2014 AGM Presentation

2014 AGM Presentation

CHAIRMAN MR IAN BURSTON BOARD OF DIRECTORS L-R: Jeff Dowling (non-executive director), Michael Arnett (non-executive director), Ian Burston (Chairman), John Cooper (non-executive director), Julian Pemberton (CEO). CEO UPDATE MR JULIAN PEMBERTON FINANCIAL OVERVIEW • Revenue of $1.1 billion • EBITDA – $123.0M, 10.8% of Revenue • EBIT of $65.5M; NPAT of $44.2M • Strong cash position of $155.5M • Net Debt – $34.0M a reduction of $54.6M • Order book maintained at $1.0 billion • Final fully franked dividend • 5 cents per share (9 cents for the full year) • Payout ratio 57% • Net Debt / Equity at 9.1% NRW’s operations at the North Star Minesite. OPERATIONAL OVERVIEW • Awarded largest ever civil contract by Samsung C&T at the Roy Hill Project ($620 million) – 50% complete as at June 14. • Awarded $200 million concrete and civil package for the Roy Hill Minesite. • Awarded Ore Car Repair Shop civil earthworks contract for BHP Billiton. • Action Drill & Blast awarded three year contract for drill and blast operations at the Middlemount Coal Mine in Queensland. • Awarded early works contract at Fortescue's Iron Bridge Project in joint venture with Njamal ICRG JV Pty Ltd. • Continued Improvement of Group Safety performance: (TRIFR at 2.36 end June 14). NRW’s Roy Hill Concrete Package Project. FIVE YEAR SNAPSHOT Revenue Earnings & Dividend Payout Ratio $m's 40.0 60% 1,400 1,200 50% 30.0 1,000 40% 800 20.0 30% 600 400 20% 10.0 200 10% 0 - 0% FY10 FY11 FY12 FY13 FY14 FY10 FY11 FY12 FY13 FY14 1st Half 2nd Half EPS DPS DPR Net Debt / Equity Shareholder equity 40% $m's 35% 400 30% 350 300 25% 250 20% 200 15% 150 10% 100 5% 50 0% 0 FY10 FY11 FY12 FY13 FY14 FY10 FY11 FY12 FY13 FY14 HEALTH, SAFETY & ENVIRONMENT 14 • Continued improvement and focus on safety performance across the business, sustaining a 12 positive trend. 10 • The “A Safe Day. Every Day” Program has been 8 refreshed with increased focus on the quality of 6 the leading indicators. Frequency rates 4 • TRIFR currently at an industry leading 2.36 (June 14), a significant improvement from 5.47 2 at the same time last year. 0 FY11 FY12 FY13 FY14 • LTIFR currently at 0.17 (June 14), an LTIFR TRIFR improvement from 0.55 at June 13. • Established The 5 Golden Rules determined by historical industry incidents which form the basis of a minimum standard of safety behaviour. HUMAN RESOURCES • As of the end of June 2014 NRW employed a workforce of 3,092 (compared to 2,283 end June 13) • Key achievements in the year include: − Successful mobilisation of workforce to Roy Hill Rail and Concrete Projects. − Improved mobilisation system and reduced training expenditure during pre-mobilisation − Maintained minimal labour hire/agency usage • Maintained an industry leading 8% Indigenous participation (almost double the industry average of 4.2%*) and high retention rates. • 4 Powerup Programs completed for Roy Hill Rail Project. • Workforce size by Dec 14 – 1,800. *CME Discovery Newsletter, 20 November 2013. BUSINESS UNIT PERFORMANCE CIVIL DIVISION Highlights • Continued improvement in safety performance – TRIFR $m’s $m’s 1,000.0 160 to 2.1 (previously 2.5 at June 13). 860.6 842.3 140 • Revenue similar level to FY13, Margin at 7.1% reflects 800.0 more competitive market. 120 • Secured $620M Roy Hill Rail Contract. 600.0 92.0 100 • Growth on existing contracts. 80 59.8 400.0 10.7% 9.8% 10.8% 60 7.1% 40 Looking Forward 200.0 • Delivery of Roy Hill Concrete Package for the Iron ore 20 processing facility. - 0 FY 14 FY 13 FY 14 FY 13 • Complete delivery of Roy Hill Rail. Revenue EBIT • Build on relationships with Blue Chip Miners. • Tendering NPI prospects. Revenue Contribution • Bidding government infrastructure projects in JV for R5, B4 rating and independently through R4, B2 rating. 72% CIVIL DIVISION ROY HILL RAIL PROJECT Client: Samsung C&T Current status • Total works 87% complete. • Sections 1-3 handed over. Section 4 scheduled to complete this week (27/11/2014). 9.8% 10.8%10.7% • 290km of the total 330km7.1% of rail formation complete. • 40km of formation remaining on Section 5 & scheduled for completion in Jan 15. Update* * Refer to ASX operational update. • Contract interpretation differences • Outcome uncertain and may impact half year result. Roy Hill Rail Project, Section 4 CIVIL DIVISION ROY HILL CONCRETE PACKAGE Client: Samsung C&T Scope • Concrete and detailed earthworks for the iron ore processing plant, stockyard, overland conveyors and crushing areas. • 5km of rail works for the stackers and reclaimers. Current status • Total concrete Volume 50,000m3 • At end November 2014 works 85% complete. • Outstanding works reliant on Mechanical works being completed to allow follow on works. • Currently 450 employees on site. A ROM wall under construction at the Roy Hill Concrete Works Package. CIVIL DIVISION RIO TINTO PROJECTS NRW carried out a number of projects for Rio Tinto including: • Mesa J Rail Backtrack; • Mesa J TSF Extension; • Yandi Sustaining Project; 10.7% • ongoing maintenance9.8% 10.8% works at 7.1% Cape Lambert; and • significant additional works at the Nammuldi Below Water Table Project. Bridge construction at the Yandi Sustaining Project. MINING DIVISION Highlights $m’s $m’s 500.0 60 Revenue impacted by major client transitioning 404.5 • 50 to dry hire during 2013 and higher activity in the 400.0 first half of FY13. 