Evaluation of Dam Water-Supply Capacity in Korea Using the Water-Shortage Index

Evaluation of Dam Water-Supply Capacity in Korea Using the Water-Shortage Index

Supplementary Materials Evaluation of Dam Water-Supply Capacity in Korea Using the Water-Shortage Index Chulsang Yoo 1, Changhyun Jun 2, Ju Hua Zhu 1 and Wooyoung Na 1,* 1 School of Civil, Environmental and Architectural Engineering, College of Engineering, Korea University, Seoul 02841, Korea; [email protected] (C.Y.); [email protected] (J.H.Z.) 2 Department of Civil and Environmental Engineering, College of Engineering, Chung-Ang University, Seoul 06974, Korea; [email protected] * Correspondence: [email protected]; Tel.: +82-2-3290-3912 (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) Figure S1. Simulation results of multi-purpose dams in Korea: (a) Soyanggang Dam; (b) Chungju Dam; (c) Heongseong Dam; (d) Andong Dam; (e) Hapcheon Dam; (f) Imha Dam; (g) Namgang Dam; (h) Miryang Dam; (i) Daecheong Dam; (j) Yongdam Dam; (k) Seomjingang Dam; (l) Juam Dam; (m) Juam Controlled Dam; (n) Jangheung Dam; (o) Buan Dam; (p) Boryeong Dam. (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) Figure S2. Estimation results of SI for multi-purpose dams in Korea: (a) Soyanggang Dam; (b) Chungju Dam; (c) Heongs- eong Dam; (d) Andong Dam; (e) Hapcheon Dam; (f) Imha Dam; (g) Namgang Dam; (h) Miryang Dam; (i) Daecheong Dam; (j) Yongdam Dam; (k) Seomjingang Dam; (l) Juam Dam; (m) Juam Controlled Dam; (n) Jangheung Dam; (o) Buan Dam; (p) Boryeong Dam. (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) Figure S3. Estimation results of GSI for multi-purpose dams in Korea: (a) Soyanggang Dam; (b) Chungju Dam; (c) Heongs- eong Dam; (d) Andong Dam; (e) Hapcheon Dam; (f) Imha Dam; (g) Namgang Dam; (h) Miryang Dam; (i) Daecheong Dam; (j) Yongdam Dam; (k) Seomjingang Dam; (l) Juam Dam; (m) Juam Controlled Dam; (n) Jangheung Dam; (o) Buan Dam; (p) Boryeong Dam. (a) (b) (c) (d) Figure S4. Estimation results of SI for major river basins in Korea: (a) Han River Basin; (b) Nakdong River Basin; (c) Geum River Basin; (d) Seomjin River Basin (Here, Juam (I) and Juam (II) correspond to the Juam Dam and the Juam Controlled Dam, respectively). Figure S5. Estimation results of SI for the total river basin in Korea (Here, Juam (I) and Juam (II) correspond to the Juam Dam and the Juam Controlled Dam, respectively). .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    8 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us