Appendix H Locational Impacts of Trans Theme Packages

Appendix H Locational Impacts of Trans Theme Packages

Appendix H Facility Specific Impacts of the Transportation Theme Packages Appendix H Facility specific impacts of the Transportation Theme Packages Appendix H discusses the facility specific impacts of the transportation theme packages. The appendix is divided into three parts. Part 1 (page H-2) lists the analyzed transportation options for each grouping within each theme. Part 2 (Page H-4) lists the facility specific impacts of each of the options. Part 3 (page H-15) describes the key findings of these analyses. Part 1 – Analyzed Transportation Options for Each Theme and Grouping Interstate Theme Interstate 1 (Grouping 1) -- This package includes primarily system management types of strategies: · #2 - Increase speed limit on the Maine Turnpike from 55 mph to 60 mph between 6A and 9 and on Falmouth Spur · #3 - Reconfigure Falmouth Spur/I-95/I-295 Interchange in Falmouth · #4 - Add SB lane on I-295 between Exit 3 (Westbrook St) and 4 (Route 1) in South Portland · #5 - Add NB lane on I-295 between Exit 6 (Forest Ave) and 7 (Franklin St) in Portland · #7 - Regional Ring road (keeps Route 703 as freeway facility) · #11 - Reconfigure I-295 Exit 4 in South Portland (not modeled) · #12 - Ramp reconfiguration of Exit 3/Westbrook Street in South Portland · #13 - Full interchange at Route 26/100 and Falmouth Spur in Falmouth · #6 - Regional Toll system with new toll plaza per latest Maine Turnpike Authority concept at Exit 7 (keeping Exit 6A plaza) and removing other plazas on Turnpike and Falmouth Spur. Interstate 2 (Grouping 2) -- Adds Turnpike widening to increment 1: · #1 - Widen Turnpike from 6A to 9 and increase speeds from 55 mph to 65 mph in South Portland, Portland and Falmouth. Interstate 3 (Grouping 3) -- Adds new alignment roadway to increment 1 and 2 · #14 - Limited Access Highway to Gorham from Turnpike Exit 7 in South Portland, Westbrook, Scarborough, Gorham. Interstate 4 (Grouping 4) -- Adds two new alignment roadways to increments 1 through 3: · #15 - Limited access road to Buxton · #16 - Limited access road from Turnpike to Sebago Lake Region. Interstate 5 (Grouping 5) -- Adds widening of I-295 to increment 1: · #8 Widen I-295 from Exit 3 (Westbrook Street) to Bucknam Road · #9 - Widen I-295 north of Bucknam Road. H-2 Arterial Theme Arterial 1 (Grouping 1) -- Changes/modifications to existing roadways such as widening, re- striping, etc.: · #3 - Convert Route 703 to arterial (w/o spur extension to Running Hill Rd), in South Portland · #4 - Widen Spring/Cummings Road & Congress St/County Road, in South Portland, Westbrook, Scarborough and Portland · #6b, c1, c2, d - Reconfigure/widen three Portland arterials (Brighton, Forest, Washington, in Portland · #11 - Widen Riverside Street at Exit 8 of the Turnpike, in Portland · #13 - Widen Route 1 to Dunstan Corner/Payne Road, in Scarborough. Arterial 2 (Grouping 2) -- Adds new alignment roadways to increment 1: · #1 - Gorham bypass, in Gorham · #2a - Southwest overlap bypass from Running Hill Road to Routes 25/114, South Portland, Scarborough and Gorham · #2b - Widen Running Hill Road (with Turnpike Exit 7 Spur extension), in South Portland · #5 - Gorham Industrial Park Road, in Gorham · #7 - I-295 Connector Road extension west to Congress Street, in Portland · #8 - Larrabee Road extension to Spring Street at Eisenhower Drive, in Westbrook · #9 - NB Route 1 On-ramp to Scarborough Connector, in Scarborough · #12 - Highland Ave connector to Rumery Road/Route 1, in South Portland. Arterial 3 (Grouping 3) -- Adds two additional new alignment roadways to increments 1 and 2: · #10 - Falmouth Spur extension arterial to Gorham/Moshers Corner, in Falmouth, Westbrook, Gorham · #17 - Arterial roadway from Maine Turnpike to Route 302/Moshers Corner in Windham. Transit Theme Transit 1 (Grouping 1) -- Increase frequencies on existing fixed routes: · #1 - Double existing route frequencies on METRO, South Portland Bus Service (SPBS) and Biddeford Saco Old Orchard Beach service (BSOOB services not modeled) Transit 2 (Grouping 2) -- Adds new fixed route services and route extensions to increased frequencies in increment 1: · 2a. Extend SPBS route from Maine Mall to WalMart, in South Portland and Scarborough · 2b. Extend METRO service to West Falmouth Crossing/Turnpike Exit 10, in Portland and Falmouth · 2c. New ‘Outer Ring’ Metro route from Prides Corner to Downtown Westbrook to Maine Mall, in Westbrook and South Portland · 2d. New ‘Inner Ring’ METRO route from Route 1 Falmouth to Ocean Avenue to Pulse, in Falmouth and Portland H-3 · 2e. Extension of METRO Route 4 along Route 25 to Gorham Village and new Park and Ride lots, in Gorham and Westbrook · 2f. New service connecting to METRO Route 2/FAST service from Windham to Prides Corner, in Windham and Westbrook · 2g. New Cape Elizabeth Commuter Service from Shore Road/Route 77 in Cape Elizabeth to Knightville/Millcreek in South Portland and Downtown Portland, in Cape Elizabeth, South Portland and Portland · 2h. New