Projekti 1 Project 2

Projekti 1 Project 2

functional area programme PROJECT 2 PROJEKTIfap 1 Project Title Building the touristic road Topojan-Kroi i Kuq-Tërshenë-Bicaj Project Type Touristic Infrastructure Project Location Topojan dhe Bicaj Communes Total Pre-Estimated Budget 200,000 Euro Project Background Tourism is a main priority of the Regional Development Strategy of Kukës Qark and Analysis and Gjallica area is the second priority area for tourism development after Shishtavec. Almost all the region's touristic areas have been covered through implementation of different projects. Among these, there is Bjeshket e Gjallices, which does not have access into developed infrastructure to enable its exploration. During summer time, this area is visited a lot by the inhabitants of the communes around, who exploit the rich wealth of herbs and curative plants. In these unused areas, the number of adventure tourists has significantly increased, as well. Taking into account that the area of Bicaj and Topojan have the same values regarding the touristic attractions, the need to build a road for shortening the distances, has arisen, connecting better these two areas and enabling the use of this rich area in a much shorter time than the existing one. Specific Objectives SO1: To shorten the distance and to facilitate greater outreach to touristic places SO2: To enhance interaction and communal cooperation of the Project So3: To increase number of local and foreign tourists and enhance investments in these areas 6 PROJECT 2 fapfunctional area programme R.1 Developed touristic infrastructure in Gjallica area Expected Results R.2 Shortened distance and lower transport cost for the areas around and Project Indicators R.3 Rational use of natural wealth R.4 Increased number of local and foreign tourists Project Activities 1. Compilation of the technical project on road building 2. Building of road (art work, road signs, touristic signs, etc.) 3. Local capacities building for tourism promotion The project is thought to be implemented for a two year period. Project Maturity An area study is lacking and it is necessary to carry out such a study on the interventions study, including setting the touristic landmarks and the necessary sings. The project funders: Financial Resources and - There are no defined sources, yet Implementation Partners The project will be implemented by: - Agency of Regional Development of Kukës - Council of Kukës Qark - Kukës Municipality Technical Project for the road 10,000€; Project Cost Road building (art works, road signs, touristic signs, etc.) 175,000€; Training of two communes staff on promotion of touristic values 5,000€; Promotion of natural values of the area by means of leaflets, guides, documentaries, activities etc. 10,000€. 7.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us