Tennant Creek 2019

Tennant Creek 2019

SUPER TUESDAY BIKE COUNT Tennant Creek 2019 About the count About the count Aims and purposes Methodology The Super Tuesday Bike Count Super Tuesday is designed to The Super Tuesday counters (Super Tuesday) collects complement the surveys that collect data from intersections reliable annual fgures of individual councils and other along popular commuter bicycle commuters and their agencies run on a regular or routes, as well as subsidiary movements on roads and bike occasional basis. routes with lower rider paths. volumes. The project aims to answer Since 2007, Bicycle Network some critical questions: Bicycle Network coordinates has conducted bicycle counts the count at locations at key intersections and • How many riders are there? nominated by trafc engineers, corridors that were selected by • Which routes are riders transport planners, and local governments. using? other transport ofcers from participating councils. This information is accurate, • What is the year-on-year relevant, up-to-date, and growth? The counts were conducted by provides a longitudinal • How many women are volunteer counters who record refection of cycling activity riding? all movements, gender of and trends. The data is a riders and their observations in critical tool for councils and • When is the busiest hour? ffteen minute time intervals on other agencies responsible for standardised count sheets. providing bike riding facilities for their constituents. Following the completion of the visual count, counters send their data to Bicycle Network by one or more of the following: • Online: by entering the data directly via the web link • Email: by sending completed electronic tally sheet attached • Mail: by posting hard copy to the Bicycle Network ofce The submitted data are validated, analysed and visualised by Bicycle Network, and subsequently compiled into reports for participating councils and other agencies. Super Tuesday Bike Count Report 2019 Page iii Count Summary in Tennant Creek 3 SEPTEMBER 2019 1 5 6.30AM-8.30AM LOCATION MOVEMENTS COUNT IN 2019 COUNT SITES TRAFFIC FLOW The Super Tuesday Bike Count A single site (7251) was A total of 5 movements was conducted on Tuesday 3 surveyed in Tennant Creek. was counted at all selected September 2019 for two hours intersections across the council from 6:30am to 8:30am. area during the two-hour survey. It was fne in Tennant Creek on the day of the count, with moderate easterly winds reaching 22km/h, and a maximum temperature of 22.6 degrees at 9am. By participating in the count, volunteer counters can choose a local community group to receive a donation of $60, which goes back to the local community through donations to nominated groups. 6.30 8. 15 6.45 Peak Hour Peak Female 40% 8.00 7.00 Male 60% 2019 2018 7.1 5 25% 7.45 7.30 7.30 GROWTH GENDER RATIO PEAK HOUR Overall, usage has increased by Female represented 40% The busiest hour was between 25% (5 movements) compared of bike riders across the 7:30 - 8:30am during the to 2018 (4 movements). municipality. survey. This is higher than the average The average volume in 15 female ridership across minute time intervals is as Northern Territory (30%), and follows. the Australia-wide average of surveyed areas in 2019 (25%). • 6:30-6:45am: 0 movements • 6:45-7:00am: 1 movements • 7:00-7:15am: 0 movements COUNT • 7:15-7:30am: 0 movements RESULTS • 7:00-7:15am: 0 movements • 7:15-7:30am: 0 movements p. 8 • 7:30-7:45am: 0 movements The summary data table • 7:45-8:00am: 1 movements and analysis on each site are • 8:00-8:15am: 1 movements included in this chapter. • 8:15-8:30am: 2 movements Data table in Excel spreadsheet is supplied with this report. Super Tuesday in 2019 THE COUNT The peak hour across all riders counted across the state, sites was between 7:45am 5% lower than the national Bicycle Network’s Super and 8:45am, with over 80K average. Tuesday Bike Count is the movements recorded across world’s biggest and longest the states during this time. Queensland running visual bike count, where volunteers measure bike Council participation increased commuter fows in the morning in Queensland this year, with peak across the country. The RESULTS BY STATES the inclusion of Brisbane and count provides quantitative Tasmania Noosa; and the return of Cairns, surveys with fgures on the who last participated in 2015. movements of bike users, The overall number of riders in Over 8000 movements helping councils provide and Tasmania has decreased by 5% were recorded across the improve infrastructure and compared to the same sites as 168 Queensland sites, an facilities for people riding bikes. 