express bus service from Brunswick/Freeport to Portland, in Brunswick, Freeport and Portland · 2i. Port Shuttle circulator between passenger transportation centers, in Portland (not modeled). Transit 3A (Grouping 3A) -- New alignment Bus Rapid Transit service and system enhancements such as automatic vehicle location (AVL), dedicated bus lanes and signal pre- emption in addition to increments 1 and 2 (where service not conflicting): · #3a - Bus Rapid Transit. Transit 3B (Grouping 3B) -- New commuter rail or light rail service in addition to increments 1 and 2 (where service not conflicting): · #3b - Light rail and/or commuter rail. Part 2 – Facility-Specific Impacts of the Transportation Themes Base Scenarios The analysis below describes changes between the Base 2000 and the Base 2025 scenarios. Interstate Highways. Volumes typically increase 50% to 75% on both the northbound and southbound Maine Turnpike. Southbound increases are generally higher. Southbound volumes on the Falmouth Spur are estimated to double while northbound volumes increase slightly. On I- 295 volume increases on a percentage basis are lower than the Turnpike but start from higher base volumes. Increases are forecasted to be in the range of 20% to 50%. Northbound volumes are generally forecasted to have higher increases. Route 1 Corridor. In Scarborough and South Portland, volumes are forecasted to increase in the range of 25% to 40%. In Falmouth south of Bucknam Road, increases are forecasted of approximately 15% while north of Bucknam Road increases are forecasted to be 40% to 50%. Route 22 Corridor. The highest increases in this corridor are forecasted in the section from the new Exit 7A Maine Turnpike interchange through the Route 22/114 overlap area. Increases are over 50%. Increases closer to Portland are in the 15% to 25% range while west of the Route 22/114 overlap volumes increase approximately 45%. Route 25 Corridor. The highest forecasted increases in volumes occur near the new Maine Turnpike Exit 7B in the Rand Road/Larrabee Road area. Sections of Brighton Avenue, Larrabee Road and Bill Clarke Drive are forecasted to have increases over 50%. Volumes on Route 25 in H-4 Gorham are forecasted to increase approximately 35%. Intown of Capisic Street, volumes are forecasted to increase 15% to 25%. Route 302 Corridor. North of Riverside Street in Portland, volumes are forecasted to increase 30% to 40%. Intown of Riverside Street, increases are forecasted to be 10% to 20%. Route 26 & 26/100 Corridor. Near and north of Exit 10, volumes are forecasted to increase 25% to 35%. Intown of Exit 10, increases are in the range of 10% to 20%. Route 77 Corridor. Short sections of Route 77 on the one-way pair of State and High Streets between Park Avenue and Forest Avenue are forecasted to increase approximately 30% while other sections on the peninsula leading to the Casco Bay Bridge are forecasted to have 10% to 20% growth. The Casco Bay Bridge traffic is forecasted to grow by 30%, primarily due to increases in traffic along West Commercial Street due to the I-295 Connector. Sections in South Portland and Cape Elizabeth are forecasted to increase by 20% to 25%. Transportation Themes The analysis below compares describes volume changes relative to the Base 2025 scenario. Interstate Theme The Interstate Theme applies a series of Transportation Systems Management measures (Grouping 1) and interstate capacity increases to existing facilities (Groupings 2 and 5) and new facilities (Groupings 3 and 4) to evaluate their effectiveness on the regional roadway network. Interstate Grouping 1: Transportation System Management This scenario aims to increase the use of the interstate highway system (primarily the Maine Turnpike) for intra-regional trips by implementing the “Regional Ring Road” concept by removing tolls between Exit 7 and Exit 11 of the Maine Turnpike and improving interstate highway accessibility by reconfiguring/adding interchanges in Falmouth, Portland and South Portland. Auxiliary highway lanes are added between interchanges to improve safety. Interstate Highways. South of Exit 6A and Exit 7 of the Maine Turnpike, the model forecasts that volumes change by -10% to -25%, indicating the potential for diversion to non-interstate roadways with the implementation of the regional toll system/regional ring road strategies. North of Exit 6A/Exit 7, northbound Turnpike volumes increase by 30% to 40% from Exit 7 to Exit 8. From Exit 8 to Exit 9/Falmouth Spur, they increase more dramatically, approximately 50%. Southbound south of Exit 9, volumes increase less, in the range of 15% to 25%. I-295 northbound volumes are forecasted to change in the range of -10% to -25% throughout the corridor. Southbound volumes change in the range of -5% to -10%. Route 1 Corridor. Volumes north of the Haigus Parkway show an increase of approximately 10% indicating the potential for diversion from the Maine Turnpike due to the regional toll strategy. In most other locations, volumes are reduced approximately 10%.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us