Building NZ Transport and Infrastructure Discussion Document

Building NZ Transport and Infrastructure Discussion Document

Building NZ Transport and Infrastructure Discussion Document HAVE YOUR SAY 2019 DISCUSS national.org.nz nznats nznationalparty This document is printed on an environmentally responsible paper. Contents Introduction from the Leader 2 Introduction from National’s Infrastructure Spokesperson 4 The Infrastructure Pipeline 5 Innovative Infrastructure Funding and Financing 7 Reducing the Costs of Infrastructure 9 Infrastructure Delivery 11 Connecting Communities 14 The Construction & Infrastructure Workforce 17 Introduction from National’s Transport Spokesperson 20 Our Transport Objectives 21 Transport Funding 23 Roads 26 Public Transport and Congestion 30 Rail 34 Cycling 36 Transport and Emissions 38 Aviation 40 Ports 43 National’s Transport and Infrastructure Team 45 Questions and Feedback 46 2 Transport and Infrastructure Introduction from National Party Leader Simon Bridges Transport and Infrastructure is deeply personal This document proposes a number of ways to for New Zealanders. We use it to get home at get New Zealand moving again, and how we will night to see our families, our businesses rely tackle some of the real challenges this country on it to grow and succeed, and it allows us to faces. access world-class public services. National gets on and builds things - whether it is first- We need to ensure New Zealand’s infrastructure rate social and economic infrastructure or is fit for purpose for the 21st century. That means Roads of National Significance, New Zealanders not just having the economic infrastructure that have come to know National as the party that will grow the economy and create jobs, but the delivers on its policies. I saw first-hand what social infrastructure that will see our kids taught new roads and infrastructure meant to New in world-class facilities and give us access to Zealanders when I was Minister of Transport and healthcare to stop us getting sick. Economic Development. Transport touches almost every aspect of our This Government has cancelled or stalled all lives on a daily basis. New Zealanders need of the former National Government’s plans to transport infrastructure that is reliable, efficient, get New Zealand moving and growing. This effective, and safe. Whether it is Let’s Get ultimately means New Zealanders are worse Wellington Moving, delays with major transport off. It will also have repercussions that will roll projects like the Tauranga Northern Link or the on for years and years to come. Cancelling and City Rail Link, the Government has proven time delaying roads that reduce congestion, improve and time again it cannot deliver the transport safety and get New Zealand moving will not infrastructure New Zealanders deserve. We will only slow down our economy but mean fewer make sure we do. opportunities for New Zealanders. HAVE YOUR SAY 2019 DISCUSS Transport and Infrastructure 3 “We need to ensure New Zealand’s This document raises a number of questions infrastructure is fit for purpose for and proposals we want to get your feedback on. We want to hit the ground running and have the 21st century. That means not just an infrastructure plan that gets New Zealand having the economic infrastructure growing and moving again. that will grow the economy and create jobs, but the social infrastructure that will see our kids taught in world-class facilities and give us access to healthcare to stop us getting sick.” Simon Bridges National Party Leader Leader of the Opposition HAVE YOUR SAY 2019 DISCUSS 4 Transport and Infrastructure ”High levels of congestion and ageing infrastructure are holding back this country’s productivity and increasing the cost of doing business, making our products less Introduction from competitive.” Paul Goldsmith Hon Paul Goldsmith National’s Infrastructure Spokesperson National’s Infrastructure Spokesperson Few would argue that New Zealand doesn’t 3. Innovating with funding and financing need to seriously increase its investment in mechanisms so that we are relying less on infrastructure over the coming decades. Crown and council balance sheets. High levels of congestion and ageing As a country, we’ve been too conservative in the infrastructure are holding back this country’s past. National is developing a long-term vision productivity and increasing the cost of doing for infrastructure with a clear pipeline of work in business, making our products less competitive. place. Our quality of life also suffers when we have to We have worked constructively with the sit in traffic and live with creaky wastewater and Government on its Infrastructure Commission. stormwater systems that dirty our rivers and However, we note that it will not work if beaches. highly ideological positions are taken by the Government of the day. The previous National Government significantly increased investment in transformative National will undertake regulatory reform to infrastructure projects, including the Waterview reduce the cost of building. We will be open to Tunnel, the City Rail Link, the electrification of innovative funding and financing mechanisms Auckland’s