RPP-SPEC-60023 Rev.07 2/14/2018 - 2:57 PM 1 of 317 Release Stamp DOCUMENT RELEASE AND CHANGE FORM Prepared For the U.S. Department of Energy, Assistant Secretary for Environmental Management By Washington River Protection Solutions, LLC., PO Box 850, Richland, WA 99352 Contractor For U.S. Department of Energy, Office of River Protection, under Contract DE-AC27-08RV14800 TRADEMARK DISCLAIMER: Reference herein to any specific commercial product, process, or service by trade name, trademark, DATE: manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof or its contractors or subcontractors. Printed in the United States of America. 1. Doc No: RPP-SPEC-60023 Rev. 07 Feb 14, 2018 2. Title: Construction Specification for A/AX-Farm Waste Retrieval Project 3. Project Number: ☐ N/A 4. Design Verification Required: T2R02 ☐ Yes ☒ No 5. USQ Number: ☒ N/A 6. PrHA Number Rev. ☐ N/A Clearance Review Restriction Type: N/A-8 PRHA-02038 00 public PRHA-02039 00 PRHA-02040 00 PRHA-02041 00 PRHA-02042 00 PRHA-02043 00 PRHA-02044 00 PRHA-02045 00 FORFO PRHA-02046 00 OORPRHA-02047P 00 7. Approvals TitleR NameNam Signature Date Clearance ReviewAAA AARDAL,DALDA JANIS D AARDAL, JANIS D 02/14/2018 Design Authority WITHERSPOON,INFORMATONINTHERSPTHERS JP P WITHERSPOON, JP P 02/14/2018 Checker HAGENSEN,AGENSEN,NF ALAN R HAGENSEN, ALAN R 02/14/2018 Document Control Approval HOOD,OD,, EVAN HOOD, EVAN 02/14/2018 Originator QUAM, PAULFO R QUAM, PAUL R 02/14/2018 Other Approver DAHL, MEGANEGANOORAN M DAHL, MEGAN M 02/14/2018 Other Approver SNYDER, JOSHUAOSHUASHUA J SNYDER, JOSHUA J 02/14/2018 Other Approver BRYDEN, MICHAELHAELAELRM J BRYDEN, MICHAEL J 02/14/2018 Other Approver NELSON, RICK E NELSON, RICK E 02/14/2018 PrHA Lead SMITH, RYAN D MA SMITH, RYAN D 02/14/2018 Responsible Engineering Manager HANSON, CARL E HANSON, CARL E 02/14/2018 USQ Evaluator SMITH, RYAN D AT SMITH, RYAN D 02/14/2018 8. Description of Change and Justification TO Problem: RPP-SPEC-60023 Cathodic Protection for Underground and Submerged Pipingping (13 447 13.13) specifies the use of the pin brazing method to mechanically connect conductors to old and new pipelines. The associated drawings specify theth use of exothermic or "cadwelds" to attach conductors to the pipelines. Similarly, the cathodic protection DA prefers the use of exothermic welds.ds.s. In additaddaddition, details regarding the anode junction boxes were unclear. Solution: Remove reference to pin brazing for conductor to pipeline attachments, and replace withONLYh exothermicexothermexother weld instructions and specifications. Update anode junction box specifications. Testing/Analysis: Exothermic welds have been used to connect cathodic protection conductors to pipelinesnes for manmany years on site. The exothermic weld methodology and execution is well understood and adequate for use. Other minor changes on this revision that do not require testing or analysis include the following: * Sections 40 05 13 and 40 24 10: Clarified piping section by adding Paragraph 3.2.F.8 (and Paragraph 3.2.F.9, respectively) to specify 2-hole position flange orientation. * Section 40 05 13: Clarified Fittings specification in Paragraph 3.5.B