Port of Miami Tunnel Florida Department of Transportation

Port of Miami Tunnel Florida Department of Transportation

Port of Miami Tunnel Florida Department of Transportation Location: Miami, Florida Date: 2011 – 2012 Structure: Highway Tunnel Length: Two (2) Bores, Each 4,200 feet (1,280 meters) Long and 41 feet (12.5 meters) in Diameter Geology: Fill and Marine Deposits Overlying the Tamiami, Hawthorne and Avon Park Formations which Consist of Oolitic Limestone, Sandstones, Sands, Cemented Sands, Sandy Limestones, Siltstones and Claystones Figure 1. West Portal and Eastbound TBM launch location on Watson Island. (Courtesy of FDOT) Cost: Approximately $1 Billion Client: Bouygues Civil Works Florida Owner: Florida Department of Transportation (FDOT) Assessment of Tunneling Induced Effects on Dodge Island Structures: he only access to the Port of Miami for shipping traffic involved T navigating downtown city streets. These restrictions caused traffic congestion and limited the economic development of the northern portion of Miami’s Central Business District. To alleviate these issues, the Port of Miami Tunnel was under construction, providing a direct underground connection from the Port of Miami at Dodge Island via Watson Island to I–95 and other highways. The twin tunnels were constructed by a 43 feet (13 meters) diameter Earth Pressure Balance Tunnel Boring Machine (EPBM) Figure 2. Existing structures on Dodge Island overlying twin TBM designed specifically for the geotechnical conditions on site. tunnels. The EPBM passed beneath a number of existing structures on Dodge Island including the Shed #2 building, the seawall and bulkhead, a pedestrian bridge and gantry, the Port Boulevard cargo bridge, the Seaman’s Center, and a swimming pool. Gall Zeidler Consultants (GZ) provided independent consulting services for the project including independent two and three- dimensional ground-structural numerical analyses to evaluate tunneling induced settlement impacts on the Dodge Island structures. GZ was also involved with developing response levels for the extensive instrumentation installed on the structures. www.gzconsultants.com .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us