ASSO Projects Participation

ASSO Projects Participation

ASSO Projects Participation Laying Year No Project Name Cable Type Contractor Owner Service Provided Trenching Jetting Mattresses CIS WD Length 1986 K2 Lefkada - Kefalonia (Greece) Power 4x150KV Les Cable De PPC Landing - Offshore Protection 6000m @ 1.0 and 30m Lyon 0.5m 1986 K3 Salamina - Perama (Greece) Power 4x150KV Les Cable De PPC Landing - Offshore Protection 4500m @ 1.0 and 30m Lyon 0.5m 1993 K13 Evia - Andros - Tinos (Greece) Power 4x150KV Alcatel Cable - PPC Landing - Offshore Protection 3600m @ 1.0 and 3600m 30m Pirelli Cavi 0.5m 1993 K13 Syros - Tinos - Mykonos (Greece) Power 2x66KV Alcatel Cable - PPC Landing - Offshore Protection 1650m @ 1.0 and 1650m 30m Pirelli Cavi 0.5m 1994 K59 Igoumenitsa - Kryonery - Corfu (Greece) Fiber Optic Fulgor OTE Landing - Offshore Protection 5000m @ 1.0m 30m 1995 K25 Morocco - Spain I - Phase I Power 4x150KV Alcatel Morocco Power Corp. Shore Approach Pipe Conduit 400m @ 1.0m 5m Contracting - Installation 1996 K122 Italy - Greece (Otranto - Corfu) Fiber Optic Maristel - Pirelli OTE Landing - Offshore Protection 225m @ 2.0m 225m 40m Cavi 1996 K33 Minos Project - Chania (Greece) Fiber Optic Fulgor OTE Landing - Offshore Protection 1170m @ 1.5m 20m 1996 K37 Preveza - Corfu (Greece) Fiber Optic Fulgor OTE Landing - Offshore Protection 6500m @ 1.0m 20m 1996 K52 Zakynthos - Kefalonia (Greece) Power 4x150KV Assodivers PPC Offshore Protection 4000m @ 1.0m 75m 1997 K25 Morocco - Spain I - Phase II Power 3x400KV & 2 FO bundled Alcatel Morocco Power Corp. Landing - Onshore and Offshore 1600m @ 1.0m 4400m 2400m 30m Contracting - Protection 1997 K81 Java - Bali I (Indonesia) Power 4x150KV & 1 FO bundled Pirelli Cavi e PLN Landing - Offshore Protection 2220m @ 1.5 and 800m 575m 20m Sistemi 0.5m 1998 K92 Lefkada - Meganis - Mytilini - Lesbos (Greece) Fiber Optic Assodivers OTE Landing - Offshore Protection 595m @ 1.0m 20m 1998 K72 Preveza - Lefkada, Kefalonia - Fiber Optic Fulgor OTE Landing - Offshore Protection 6300m @ 1.0m 20m Zakynthos, Lehaina - Kyllini (Greece) 1998 K72 Mykonos - Naxos, Paros - Ios, Fiber Optic Fulgor OTE Landing - Offshore Protection 31600m @ 2.0 and 20m Thira - Iraklion (Greece) 1.0m 1998 K58 Aktio - Preveza, Achladi - Evia (Greece) Power 150KV NKT Cables PPC Landing - Offshore Protection 2165m @ 1.6m and 30m 1.1m 1998 K64B Corfu - Bar (Yugoslavia) Fiber Optic Sirti OTE Landing - Offshore Protection 400m @ 1.0m 40m 1999 K88 Magnesia - Skiathos, Fiber Optic Alcatel Cable OTE Landing - Offshore Protection 6000m @ 2.0 and 20m Skopelos - Skyros - Lesbos (Greece) Hellas 1.0m 1999 K88 Lavrion - Syros - Paros (Greece) Fiber Optic Siemens OTE Landing - Offshore Protection 2230m @ 2.0 and 20m 1.0m 1999 K106 Java - Bali II (Indonesia) Power 2x150KV Pirelli Cables PLN Landing - Offshore Protection 6000m @ 1.0 and 500m 40m and System 0.5m 1999 K93 Rio - Antirio (Greece) Power 150KV NKT Cables PPC Landing - Offshore Protection 1680m @ 1.0 and 30m 0.5m 1999 K89 Italy - Greece Power 400 KVDC Pirelli Cavi e Enel / Terna Landing - Offshore Protection 155m @ 2.5 and 850m 25m Sistemi 1.5m 2000 K80 Alexandroupoli - Samothraki (Greece) Power 20 KV Alcatel PPC Landing - Offshore Protection 