40 300.0 30 • Awarded contract for ERA at Ranger. 186.9 200.0 17.9 20 • Awarded Iron Bridge bulk earthworks for 13.1 100.0 Fortescue. 7.8% 5.5% 10 7.0% 4.4% - 0 Looking Forward FY 14 FY 13 FY 14 FY 13 Revenue EBIT • Market conditions expected to remain competitive during FY15. Revenue Contribution • Tendering opportunities in base metals for mid-tier Miners. 16% • Full utilisation of existing mining fleet capable of delivering an additional ~ $150M revenue pa. • Bid activity increasing. ACTION DRILL & BLAST Highlights • Revenue at $110M reflects downturn in market and $m’s reduced civil drill & blast activity. 175.0 $m’s40 150.5 • Margins impacted by lower revenues and asset utilisation. 150.0 35 30 • Awarded a three year contract valued at $60M for drill and 125.0 110.0 25 blast operations at the Middlemount Coal Mine in 100.0 16.8 20 Queensland. 75.0 15 50.0 2.3% • Awarded a three year contract valued at $11M for Talison 10 7.0 11.2% 15.3% Lithium Greenbushes Mine in WA. 25.0 5 6.4% - 0 FY 14 FY 13 FY 14 FY 13 Looking Forward Revenue EBIT • Current market remains very competitive. • Opportunities under review include both Domestic and Revenue Contribution Overseas projects. 9% • Focus on smaller mining contracts for underutilised civil drill fleet. AES EQUIPMENT SOLUTIONS Highlights • Revenue and results impacted by significant $m’s $m’s maintenance expenditure cut-backs. 45.0 41.8 45 • Restructure and reduction in overhead costs. 40.0 40 35.0 35 • Obtained formal approval as a preferred supplier of Rio 30.0 28.0 30 25.0 25 Looking Forward 20.0 20 15.0 15 • AES business launched rebrand reflecting focus on the (2.9)% 10.0 10 provision of equipment solution to all markets. 7.9% 5.0 3.3 5 • Early success expanding customer base - 0 (5.0) (0.8) -5 • Focus on employee and customer engagement to drive FY 14 FY 13 FY 14 FY 13 strategic agenda. Revenue EBIT • Market conditions are expected to remain subdued near term. Revenue Contribution • In the medium term the equipment maintenance cycle 2% is expected to recover. FINANCIAL OVERVIEW SUMMARY FINANCIALS • Revenue in line with FY14 guidance • EBITDA margin at 10.8% compared to 12.1% reflects more competitive market • Impairment (AMS) relates to downturn in client Opex and lower product sales • Interest costs slightly lower – Debt mostly fixed over 4 to 5 years • Effective tax rate at 14% includes credits received in the first half. CASHFLOW $m's • Improved Net debt from $88.6M to 60 $34.0M Nebt Debt Movement - FY14 • Full conversion of EBITDA ($123.0M) 40 into operating cashflow • Capex spend – $29.6M reflects 20 (29.6) completion of current investment 2.3 cycle 0 • Systems development 123.0 (21.2) • Buy out of expensive (34.0) -20 operating leases (20.0) • Business critical equipment -40 • Gearing ratio at 9.1% (88.6) • Other movements include equipment disposals ($5.1M) -60 -80 -100 Nebt debt EBITDA CAPEX Working Net Dividends Net debt FY13 capital interest & & Other FY14 Tax BALANCE SHEET 400.0 Net Tangible Assets - June 14 • Strong balance sheet with increasing value of cash and net owned equipment. 350.0 18.9 • Net Tangible Assets per share of $1.22 cents • Cash Balances provide risk mitigation and 300.0 allow fast response to changing market 189.5 250.0 • Funding access to support growth 155.5 • Available undrawn asset financing 200.0 – $71M 354.8 339.6 • Undrawn bonding at circa $72M 150.0 • Undrawn working capital $35M 100.0 • Balance sheet and debt equity position 165.3 support dividend payout ratio increase to 57% 50.0 • Final Dividend declared at 5 cents per share fully franked - Property, Debt Cash at Working Net tangible Plant & bank capital assets Equipment Net value of owned equipment TENDER PIPELINE & SUMMARY TENDER PIPELINE • Order book at $0.7 billion in line with project revenues in Q1. Work in Hand – Delivery Profile • Over $150m in new contract awards $ billions 0.8 and extensions since 30 June 2014.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    29 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us