commuter rail network, the rollout that will deliver high-quality, long-lasting of Ultra-Fast Broadband, the Rural Broadband infrastructure faster. Initiative and the Roads of National Significance. More broadly, National will restore business However, National recognises we need to confidence, revive our economy and lift our build on that and do more. We are focused on aspirations so that we can truly be the best little delivering the infrastructure New Zealand country in the world. needs by: 1. Developing a long-term pipeline of infrastructure projects that doesn’t frequently chop and change 2. Focusing on reducing the cost structure of infrastructure provision so that we can get Hon Paul Goldsmith more for our money National’s Spokesperson for Infrastructure HAVE YOUR SAY 2019 DISCUSS Transport and Infrastructure 5 The Infrastructure Pipeline “A pipeline helps set priorities; it demonstrates a programme of work to attract global players, which increases competition and skill levels.” Hon Paul Goldsmith Spokesperson for Infrastructure New Zealand has a rapidly growing population Sadly, the incoming Government undermined and many ageing pipes and roads, so it is that process by discarding the East-West Link critical we have a clearly agreed, ambitious and postponing several other critical roads, pipeline of major projects set down for such as Mill Road, in favour of light rail. Because the coming decades to keep building and of this, the pipeline for major roading projects is rebuilding our infrastructure. virtually non-existent. A pipeline helps set priorities; it demonstrates National was also getting on with building roads a programme of work to attract global players, that would better connect our regions to our which increases competition and skill levels. major cities and to each other. These regional It gives all players the confidence to invest in roads, which were largely ready to go, have all machinery and skills, and it builds and maintains been cancelled or delayed. momentum across the New Zealand economy. We support drawing up a national pipeline of The previous National Government made major infrastructure projects to reduce the cost good progress developing a transport pipeline of chopping and changing across electoral in Auckland through the Auckland Transport cycles, but we wonder whether this should go Alignment Project. The Government and further. Auckland Council agreed on a list of priority projects and began delivering them. HAVE YOUR SAY 2019 DISCUSS 6 Transport and Infrastructure National proposes further strengthening The combination of ideology and incompetence the role of the Infrastructure Commission by means New Zealand is steering down the barrel requiring it to undertake post-completion of an infrastructure hole. All the while our roads reviews of good and bad procurement projects will become more congested and it will take us so that knowledge can be shared across the longer to get home to our families at night. government sector. New Zealanders will rue three years under We know that when it comes to infrastructure, Labour where virtually nothing has happened. a government’s actions speak louder than its words. What this Government has done is sever New Zealand’s infrastructure pipeline by cancelling or postponing a dozen major projects that were ready to go under National, We want your thoughts on the and replacing them with projects that won’t be following: ready to go for some time. • Has the New Zealand National is committed to reducing the Infrastructure Commission got the infrastructure backlog and ensuring priority powers that it needs? projects are funded appropriately. It is important for the confidence of the construction sector that there is a clearly outlined programme of major projects in place, like the Roads of National Significance, and governments refrain from cancelling or delaying them. Had there not been a change of government • National will develop a clear at the last election, National would right now pipeline of major infrastructure be progressing work on roads from Wellsford projects. to Whangārei, Cambridge to Tirau, Piarere to Kaimai Range, Tauranga to Katikati, Napier • National supports the to Hastings, Levin to Sanson, Christchurch Infrastructure Commission as to Ashburton, Wellsford to Warkworth, Ōtaki a way to achieve long-term to Levin, the East West Link, the Melling certainty but we believe it needs Interchange, Mill Road and Penlink. to be properly resourced if it is to have any meaningful impact. These major road investments would help unlock regional New Zealand and reduce congestion in • We propose to further strengthen our cities. the role of the Infrastructure Commission by requiring it to The Government’s failure to deliver on undertake post-completion infrastructure is driven by ideology – a point reviews of good and bad blank refusal to build new roads. Transport procurement projects to enable Minister Phil Twyford has said publically that he knowledge to be shared across believes this country has “overinvested” in roads the government sector.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    56 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us