Components List to include ASTM A403 for butt weld fittings. * Section 09 91 00: Sherwin Williams has replaced Zinc Clad II with Zinc Clad IV as an equivalent product. * Section 31 23 00: Clarified backfill section to specifically require the preparation of a backfill permit. At Paragraphs 3.7, 3.8, 3.9, and 3.10 added a statement to say that the subcontractor shall prepare the backfill permit and obtain approval prior to commencing. * Throughout: Correct the paragraph number references to the 2016 revision of ACI 301. * Section 40 42 00: Removed the unnecessary requirement in Paragraph 2.2.B.2 that roll jacketing be in compliance with ASTM 1767. * Section 05 50 00: Add additional torques for larger sizes to table in Paragraph 3.3.D. Note - This revision does not modify any sections in which the PE stamp applies to. The stamp on record in revision 4 is still valid. Design checks were performed in accordance with ARES Quality Assurance Procedures (QAP). Because of the nature of the change a graded approach was applied and design verification was not performed as allowed by ARES QAP 3.5, Design Verification. 9. TBDs or Holds ☒ N/A 1 SPF-001 (Rev.D1) RPP-SPEC-60023 Rev.07 2/14/2018 - 2:57 PM 2 of 317 DOCUMENT RELEASE AND CHANGE FORM Doc No: RPP-SPEC-60023 Rev. 07 10. Related Structures, Systems, and Components a. Related Building/Facilities ☐ N/A b. Related Systems ☐ N/A c. Related Equipment ID Nos. (EIN) ☐ N/A 241-A 241-EDS A285-PA-V-049 241-A-285 241-PA A285-RW-BFP-001 241-AX 241-RC A285-RW-V-017 241-RW A285-RW-V-018 241-WT 11. Impacted Documents – Engineering ☒ N/A Document Number Rev. Title 12. Impacted Documents (Outside SPF): N/A 13. Related Documents ☐ N/A Document Number Rev. Title 58776-005-RFI-006 00 RFI - Lead Times: Aloyco Valves (Eng Review Nec, RPP-SPEC-60023 R3, DCN-TBD & Clarif Only) DCN-713162 00 Changeha Valve from Aloyco to Powell for A285 Water System RPP-CALC-60167 01241 241-AX-AXA Farm Buried & Above Grade Water and Chemical Piping ASME B31.3 and B31.9 Analysis RPP-CALC-60217 00FORFFO241 241-A-285-A-28 Air and Water Service Building ASME Piping Analysis TOC-MT-00070 00A OR and AXAX-Farm-Fa Infrastructure Upgrades and AX-Farm Retrieval Equipment Removal/Installation Design Support 14. Distribution R Name Organization ATKINS, LARRY BINFORMIIN CONSTRUCTION & COMMISSIONING BRYDEN, MICHAEL JNF C-FARM RETRIEVAL ENGRNG COOK, SHAUN M HOPKINS, GARY PFO R&C CONSTRUCTION HULL, KEVIN JOOR ELECTRICAL/AREA/242A-EVAP ENG PARKMAN, DAVID B MARS-BASED RETRIEVAL ENGRNG STEPHENS, RANDALL F RMATONRM WHITE, JEREMEY C PROJECTSP WORK PACKAGE PLANNING WIKSTRAND, CHRIS BMMA CONSTRUCTIONCON & COMMISSIONING WITHERSPOON, JP P A/AX RETRIEVALR ENGRNG ONLY 2 SPF-001 (Rev.D1) RPP-SPEC-60023 Rev.07 2/14/2018 - 2:57 PM 3 of 317 RPP-SPEC-60023 Revision 7 CONSTRUCTION SPECIFICATION FOR A/AX-FARMS WASTE RETRIEVAL PROJECT FOR Prepared by INFORMATON PR Quam Washington River Protection Solutions,lutions,utions, LLLLC Date Published February 2018 ONLY Prepared for the U.S. Department of Energy Office of River Protection Contract No. DE-AC27-08RV14800 Approved for Public Release; Further Dissemination Unlimited A-6007-231 (REV 0) RPP-SPEC-60023 Rev.07 