Surface Ship Support Barge Dismantlement and Disposal

Surface Ship Support Barge Dismantlement and Disposal

DECOMMISSIONING WORK PLAN SURFACE SHIP SUPPORT BARGE DISMANTLEMENT AND DISPOSAL Project Number: 501513 Contract Number: N00024-20-C-4139 Prepared for Naval Sea Systems Command 614 Sicard Street SE Washington Navy Yard, DC 20376-7007 Prepared by Aptim Federal Services, LLC 11400 Parkside Drive, Suite 400 Knoxville, Tennessee 37934 April 2021 Revision 1 DECOMMISSIONING WORK PLAN SURFACE SHIP SUPPORT BARGE DISMANTLEMENT AND DISPOSAL Prepared by APTIM Federal Services, LLC 11400 Parkside Drive, Suite 400 Knoxville, Tennessee 37934 April 2021 Revision 1 Reviewed/Approved by: __________________________________ Date: April 7, 2021 Michael A. Carr, CHP APTIM Project Radiation Safety Officer 865-250-2149 Reviewed/Approved by: __________________________________ Date: April 7, 2021 Art Palmer, CHP APTIM Technical Manager 865-765-7898 Reviewed/Approved by: __________________________________ Date: April 7, 2021 Rick Greene, CHP APTIM Certified Health Physicist 865-604-2338 Reviewed/Approved by: __________________________________ Date: April 7, 2021 Bruce A. Fox, PMP APTIM Project Manager 208-901-2142 Reviewed/Approved by: __________________________________ Date: April 7, 2021 Robert Biolchini, PE APTIM Site Manager 419-306-8994 Surface Ship Support Barge (SSSB) Dismantlement and Disposal Rev. 1 Contract Number N00024-20-C-4139 April 2021 Decommissioning Work Plan 501513 Record of Revisions Revision No. Description of Revision Date 0 Decommissioning Work Plan August 2020 1 Decommissioning Work Plan April 2021 - Various changes throughout based on NRC comments on Rev. 0 document and to incorporate minor updates to project status/approach. i Surface Ship Support Barge (SSSB) Dismantlement and Disposal Rev. 1 Contract Number N00024-20-C-4139 April 2021 Decommissioning Work Plan 501513 Table of Contents Record of Revisions ......................................................................................................................... i List of Tables ................................................................................................................................. xi List of Figures ................................................................................................................................ xi List of Attachments ....................................................................................................................... xii Acronyms and Abbreviations ...................................................................................................... xiii Executive Summary .................................................................................................................. ES-1 1.0 Facility Operating History .................................................................................................. 1-1 1.3.1 Office (Former Laundry) .............................................................................. 1-2 1.3.2 Machine Shop/Component Assembly – Disassembly .................................. 1-2 1.3.3 Dry Pit .......................................................................................................... 1-3 1.3.4 Laundry Drain/No.4 Centerline Tanks ......................................................... 1-3 1.4.1 Wet Pit Leakage ............................................................................................ 1-4 2.0 Facility Description ............................................................................................................ 2-1 2.1.1 Clean House, Wet Pit, and Shroud Canister Loading Station ...................... 2-1 2.1.1.1 Clean House ................................................................................... 2-1 2.1.1.2 Fuel Holding (Wet) Pit ................................................................... 2-2 2.1.1.3 Shroud Canister Loading Area ....................................................... 2-2 2.1.2 Heavy Component Shop ............................................................................... 2-2 2.1.3 Change Room and Casualty Control Station ................................................ 2-3 2.1.4 Log Room, Clean Tunnel, and Dirty Tunnel ................................................ 2-3 2.1.5 Pump Rooms ................................................................................................. 2-3 2.1.5.1 Main Pump Room .......................................................................... 2-4 2.1.5.2 Auxiliary Pump Room ................................................................... 2-4 2.1.6 Miscellaneous Spaces and Tanks .................................................................. 2-4 2.1.7 Heating, Ventilation, and Air Conditioning ................................................. 2-4 2.1.7.1 Office (Non-Radiologically Controlled) HVAC System ............... 2-5 2.1.7.2 Forward Potentially Contaminated HVAC System ....................... 2-5 ii Surface Ship Support Barge (SSSB) Dismantlement and Disposal Rev. 1 Contract Number N00024-20-C-4139 April 2021 Decommissioning Work Plan 501513 2.1.7.3 Aft Potentially Contaminated HVAC System ................................ 2-5 2.1.7.4 Change Room Exhaust, Chiller Equipment Room, and Machine Shop Ventilation Systems .............................................................. 2-5 2.4.1 Site Location and Description ...................................................................... 2-6 2.4.2 Population Distribution ................................................................................. 2-6 2.4.3 Current/Future Land Use .............................................................................. 2-7 2.5.1 Tow Route Description ................................................................................. 2-7 2.6.1 Site Description and Location ...................................................................... 2-7 2.6.2 Population Distribution ............................................................................... 2-10 2.6.3 Current/Future Land Use ............................................................................ 2-10 2.6.4 Mobile Bay ................................................................................................. 2-11 2.6.5 Climatology ................................................................................................ 2-11 2.6.6 Geology and Seismology ............................................................................ 2-13 3.0 Radiological Status ............................................................................................................. 3-1 3.1.1 Heavy Component Shop ............................................................................... 3-1 3.1.2 Casualty Control and Guard Stations ........................................................... 3-1 3.1.3 Change Room and Restroom ........................................................................ 3-1 3.1.4 Control Point/Anti-C Removal Area ............................................................ 3-1 3.1.5 Fan Room 2 (Aft) .......................................................................................... 3-2 3.1.6 Dirty Tunnel .................................................................................................. 3-2 3.1.7 Clean Tunnel ................................................................................................. 3-2 3.1.8 Clean House .................................................................................................. 3-2 3.1.9 Log Room ..................................................................................................... 3-2 3.1.10 Count Room .................................................................................................. 3-2 3.1.11 Main Pump Room Access ............................................................................ 3-2 3.1.12 Auxiliary Pump Room Access ...................................................................... 3-2 3.1.13 Office Spaces ................................................................................................ 3-3 3.1.14 Fan Room 1 (Forward) ................................................................................. 3-3 3.1.15 Machine Shop (Re-purposed) ....................................................................... 3-3 iii Surface Ship Support Barge (SSSB) Dismantlement and Disposal Rev. 1 Contract Number N00024-20-C-4139 April 2021 Decommissioning Work Plan 501513 3.1.16 Wing Tanks ................................................................................................... 3-3 3.1.17 Centerline Tank 3 ......................................................................................... 3-3 3.1.18 Centerline Tank 4 ......................................................................................... 3-4 3.1.19 Centerline Tank 8 ......................................................................................... 3-4 3.1.20 Centerline Tank 9 ......................................................................................... 3-4 3.1.21 Wet and Dry Pits ........................................................................................... 3-4 3.1.22 Wet Pit Shield Water Voids .......................................................................... 3-4 3.1.23 Wing Tank Voids (Port and Starboard) ........................................................ 3-4 3.1.24 Centerline Tank 3 Void ................................................................................ 3-5 3.1.25 Auxiliary Pump Room .................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    423 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us