600m @ 1.0 and 30m 0.6m 2000 K80 Paros - Ios (Greece) Power 20 KV Fulgor PPC Landing - Offshore Protection 700m @ 1.0 and 30m 0.6m Revision: 23| DM No: 1253342 | Date: 03/07/2019 1 of 5 ASSO Projects Participation Laying Year No Project Name Cable Type Contractor Owner Service Provided Trenching Jetting Mattresses CIS WD Length 2001 K117 Rio - Antirio (Greece) Power 20 KV Assodivers Koinopraxia Gefyra Laying - Landing - Offshore Protection 2000m 1680m @ 1.0 and 70m 0.5m 2001 K99 Elafonisos - Kythira (Greece) Power 20 KV Assodivers PPC Laying - Landing - Offshore Protection 10000m 450m @ 1.0m 300m 300m 2001 K131 Med Nautilus Seg 1 and 2 - Chania (Greece) Fiber Optic Elettra Med Nautilus Landing - Offshore Protection 1055m @ 1.0m 15m 2001 K133 Zakynthos - Kyllini (Greece) Power 4x150KV Pirelli Cavi e PPC Landing - Offshore Protection 10150m @ 2.0m 30m Sistemi - Nexans 2002 K122 Italy - Greece Fiber Optic Pirelli Cavi e Enel / Terna Landing - Offshore Protection 145m @ 2.0 and 143m 143m 25m Sistemi 1.3m 2002 K111 Isle of Man (England) Power 3x90KV & 1 FO bundled Pirelli Cavi e Manxcable Offshore Protection 2300m @ 1.0m 600m 15m Sistemi Energia 2002 K143 Lombard - Vravrona - Chania (Greece) Fiber Optic Elettra Med Nautilus Landing - Offshore Protection 2155m @ 2.0 and 900m 20m 1.5m 2002 K149 Hpeirotiki Akti - Paxoi (Greece) Power 20 KV Assodivers PPC Offshore Protection 5200m @ 1.0m 50m 2002 K151 Evia - Andros (Greece) Power 150KV Assodivers PPC Offshore Protection 600m @ 1.0 and 120m 0.6m 2003 K154 Skiathos (Greece) Power 150KV Assodivers PPC Offshore Protection 2540m @ 1.0m 60m 2003 K118 Samos - Patmos, Kerkyra - Plataria (Greece) Fiber Optic Fulgor OTE Landing - Offshore Protection 2200m @ 1.0m 20m 2004 K171 Greece - Western Europe (Gwen) Fiber Optic Alcatel OTE Landing - Offshore Protection 1360m @ 1.0m 20m Submarine 2004 K169 Pilio - Skiathos (Greece) Power 20KV Assodivers PPC Landing - Offshore Protection 905m @ 0.5m 20m 2004 K158 Evia - Kavaliani (Greece) Power 20 KV Assodivers PPC Laying - Landing - Offshore Protection 1300m 1300m @ 1.0m 20m 2004 K186 Pilio - Skiathos (Greece) Power 20KV Fulgor PPC Laying - Landing - Offshore Protection 5590m 865m @ 1.5m 20m 2004 K172 Paros - Naxos (Greece) Power 20KV Fulgor PPC Landing - Offshore Protection 10400m @ 1.0 and 20m 0.6m 2004 K137 Basslink (Australia) Power 2x400KVDC & 1 FO bundled Pirelli Cavi e Basslink Pty Offshore Protection 54635m @ 0.5m 80m Sistemi Energia 2005 K208 Aitoliko (Greece) Power 20 KV Assodivers PPC Laying - Landing - Offshore Protection 800m 800m @ 1.0m 10m 2005 K139 Elafonisos - Kythira (Greece) Power 20 KV Assodivers PPC Offshore Protection 3000m @ 0.6m 20m 2005 K206 Morocco - Spain II Power 3x400KV & 2 FO bundled Pirelli Cavi - Red Electrica Espana Landing - Onshore and Offshore 1050m @ 1.0m 4980m 4320m 20m Nexans Norway Protection 2006 K183 Corfu - Mainland (Greece) Power 4x150KV & 2 FO bundled Nexans Norway PPC Landing - Offshore Protection 26960m @ 1.0m 1000m @ 2.0m 20m 2006 K224 Attica - Milos - Chania (Greece) Fiber Optic NSW OTE Landing - Offshore Protection 4000m @ 1.0 and 20m 2.2m 2007 K235 Rathlin (Ireland) Power 33KV Prysmian Cavi e Northen Ireland Electricity Offshore Protection 11815m @ 1.0m 105m