2/14/2018 - 2:57 PM 4 of 317 RPP-SPEC-60023, Rev. 7 CONSTRUCTION SPECIFICATION FOR A/AX-FARMS WASTE RETRIEVAL PROJECT FOR February 2018 INFORMATON ppreparedrep by ARES CorporaCorporCorporation Energy Servicesvices DiviDivision 1100 Jadwin Avenue,nue, Suite 400 Richland, Washingtononn 99352 (509) 946-3300 ONLY prepared for Washington River Protection Solutions, LLC RPP-SPEC-60023 Rev.07 2/14/2018 - 2:57 PM 5 of 317 RPP-SPEC-60023, Rev. 7 TABLE OF CONTENTS No. of Section Pages Title Pages 2 Table of Contents 2 DIVISION 01 – GENERAL REQUIREMENTS Division 01 Sections are under separate cover – see WRPS Statement of Work (SOW) DIVISION 02 – EXISTING CONDITIONS Section 02 41 00 Demolition 3 DIVISION 03 – CONCRETEFORONCRE Section 03 15 00Post Post-Installedos - Concrete Anchor Bolts 3 Section 03 30 00 ConcreteConcretConcre 18 DIVISION 05 – METALS INFORMATON Section 05 50 00 Metal FabricationsFabricatio 8 Section 05 53 00 Metal Gratingstingsings 5 DIVISION 06 – WOOD, PLASTICS, AND COMPOSITESCO Section 06 10 00 Carpentry 10 DIVISION 07 – THERMAL AND MOISTUREE PROTECTIONPROT Section 07 92 00 Joint Sealants 5 DIVISION 09 – FINISHES Section 09 91 00 Painting 6 Section 09 96 00 High-Performance CoatingsONLY 7 DIVISION 13 – SPECIAL CONSTRUCTION Section 13 34 19 Metal Building Systems 39 Section 13 47 13.13 Cathodic Protection for Underground and Submergedgedge PPiping 10 DIVISION 22 – PLUMBING Section 22 15 00 Compressed Air Piping 10 DIVISION 23 – HVAC Section 23 31 01 Tank Ventilation Ducting 3 Section 23 31 13 Air Compressor Metal Ducts 4 ii RPP-SPEC-60023 Rev.07 2/14/2018 - 2:57 PM 6 of 317 RPP-SPEC-60023, Rev. 7 No. of Section Pages DIVISION 26 – ELECTRICAL Section 26 05 19 Low Voltage Electrical Power Conductors and Cables 15 Section 26 05 26 Grounding and Bonding for Electrical Systems 9 Section 26 05 29 Hangers and Supports for Electrical Systems 6 Section 26 05 33 Raceways and Boxes for Electrical Systems 14 Section 26 05 53 Identification for Electrical Systems 8 Section 26 10 00 Medium Voltage Electrical Distribution 12 Section 26 22 13 Low Voltage Distribution Transformers 5 Section 26 24 13 Switchboards 4 Section 26 24 16 Panelboards 5 Section 26 27 26FOR WiringW Devices 5 Section 26 28 16Enc Enclosed Switches and Circuit Breakers 4 Section 26 51 00Interior Lighting 3 Section 26 56 00ExteriorExterio Lighting 6 INFORMATON DIVISION 31 – EARTHWORKRK Section 31 23 00 Excavationon and FilFiFill 18 DIVISION 33 – UTILITIES Section 33 10 00 Water Utilities 15 DIVISION 40 – PROCESS INTEGRATION Section 40 05 13 Process Piping 17 Section 40 05 22 Hose-in-Hose Transfer Line SySSystemstem InIInstallation 8 Section 40 24 10 Chemical Piping 15 Section 40 41 00 Process Piping and Equipment Heatatt TracTracingngg 5 Section 40 42 00 Process Piping and Equipment InsulationionONLYn 7 iii RPP-SPEC-60023 Rev.07 2/14/2018 - 2:57 PM 7 of 317 RPP-SPEC-60023, Rev. 7 CERTIFICATION I certify that the indicated sections of this Specification were prepared by me or under my supervision and that I am a registered architect/professional engineer under the laws of the State of Washington.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages317 Page
-
File Size-