Meeting Presentation (PDF)

Meeting Presentation (PDF)

METRO Green Line Extension Eden Prairie Construction Town Hall James Mockovciak, Community Outreach Coordinator March 1, 2021 1 November 2018 Project Groundbreaking! 2 Today’s Topics • Project Overview • 2020 Construction Recap • 2021 Construction Overview • Communications and Outreach Update 3 Project Overview 4 METRO Green Line Extension • 14.5 miles • 16 stations • Will provide single seat trips to downtown Minneapolis, U of M and St. Paul • Connections to the Airport and Mall of America via the Blue Line 5 2020 Construction Recap 6 Southwest Station Area 7 Southwest Station Looking east: pile supports for bus loop Looking west: construction of station waiting area and track foundation 8 SouthWest Station 9 SouthWest Station 10 SouthWest Station 11 Prairie Center Drive Bridge Area .· y. v - ... IJi!Ss TYPICAL SECTION TYPICAL SECTION AT LAND BRIDGE AT BRIDGE JUNE 2017 12 Prairie Center Drive Bridge 13 Prairie Center Drive Bridge: Pier Artwork 14 Eden Prairie Town Center Station Area -: - -''='·:;rL ---- TYPICAL SECTION TYPICAL SECTIONAT GRADE AT BRIDGE JUNE 2017 3 15 Eden Prairie Town Center Station 16 Eden Prairie Town Center Station 17 Eden Prairie Town Center Station 18 Town Center Place 19 Flying Cloud Drive 20 Valley View Bridge Area 1 I jY·, TYPICAL SECTION AT TYPICAL SECTION - - -"tJr '.-- J 4 _ ,:r:- - -- • 21 LRT Bridge at Valley View Road 22 Nine Mile Creek Bridge 23 Golden Triangle Station Area L I 24 Golden Triangle Station 25 Golden Triangle Station 26 TH212/Shady Oak Road/City West Area • 27 LRT Bridge at TH212/Shady Oak Road Bridge piers: looking southeast towards Shop HQ and at right looking northwest towards Shady Oak/Highway 212 28 City West Station 29 Hwy 62 Tunnel Construction 30 2021 Construction Overview 31 Eden Prairie: 2021 Construction Highlights • SouthWest Station area piling and station/parking ramp construction • The following bridges have deck work and/or finishing details (piling has concluded): . Prairie Center Drive LRT bridge . I-494 LRT bridge . Valley View Road LRT bridge . Nine Mile Creek LRT bridge • Advance Eden Prairie Town Center Station • Complete Phase 3 & 4 roadway and LRT construction on Flying Cloud Drive 32 Eden Prairie: 2021 Construction Highlights • Advance Golden Triangle station • Advance Shady Oak/Hwy 212 LRT bridge • Advance retaining walls at City West Station • Work on the south segment of Highway 62 LRT tunnel • Install LRT track beginning at the west end 33 Eden Prairie: 2021 Construction Highlights 34 Communications & Outreach Update 35 2020 Construction Communications • Construction updates: 16,600+ subscribers; 46% open rate • 24-hour construction hotline: 45 calls from Eden Prairie residents • Hundreds more non-hotline calls and emails from community members to outreach staff • Construction Information Workgroup: 8 meetings 36 Contact us • Construction Hotline: 612-373-3933 • James Mockovciak, Community Outreach Coordinator . Email: [email protected] . Telephone: 612-508-0567 37 Stay Updated! Online: SWLRT.org Twitter: @SouthwestLRT Facebook: @MetropolitanCouncil Instagram: @southwest_lrt 38.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    38 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us