2018. Females comprised 26% increase of 6%. The weather of all riders. The Super Tuesday Bike Count was fne during both the frst was conducted on Tuesday Victoria and second counts. Female 3 September 2019 between participation was 24%, just 7:00am and 9:00am (6:30am In Victoria, the number of under the national average. and 8:30am in the Northern riders increased by 6% when Territory). Where necessary, compared to the same sites Northern Territory counted in 2018. Female riders a recount was conducted on Just under 4000 movements comprised 26% of the total Tuesday 24 September. were recorded across 75 sites proportion of riders counted in Northern Territory, a minor In the 2019 count, 1050 across the state, slightly higher decrease compared to 2018. sites were surveyed across than the national average. 48 councils. This year we However, the state leads the welcomed Brisbane and Noosa New South Wales country in female participation to the Counts program, and (31%), which is 6% higher than created 168 new count sites In New South Wales, the the national average. Amazing! across Australia. number of riders increased by a signifcant 49% when Just under 150K movements compared to the same sites were recorded nationally counted in 2018. This is due during the two hour count. The to an exceptional increase in national site results reveals a bike rider volumes in Lake 9% increase when compared to Macquarie. However, female the same locations in 2018. riders comprised 19% of the total proportion of riders Volunteer participants were counted, which the lowest thanked with a donation of proportion across the states. $60 from Bicycle Network to Weather conditions were a community group of their generally fne across NSW, with choice. The total donation a warm temperature of 25.4 value was over $58K. degrees in Sydney at 9am. The 2019 Super Tuesday Western Australia Bike Count suggests females comprise 25% of bike riders In Western Australia, the total across Australia. This is a slight number of riders increased by increase of 1% when compared 10% when compared to the to the 2018 Super Tuesday same sites counted in 2018. count. Female riders comprised 20% of the total proportion of Super Tuesday Bike Count Report 2019 Page 1 Super Tuesday Bike Count Report 2019 Page 2 Super Tuesday Bike Count Report 2019 Page 3 Super Tuesday Bike Count Report 2019 Page 4 Super Tuesday Bike Count Report 2019 Page 5 Super Tuesday Bike Count Report 2019 Page 6 Results Total Count Volume in 15 Minute Intervals Site ID names Street Female Male Not Known 2019 2018 % Growth 6:30-6:45 6:45-7:00 7:00-7:15 7:15-7:30 7:30-7:45 7:45-8:00 8:00-8:15 8:15-8:30 7251 Northbound (school side) [N], 2 3 0 5 4 25% 0 1 0 0 0 1 1 2 Southbound (shop side) [NE], Southbound (shop side) [S], Northbound (school side) [SW] Super Tuesday Bike Count Report 2019 Page 7 Site 7251 Northbound (school side) [N], Southbound (shop side) [NE], Southbound (shop side) [S], Northbound (school side) [SW] 5 bicycle riders were recorded during the 2 hour survey. This is an increase of 25% sid compared to 4 in 2018. The peak period was 08:15-08:30 with 2 riders. Female riders 1 2 (school comprised 40% of the total. The most active thoroughfare in site 7251 was from Southbound (shop side) [NE] to Northbound Southbound (shop side) Southbound (shop side) [S] between 07:45 AM - 08:00 AM, with 1 total riders counted during this period. There is not enough linear trend data to calculate the growth and side) decline of this site over time. (shop 4 3 outhbound Northbound (school side) Traffic Volume by Time Gender Ratio Cycling Trend Traffic Flow ↗ 3 ↙ 1 ↙ 1 ↓ 1 ↑ 4 Raw Data Enter 1 Northbound (school 2 Southbound (shop 3 Southbound (shop 4 Northbound (school side) [N] side) [NE] side) [S] side) [SW] Exit 2 3 4 1 3 4 1 2 4 1 2 3 To t a l Female 0 0 0 0 0 0 0 1 1 0 0 0 2 Male 0 0 0 0 1 0 0 2 0 0 0 0 3 Not known 0 0 0 0 0 0 0 0 0 0 0 0 0 To t a l 0 0 0 0 1 0 0 3 1 0 0 0 5 Super Tuesday Bike Count Report 2019 Page 8 Contributions National contributions The Super Tuesday Bike Count is powered by local volunteers, who collect data at council-nominated locations across Australia. In return, volunteers nominate a non- proft or charity to receive a donation of $60, or place this contribution toward a Bicycle Network membership. The 2019 Super Tuesday count raised $58,440 in donations nationally, strengthening local communities and building better active transport outcomes. With nearly 50,000 members, Bicycle Network is the largest member-based bike riding organisation in Australia.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us