About the Keystone Corridor Amtrak Station Improvement Project

About the Keystone Corridor Amtrak Station Improvement Project

Amtrak Station Improvement Project Keystone Corridor - Middletown Station ABOUT THE KEYSTONE CORRIDOR The Keystone Corridor is a 105-mile railroad line between Harrisburg and Philadelphia, Pa. AMTRAK runs 11 eastbound and 12 westbound trains that stop at Middletown Station. Ardmore These trains provide service Paoli between Harrisburg and Keystone Corridor Middletown Station Exton Philadelphia Philadelphia with connections Elizabethtown onward to New York City. Harrisburg Downingtown Lancaster Coatesville Middletown Station ridership was Mount Joy 68,484 in 2015. Parkesburg New Middletown Station Phase I: • Currently in construction • Includes grading, fencing, drainage (including basins) and demolition of existing structures on the site • Completed by PennDOT Phase II: • Construction anticipated to begin summer 2017 • Includes track work, electrification traction, platforms and pedestrian access towers for ingress/egress to the new station • Completed by AMTRAK, Norfolk Southern or other designated contractors Rendering of New Middletown Station Pedestrian Bridge Site Specifications P3 Developement • Location: Intersection of Ann Street and Opportunity: State Route (SR) 230 (West Main Street) The potential for a new • Development Space Available: 8.38 acres commercial development that • Zoning: C-1 Commercial complements the parking facility • Utilities: and newly relocated AMTRAK 8” water line within Emaus Street cart way from SR 230 to Wood Middletown Station. Street with a 375’-long 8” water line service to site 2” electrical conduit in parking lots and roadway for lighting New Middletown Station Construction Phases The P3 Project • DBFOM parking facilities that provide a • Finalize the Emaus Street extension and construct minimum of 400 parking spaces a pedestrian bridge over SR 230 • Fixed-price parking fee structure • Operations and Maintenance Term: 30 years (min) • Potential commercial/retail development • Land Lease: Approximately 50 years (commercialization activities) RFP Selection Standards • Lowest subsidization by PennDOT and funding partners • Most useful and meaningful development of land • Operations and Maintenance Plan • Maximize revenue from parking and commercialization activities Rendering of Pedestrian Bridge and Potential Commercial Development P3 Project Schedule: December 16, 2016 - RFQ Response Due Date For More Information: Public-Private Transportation Partnerships Office Email: [email protected].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us