Rewari (HARYANA) (AS PER SUPLEMENTRY DPR)

Rewari (HARYANA) (AS PER SUPLEMENTRY DPR)

DAKSHIN HARYANA BIJLI VITRAN NIGAM LIMITED SCHEME FOR HOUSEHOLD ELECTRIFICATION DISTRICT : Rewari (HARYANA) (AS PER SUPLEMENTRY DPR) DEEN DAYAL UPADHYAYA GRAM JYOTI YOJANA Table of Contents Sl.No. Format No. Name Page No. 1 A General Information 1 2 A(I) Brief Writeup 2 3 A(II) Minutes 2 4 A(III) Pert Chart 2 5 A(IV) Certificate 2 6 A(V) Basic Details of District 2 7 A(VI) Abstract : Scope of Work & Estimated Cost 4 8 A(VII) Financial Bankability 10 9 B Electrification of UE villages 12 10 B(I) Block-wise coverage of villages 13 11 B(II) Villagewise/Habitation wise coverage 14 12 B(III) Existing Habitation Wise Infrastructure 14 13 B(IV) Village Wise/Habitation Proposed Works 14 14 B(V) Existing REDB Infrastructure 14 15 B(VI) Block-Wise Substation 16 16 B(VII) Feederwise DTs 17 17 C Feeder Segregation 27 18 D Connecting unconnected RHHs 28 19 D(I) Block-wise coverage of villages 29 20 D(II) Villagewise/Habitation wise coverage 30 21 D(III) Existing Habitation Wise Infrastructure 30 22 D(IV) Village Wise/Habitation Proposed Works 30 23 D(V) Existing REDB Infrastructure 30 24 D(VI) Block-Wise Substation 32 25 D(VII) Feederwise DTs 33 26 E Metering 43 27 E(I) DTR Metering 44 28 E(II) Consumer Metering 133 29 E(III) Shifting of Meters 135 30 E(IV) Feeder Metering 136 31 F System Strengthening and Augmentation 137 32 F(I) Block-Wise Substation 138 33 F(II) EHV Substation Feeding the District 139 34 F(III) Districtwise Details of Existing 66 KV or 33 KV Lines 145 35 F(IV) Districtwise Details of Existing 11 KV or 22 KV Lines 147 36 F(V) Augmentation of 11 KV or 22 KV Line 156 37 G SAGY 160 38 G(I) Block-wise coverage of villages 161 39 G(II) Villagewise/Habitation wise coverage 162 40 G(III) Existing Habitation Wise Infrastructure 163 41 G(IV) Village Wise/Habitation Proposed Works 164 42 G(V) Details of New 11 KV or 22 KV Lines 166 Section -A Basic Details of District State : HARYANA District : Rewari Page 1 of 166 28/12/2015 (AS PER SUPLEMENTRY DPR) A(V) Basic Details of District for Supplementry DPR State : HARYANA District : Rewari Name of Project Implementing Agency Dakshin Haryana Bijli Vitran Nigam Limited Name of DISCOM Dakshin Haryana Bijli Vitran Nigam Limited Name of State HARYANA Name of District Rewari Total Population of district 900332 Total Geographical Area(SqKm) 1181 Percentage of Hilly area 0.5 Total Block in the district 5 Total Urban Town in the district 1 Total Urban Population in the district 233430 Population Of Urban Area 233430 Total Census Revenue Villages in the district 409 Total Habitations in the district 0 Total Rural Population in the district 666902 House Holds Details :- Description 2001 Census 2011 Census CAGR Total HHs by Total HHs by 31.03.2015 as derived 31.03.2019 as derived Total House Holds in the district 135560 178043 0.09 201139 229155 Rural HH in the district 110852 130299 0.02 139002 148286 Urban HH in the district 24708 47744 0.07 62137 80869 Total Energised HH in the district 126823 175921 0.03 200524 228567 Urban HH electrified in the district 24655 47663 0.07 62043 80761 Rural HH electrified in the district 102168 128258 0.01 140473 153851 Balance Un-electrified Rural HH 8684 2041 0.01 -1471 -5565 Page 2 of 166 28/12/2015 (AS PER SUPLEMENTRY DPR) A(V) Basic Details of District for Supplementry DPR State : HARYANA District : Rewari Balance Un-electrified Urban HH 53 81 0 94 108 Balance Total un-electrified HH in the 0 0 0 0 0 district Status of Already Sanctioned 10th / 11th / 12th Plan Projects :- Plan Un-Electrified Villages Intensive Electrified Villages Total Habitation RHH Incl. BPL BPL Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement 10th 0 0 0 0 0 0 0 0 0 0 11th 0 0 0 0 0 0 0 0 16684 16684 12th 0 0 0 0 0 0 0 0 0 0 Page 3 of 166 28/12/2015 (AS PER SUPLEMENTRY DPR) A(VI) Abstract : Scope of Work & Estimated Cost for Supplementry DPR State : HARYANA District : Rewari S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) C.Sansad Adarsh Gram Yozna Capacity Augmentation of DTR 1 Bawal From Existing to 63 KVA Nos. 3 1.3917 4.1751 Sub-Total (Capacity Augmentation of DTR) 3 4.1751 Conversion of existing LT Overhead lines to ABC Cable 2 Bawal 3X95+1X70 Kms. 0.5 5.3706 2.6853 Sub-Total (Conversion of existing LT Overhead lines to ABC Cable) 0.5 2.6853 New 11 KV Line 3 BOLNI FEEDER DS(JC IV To BOLNI VILLAGE) PCC POLES WITH RABBIT CONDUCTOR Kms. 21 4.2398 89.0358 Sub-Total (New 11 KV Line) 21 89.0358 New 11 KV Line DTR 4 Bawal 25 KVA (3 Ph) Nos. 8 1.2065 9.652 63 KVA (3 Ph) Nos. 2 1.8003 3.6006 Sub-Total (New 11 KV Line DTR) 10 13.2526 New 11 KV Spur Line 5 Bawal 11 KV Raccon Conductor Kms. 2.5 4.9245 12.31125 Sub-Total (New 11 KV Spur Line) 2.5 12.31125 New LT AB Cable 6 Bawal 3X95+1X70 Kms. 0.12 5.3706 0.64447 Sub-Total (New LT AB Cable) 0.12 0.64447 New LT Overhead Line 7 Bawal Raccoon (75sqmm) 3Ph-N (4W) Kms. 1 4.038 4.038 Page 4 of 166 28/12/2015 (AS PER SUPLEMENTRY DPR) A(VI) Abstract : Scope of Work & Estimated Cost for Supplementry DPR State : HARYANA District : Rewari S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) Sub-Total (New LT Overhead Line) 1 4.038 Reconductoring of existing LT Overhead line 8 Bawal Raccoon (75sqmm) 3Ph-N (4W) Kms. 5.2 4.038 20.9976 Sub-Total (Reconductoring of existing LT Overhead line) 5.2 20.9976 Total (C.Sansad Adarsh Gram Yozna) 147.14012 E.Metering LT Metering(Shifting of Meter) 1 Bawal Total Requirement of shifting of meters outside(1-Ph Domestic Nos. 1000 0.0064 6.4 and Commercial Meters) Total Requirement of shifting of meters outside(3-Ph Domestic Nos. 195 0.0143 2.7885 and Commercial Meters) 2 Jatusana Total Requirement of shifting of meters outside(1-Ph Domestic Nos. 1000 0.0064 6.4 and Commercial Meters) Total Requirement of shifting of meters outside(3-Ph Domestic Nos. 15 0.0143 0.2145 and Commercial Meters) 3 Khol At Rewari Total Requirement of shifting of meters outside(1-Ph Domestic Nos. 1000 0.0064 6.4 and Commercial Meters) Total Requirement of shifting of meters outside(3-Ph Domestic Nos. 26 0.0143 0.3718 and Commercial Meters) 4 Nahar (P) Total Requirement of shifting of meters outside(1-Ph Domestic Nos. 1300 0.0064 8.32 and Commercial Meters) Total Requirement of shifting of meters outside(3-Ph Domestic Nos. 75 0.0143 1.0725 and Commercial Meters) 5 Rewari Total Requirement of shifting of meters outside(1-Ph Domestic Nos. 2000 0.0064 12.8 and Commercial Meters) Total Requirement of shifting of meters outside(3-Ph Domestic Nos. 227 0.0143 3.2461 and Commercial Meters) Sub-Total (LT Metering(Shifting of Meter)) 6838 48.0134 Page 5 of 166 28/12/2015 (AS PER SUPLEMENTRY DPR) A(VI) Abstract : Scope of Work & Estimated Cost for Supplementry DPR State : HARYANA District : Rewari S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) Total (E.Metering) 48.0134 F.System Strengthening 11 KV or 22 KV Line Augmentation 1 132 KV Buroli-11 KV Aulant AP Control Points Nos. 1 0.072 0.072 Poles Nos. 10 0.0252 0.252 2 132 KV Buroli-11 KV Aulant AP(WATER Raccon-80 sqmm. Kms. 4.5 4.038 18.171 SUPPLY T OFF To 63 KVA GHISA RAM) 3 132 KV Kosli-Gudiyani DS Control Points Nos. 2 0.072 0.144 Poles Nos. 55 0.0252 1.386 4 132 KV Kosli-Gudiyani DS(132 KV KOSLI To Raccon-80 sqmm. Kms. 2 4.038 8.076 NATHERA) 5 132 KV Kosli-Gudiyani DS(NATHERA To Raccon-80 sqmm. Kms. 6 4.038 24.228 KANHARWAS) 6 132 KV Kosli-Jhall DS Control Points Nos. 1 0.072 0.072 Poles Nos. 7 0.0252 0.1764 7 132 KV Kosli-Jhall DS(132 KV KOSLI To DHANI Raccon-80 sqmm. Kms. 2 4.038 8.076 SUDHRANA) 8 132 KV Kosli-Kosli DS Control Points Nos. 1 0.072 0.072 Poles Nos. 40 0.0252 1.008 9 132 KV Kosli-Kosli DS(132 kv kosli To village Raccon-80 sqmm. Kms. 5 4.038 20.19 chawwa) 10 132 KV Old Bawal-Pawati AP Control Points Nos. 3 0.072 0.216 Poles Nos. 58 0.0252 1.4616 11 132 KV Old Bawal-Pawati AP(BANDH WALA To Raccon-80 sqmm. Kms. 4.5 4.038 18.171 UJJAR KHERI) Page 6 of 166 28/12/2015 (AS PER SUPLEMENTRY DPR) A(VI) Abstract : Scope of Work & Estimated Cost for Supplementry DPR State : HARYANA District : Rewari S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) 12 132 KV Old Bawal-Pawati AP(KHERI DALU Raccon-80 sqmm.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    169 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us