Route 364 Page Phase III Design-Build Project

Route 364 Page Phase III Design-Build Project

Route 364 Page Phase III Design-Build Project Collaboratively Making The Connection Chronic Traffic Congestion Missouri River Crossings: CURRENT TRAFFIC: MO 370 + I-70 + MO 364 (current) + I-64 = 360,000 VPD 2030 PROJECTIONS – Increase to over 500,000 VPD NEED RELIEF NOW!! Chronic Traffic Congestion Opening Day! We anticipate 15% - 20% of Traffic will divert from I-64 to Improve mobility from: LOS E LOS D Project Location Highway 94 I-270 Phase 1 Highway 94 I-270 Phase 1 Phase 2 Phase 2 Phase 3 Page Phase 3 Corridor Lake Saint Louis Dardenne Prairie St. Peters O’Fallo n Cottleville I-64 8.9 miles Route 94 Cost • $118.2 million – Property acquisition – Utility relocation – Design and construction • $71.8 million Design-Build contract • Funding is a cost-share project with St. Charles • The County and its major municipalities are contributing $57 million Project Goals • Deliver the project within the programed budget of $118.2M • Maximize improvements in the corridor to connect Route 364 Phase 2 from Route 94/Mid Rivers Mall Drive to I-64 • Provide a design that allows compatibility for future expansion • Minimize and mitigate construction impacts and maximize work zone safety to customers through construction staging and communication efforts • Provide a quality product that produces a long lasting transportation facility • Complete the project no later than December 1, 2014 Design-Build Project Sixth Design-Build Project in the State Fourth Design-Build Project in St. Louis Procurement Schedule • Request for Qualifications released in August 2012 • Short Listed 4 Teams in September of 2012 • Issued RFP on October 1, 2012 • One-on-one weekly discussions with teams for 10 weeks • Final Proposals due January 11, 2013 Proposal Evaluation Items Area Available Points Project Definition 55 Compatibility 20 Maintenance of Traffic 10 Completion Schedule 5 DBE & Workforce Diversity 5 Safety 5 TOTAL 100 MoDOT Design Build • Loop Ramp Design - Indiana • Bridge Scupper Design - Illinois • Approach Slab Design - Illinois • Simple Curve vs Spiral Curve – Kansas, Iowa, Illinois • MSE Resistivity - Illinois • Tapered Exit Ramp vs Parallel Ramp - AASHTO General Project Overview • Grade separated cross streets • 9 IN. Concrete Pavement on 12 IN. Rock Base • 10’ outside shoulder • 6-Lane grading template throughout mainline corridor • Standard MoDOT Integral End Bent Bridges with MSE walls Route 364 at I-64 Full Cloverleaf Interchange New Directional Ramp from WB 364 to WB I-64 New Loop Ramp EB Route 364 to WB I-64 New Directional Ramp WB I-64 to EB 364 • Full Clover leaf interchange. Free-Flow for all movements.New Loop Ramp EB • Eliminates 2 Ispan-64 to-wire EB Routesignals 364 on 364 Route 364 at Henke Road Half Diamond Interchange Access to Henke improves local traffic mobility Between Bryan Road & Hwy K Cross streets closed July 2013 NOVEMBER 1, 2013 • Route N extended to Bryan Road • Stump Road straightened out North and South Outer Roads remain two-way traffic Route 364 at Route K Single Point Urban Interchange • Single Point combines all movements into one signal to minimizes additional signals on Route K • Restripe Route K from 4 lanes to 6 lanes to increase capacity Route 364 at Hwy 94/Mid Rivers Mall Directional Interchange Accommodates all movements between 364/94/Mid Rivers Free Flow connection from Phase 2 to Phase 3 Signalized Intersection Compatibility - Page Constructors 10’---12’ 12’ --- 10’- -10’---12’ 12’---10’ rd th Future 4th Lane Future 3 Lanes Future 4 Lane Outside Inside Outside Schedule • Project Award on 2/6/13 • Signed Contract 3/30/13 • Co-Located in Lake St. Louis 4/1/13 • Roadway & Structures Task Force Meetings begin 4/2/13 • Issued NTP-1 (Design) on 4/17/13 • First Design Package issued on 4/22/13 • AJR Approved on 8/12/13 Segment 1 Segment 2 Milestones Segment 1: Gutermuth Road Bridge Open by 8/30/13 Segment 2: Bryan Road Open by 11/1/13 Segment 3 & 4: I-64 to Route K Open by 10/3/14 Segment 5: Route K to Midrivers Mall Drive Open by 10/31/14 Construction • 17 Bridges • 2.6 Million CY of Earthwork • 350,000 SY of Pavement • 150,000 SY of Shoulders • Utilities Details • We are in the back yard of over 25 major subdivisions and resident complexes • We are building adjacent to over 30 businesses including strip malls, schools, fire houses, retirement centers. • We’re working day’s, nights, weekends, and holidays. • Approximately 20-30 calls/emails per month Major Challenge – Sound! Major Challenge – Sound! Challenges – Erosion Control • Maximum open erodible acreage 400 acres • Currently ~ 100 acres. Track Daily. Seeded yesterday • Major Rain Events in April, June, and August • April Rain Event > 5” of rain in less than 48 Hours • Site Changes Daily! Challenges - Schedule Challenges - Schedule • Average Construction Day: 75 Workers, 35 Trucks • Peak Construction: 200 Workers, 70 Trucks • Peak Design: 36 FTE • Design Hours: > 40,000 Hours • Construction Hours ~ 300,000 Hours Update • All 17 Bridges are Completed • Grading is Approximately 95% Complete • All Utilities are now out of the way • Mainline Pavement! – Half the Project is completed: I-64 to Route K – Route K to Mid River Mall still to go Concrete Paving! MoDOT Design Build - Pavements • Design Build Teams Propose – Base Type – Base Thickness – Pavement Type – Pavement Thickness • No Pay Factors (No bonuses only deducts) • All other aspects same as typical projects Route 364 Paving Fleet • 1 Mainline Paver • 3 Ramp Pavers • 4 Placers • 2 Trimmers • 2 Drum Batch Plant Rock Fill Base Process Concrete Paving VS Paving Schedule • Started Paving Mainline and Ramps 36 Days ago • Over 250,000 SQYDs of Mainline • Almost 100,000 SQYDs of Ramp • Over 45 Miles of new Concrete Pavement + Shoulders!! Paving Results • Average Days Production: 3,200 Cubic Yards • Average 28 Day Strength: 6,290 psi • Average IRI: 60-70 inch/mile • Best Section IRI: 55 inch/mile Stringless Paving Lessons Learned • Open jobsite • Initial Intimidation of unknown • Do NOT block line of sight! • Safety aspect particularly at night Summary • Project is on schedule to finish connection from Mid Rivers Mall to I-64 by Halloween. • Page Constructors (Millstone-Weber and Kolb Grading) is Designing and Building the project. • The final 3 months will be a sprint to the finish line. Questions??.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    47 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us