Land Identified in Kannauj Forest Division and Showing on Topo Sheet

Land Identified in Kannauj Forest Division and Showing on Topo Sheet

Land Identified in Kannauj Forest Division and Showing on Topo Sheet "For Compensatory Afforestation in lieu of Protected Forest Land Proposed for Diversion in Kannauj Forest Division for " Construction of Aligarh to Kanpur Section of NH-91 at km 289.000 to km 356.000 in the state of Uttarpradesh" Kannauj Forest Division 6 2a 1 Legend Compensatory Afforestation Location Location Area (1) Adampur Forest Block-1 = 04.000 hectare (Chhibramau Forest Range) (2a) Adampur Forest Block-2 = 01.800 hectare (Chhibramau Forest Range) (6) Sharifabad Forest Block = 15.656 hectare (Chhibramau Forest Range) Sheet-01 Land Identified in Kannauj Forest Division and Showing on Topo Sheet "For Compensatory Afforestation in lieu of Protected Forest Land Proposed for Diversion in Kannauj Forest Division for " Construction of Aligarh to Kanpur Section of NH-91 at km 289.000 to km 356.000 in the state of Uttarpradesh" Kannauj Forest Division 5 2b 3 4 Legend Compensatory Afforestation Location Location Area (2b) Adampur Forest Block-1 = 03.200 hectare (Chhibramau Forest Range) (3) Banganwa Forest Block-1 = 08.000 hectare (Chhibramau Forest Range) (4) Banganwa Forest Block-2 = 02.000 hectare (Chhibramau Forest Range) (5) Kansuaa Forest Block = 44.000 hectare (Chhibramau Forest Range) Sheet-02 Land Identified in Etawah Forest Division and Showing on Topo Sheet "For Compensatory Afforestation in lieu of Protected Forest Land Proposed for Diversion in kannauj Forest Division for " Construction of Aligarh to Kanpur Section of NH-91 at km 289.000 to km 356.000 in the state of Uttarpradesh" Etawah Forest Division 1a Legend Compensatory Afforestation Location Location Area (1a) Bhaguati Nagla Kachar = 18.5 hectare (Badhapura Forest Range) Sheet-01 Land Identified in Etawah Forest Division and Showing on Topo Sheet "For Compensatory Afforestation in lieu of Protected Forest Land Proposed for Diversion in kannauj Forest Division for " Construction of Aligarh to Kanpur Section of NH-91 at km 289.000 to km 356.000 in the state of Uttarpradesh" Etawah Forest Division 1b 2 Legend Compensatory Afforestation Location Location Area (1b) Bhaguati Nagla Kachar = 21.5 hectare (Badhapura Forest Range) (2) Kamet = 40.0 hectare (Badhapura Forest Range) Sheet-02 Land Identified in Etawah Forest Division and Showing on Topo Sheet "For Compensatory Afforestation in lieu of Protected Forest Land Proposed for Diversion in kannauj Forest Division for " Construction of Aligarh to Kanpur Section of NH-91 at km 289.000 to km 356.000 in the state of Uttarpradesh" Etawah Forest Division 3 Legend Compensatory Afforestation Location Location Area (3) Jarhouli = 40.0 hectare (Badhapura Forest Range) Sheet-03.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us