Sistemi Energia 2007 K212 Adones (Angola) Fiber Optic Elettra Angola Telecom Landing - Offshore Protection 43790m @ 2.0m 10m Revision: 23| DM No: 1253342 | Date: 03/07/2019 2 of 5 ASSO Projects Participation Laying Year No Project Name Cable Type Contractor Owner Service Provided Trenching Jetting Mattresses CIS WD Length 2007 K273 Attica - Syros ( Greece) Fiber Optic NSW Hellas OnLine Landing - Offshore Protection 6000m @ 1.5 and 15m 1.0m 2007 K273 Chania - Nafplio (Greece) Fiber Optic NSW Tellas Landing - Offshore Protection 5500m @ 1.5 and 15m 1.0m 2008 K241 Kalymnos - Kos (Greece) Power 20 KV Fulgor PPC Laying - Landing - Offshore Protection 32000m 5200m @ 2.0 and 45m 0.5m 2008 K217 Sapei - Phase 1 (Italy) Power 500KV HVDC & 2 bundled Prysmian Cavi e Terna Offshore Protection 53725m @ 0.5m 194685m @ 1.0m 680m Electrodes Sistemi Energia 2008 K209 GCCI Project (Saudi Arabia - Bahrain) Power 6x400KV & 2 FO bundled Prysmian Cavi - GCCIA Landing - Offshore Protection 130580m @ 0.6m 114770m @ 1.0m 25m Nexans Norway Artemis - Marmari, Kasos - Karpathos, Kos - 2009 K272 Nisiros, Pefkochori - Neos Marmaras, Trikeri - Fiber Optic Assodivers OTE Landing – Near shore Cable Burial 14000m 14810m @ 1.5m 45m Pteleos, Evia-Andros-Tinos-Mykonos, Spetses - Kosta, Hydra - Metochi (Greece) 2010 K326 Sapei - Phase 2 (Italy) Power 500KV HVDC Assodivers Terna Offshore Protection 47360m @ 0.5m 165000m @ 1.0m 680m 2010 K282 Kahramaa Project - Phase I (Doha, Qatar) Power 3x220KV XLP AC & 1 FO bundled Prysmian Cavi e KAHRA MAA Cable Transportation - Installation - 21000m 13200m @ 1.0m 8530m @ 1.0m 12m Sistemi Energia Protection 2011 K237 Cometa Project (Spanish Peninsula-Mallorca) Power 2x250KV HVDC & an MR Prysmian Cavi - Red Electrica Espana Offshore Protection 37025m @ 1.0m and 1925m 125m bundled wth a FO Nexans Norway 0.5m 2011 K282 Kahramaa Project - Phase II (Doha, Qatar) Power 3x220KV XLP AC & 1 FO bundled Prysmian Cavi e KAHRA MAA Cable Transportation - Installation - 21000m 13200m @ 1.0m 8530m @ 1.0m 160m 12m Sistemi Energia Protection 2011 K293 Messina II Project - Circuit I - 1st Campaign Power 3x380KV HVAC & 2 FO bundled Prysmian Terna Offshore Protection 43000m @ 1.0m 375m (Italy-Sicily) PowerLink Srl Prysmian Cable Transportation - Simultaneous 20290m @1.5m 2012 K290 HelWin 1 Grid Connections (Germany) Power 2x250KV HVDC & 1 FO bundled TenneT 67425m 25m PowerLink Srl Laying/Burial 445m @ 1.55m 46690m @ 1.7m 2012 K372 Aegina - Methana / Thasos - Keramoti Power 2 x 20KV Fulgor PPC Cable Transportation - Installation - 17865m 1730m @ 1.0m 105m (Greece) Protection 2012 K290 BorWin 2 HVAC - 1st Cable (Germany) Power 1x155KV HVAC Prysmian TenneT Cable Transportation - Simultaneous 30620m 28100m @1.55m 40m PowerLink Srl Laying/Burial 2012 K293 Messina II Project - Circuit I - 2nd Campaign Power 3x380KV HVAC & 2 FO bundled Prysmian Terna Offshore Protection 2550m @0.5m 82000m @ 1.0m 800m 375m (Italy-Sicily) PowerLink Srl 2013 K293 Messina II Project - Circuit 2 - (Italy- Sicily) Power 3x380KV HVAC & 2 FO bundled Prysmian Terna Offshore Protection 4600m @ 0.5m 130790m @ 1.0m 1450m 375m PowerLink Srl 2013 K267 Attica - Evia Project (Greece) Power

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us