Chiecham-Teichuma- 8.00 Tsemekhuma Road 27 Construction of road from Ganeshnagar/Kekiho 15.00 village to Jalukie (via) Horangse 28 Integrated Development of identified villages in 24.00 Nagaland 29 Construction of Tizu Bridge and Chizuti Bridge at 20.06 Nimi – Laluri Link Road to Mineral Deposit Areas TOTAL 1231.67 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us