Release Notice This Document Is Available Through the Australia Pacific LNG Upstream Phase 1 Project Controlled Document System Teambinder™

Release Notice This Document Is Available Through the Australia Pacific LNG Upstream Phase 1 Project Controlled Document System Teambinder™

Pre-Clearance Survey Report Mainline (Dawson Highway Crossing – Mainline Valve 4) Project Report Release Notice This document is available through the Australia Pacific LNG Upstream Phase 1 Project controlled document system TeamBinder™. The responsibility for ensuring that printed copies remain valid rests with the user. Once printed, this is an uncontrolled document unless issued and stamped Controlled Copy. Third-party issue can be requested via the Australia Pacific LNG Upstream Phase 1 Project Document Control Group. Document Conventions The following terms in this document apply: x Will, shall or must indicate a mandatory course of action x Should indicates a recommended course of action x May or can indicate a possible course of action. Document Custodian The custodian of this document is the Australia Pacific LNG Upstream Phase 1 Project – Pipelines. The custodian is responsible for maintaining and controlling changes (additions and modifications) to this document and ensuring the stakeholders validate any changes made to this document. Deviations from Document Any deviation from this document must be approved by the Australia Pacific LNG Upstream Phase 1 Project – Pipelines Environmental Manager. Disclaimer This report has been prepared on behalf of and for the exclusive use of Australia Pacific LNG, and is subject to and issued in accordance with the agreement between Australia Pacific LNG and AMEC Environment and Infrastructure Pty Ltd. Australia Pacific LNG and AMEC Environment and Infrastructure Pty Ltd accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this report by any third party. Copying this report without the permission of Australia Pacific LNG or AMEC Environment and Infrastructure Pty Ltd is not permitted. Doc Ref Q-1801-15-RP-0020 Revision: 0 Page 2 of 156 Pipelines, Australia Pacific LNG Upstream Phase 1 Uncontrolled when printed unless issued and stamped Controlled Copy. Pre-Clearance Survey Report Mainline (Dawson Highway Crossing – Mainline Valve 4) Project Report Table of Contents 1. Executive Summary................................................................................... 6 1.1. Abbreviations...............................................................................................8 1.2. Document References................................................................................... 10 2. Introduction ..........................................................................................11 2.1. Compliance Table ....................................................................................... 12 2.2. Approval Conditions and Legislative Constraints................................................... 16 2.3. Scope and Purpose ...................................................................................... 17 2.4. Approach to Address Approval Conditions........................................................... 17 2.4.1. Reporting................................................................................................. 17 2.4.2. Route Refinement....................................................................................... 17 2.4.3. Surveys ................................................................................................... 18 2.5. Ecological Surveys Undertaken to Date.............................................................. 18 3. Detailed Fieldwork Methodology ..................................................................20 3.1. Approach .................................................................................................. 20 3.2. Nomenclature ............................................................................................ 20 3.3. Flora Survey .............................................................................................. 20 3.3.1. Preliminary Assessment and Site Planning........................................................... 20 3.3.2. Methodology ............................................................................................. 21 3.3.3. Flora Survey Timeframe................................................................................ 22 3.3.4. Field Data ................................................................................................ 22 3.3.5. RE Associations and Micro-habitat Features......................................................... 22 3.3.6. Data Capture and Field Equipment ................................................................... 25 3.4. Fauna Survey ............................................................................................. 25 3.4.1. Surveys Undertaken to Date ........................................................................... 25 3.4.2. Preliminary Assessment and Site Planning........................................................... 26 3.4.3. Target Fauna Species ................................................................................... 26 3.4.4. Methodology ............................................................................................. 27 3.5. Fauna Survey Site Assessment......................................................................... 30 3.5.1. Survey Site 3A ........................................................................................... 31 3.5.2. Survey Site 3B ........................................................................................... 32 3.5.3. Survey Site 3C ........................................................................................... 33 3.5.4. Survey Site 3D ........................................................................................... 34 3.5.5. Survey Site 3E ........................................................................................... 35 3.5.6. Survey Site 3F............................................................................................ 36 3.5.7. Survey Site 3H ........................................................................................... 38 Doc Ref Q-1801-15-RP-0020 Revision: 0 Page 3 of 156 Pipelines, Australia Pacific LNG Upstream Phase 1 Uncontrolled when printed unless issued and stamped Controlled Copy. Pre-Clearance Survey Report Mainline (Dawson Highway Crossing – Mainline Valve 4) Project Report 4. Pre-Clearance Survey Results ......................................................................39 4.1. Flora Assessment......................................................................................... 39 4.1.1. Threatened Ecological Communities (TECs)......................................................... 39 4.1.2. Regional Ecosystems.................................................................................... 40 4.1.3. Recorded MNES and EVNT-only Flora Species ....................................................... 49 4.1.4. Pest Flora Species....................................................................................... 50 4.2. Fauna Assessment ....................................................................................... 51 4.2.1. Recorded Fauna Species................................................................................ 51 4.2.2. Pest Fauna Species...................................................................................... 53 4.2.3. MNES Fauna Species .................................................................................... 53 4.2.4. EVNT-only Fauna Species............................................................................... 62 5. Recommendations and Outcomes .................................................................66 5.1. Proposed Realignments ................................................................................. 66 5.2. Proposed ROW Narrowings ............................................................................. 66 5.3. Proposed Access Tracks................................................................................. 67 5.3.1. Proposed Access Track KP 302.29..................................................................... 67 5.3.2. Proposed Access Track KP 316.52..................................................................... 67 5.3.3. Proposed Access Track KP 319.17..................................................................... 68 5.3.4. Proposed Access Track KP 321.44..................................................................... 68 5.3.5. Proposed Access Track KP 325.30..................................................................... 68 5.3.6. Proposed Access Track KP 331.80..................................................................... 68 5.3.7. Proposed Access Track KP 333.75..................................................................... 68 5.3.8. Proposed Access Track KP 342.00..................................................................... 69 5.3.9. Proposed Access Track KP 347.60..................................................................... 69 5.4. Wetlands, Lakes, Springs and Watercourses ........................................................ 69 5.5. Environmentally Sensitive Areas ...................................................................... 73 5.6. Summary of Recommendations........................................................................ 74 6. Conclusions ...........................................................................................81 7. References............................................................................................82 Appendix A: Scope and Data Collection ................................................................85

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    84 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us