Traffic Impact Assessment Rio Tinto Rössing Uranium Limited

Traffic Impact Assessment Rio Tinto Rössing Uranium Limited

ANNEXURE N10: TRAFFIC STUDY BY BURMEISTER AND PARTNERS Traffic Impact Assessment Rio Tinto Rössing Uranium Limited FINAL REPORT MARCH 2010 Prepared by: 8 Eugene Marais Street PO Box 1496 Windhoek Namibia Tel: +264 61 379000 Fax: +264 61 379001 E-Mail: [email protected] TRAFFIC IMPACT ASSESSMENT: RIO TINTO RÖSSING URANIUM LIMITED MARCH 2010 Traffic Impact Assessment Rio Tinto Rössing Uranium Limited 1. EXECUTIVE SUMMARY .............................................................................................................................. 6 2. PURPOSE AND SCOPE .............................................................................................................................. 7 3. INTRODUCTION .......................................................................................................................................... 7 4. RURAL ROADS ........................................................................................................................................... 8 4.1 Existing rural road network ................................................................................................................. 8 4.2 Future rural road network ................................................................................................................... 9 4.3 Rural road maintenance ..................................................................................................................... 9 4.4 Traffic calming through towns ........................................................................................................... 10 4.5 Cost-recovery principles ................................................................................................................... 10 5. URBAN ROAD NETWORK ........................................................................................................................ 10 5.1 Urban road network planning principles ........................................................................................... 10 5.2 Walvis Bay ........................................................................................................................................ 11 5.3 Swakopmund .................................................................................................................................... 11 6. TRAFFIC DATA .......................................................................................................................................... 12 6.1 Traffic counts .................................................................................................................................... 12 6.2 Traffic on the Rössing Uranium access road ................................................................................... 13 6.3 Traffic on the B2 ............................................................................................................................... 13 6.3.1 B2: Swakopmund–Usakos 13 6.3.2 B2: Walvis Bay–Swakopmund (Coastal road) 16 6.3.3 C34: Walvis Bay–Swakopmund (Road behind the dunes) 18 6.4 Traffic growth on the B2 ................................................................................................................... 18 6.4.1 Average daily traffic 19 6.4.2 Weekly and daily traffic distribution 21 6.5 Traffic growth: Rössing Uranium ...................................................................................................... 23 6.6 Collision report .................................................................................................................................. 24 7. CAPACITY ANALYSIS .............................................................................................................................. 24 7.1 Geometric harmonisation of intersections ........................................................................................ 25 7.2 Sidra analysis ................................................................................................................................... 25 7.3 Rössing Uranium/Arandis access from the B2 ................................................................................. 26 8. TRANSPORT SERVICE FOR STAFF ....................................................................................................... 28 8.1 The Rössing Uranium bus fleet ........................................................................................................ 28 8.2 Transport demand: New trip origins ................................................................................................. 29 8.3 Bus stop: Langstrand ........................................................................................................................ 30 8.4 General bus operational issues ........................................................................................................ 30 1/50 TRAFFIC IMPACT ASSESSMENT: RIO TINTO RÖSSING URANIUM LIMITED MARCH 2010 8.5 Rail as an alternative to the transport demand ................................................................................. 30 9. TRAFFIC GENERATED FROM NEW DEVELOPMENTS ......................................................................... 31 9.1 Areva/Uramin .................................................................................................................................... 31 9.2 Other 32 10. RAIL TRANSPORT .................................................................................................................................... 32 10.1 The current railway line .................................................................................................................... 32 10.2 Affected network ............................................................................................................................... 33 10.3 Transportation of sulphuric acid to Rössing Uranium ...................................................................... 33 10.4 The planned CIC railway line ............................................................................................................ 34 10.5 Upgrading of the Walvis Bay–Arandis railway line ........................................................................... 34 11. THE PORT OF WALVIS BAY .................................................................................................................... 34 11.1 Port Master Plan ............................................................................................................................... 34 11.2 Sulphuric acid: Storage and facilities ............................................................................................... 35 11.3 Future mines ..................................................................................................................................... 36 11.4 Acid plant .......................................................................................................................................... 36 12. TOTAL TRANSPORT APPROACH ........................................................................................................... 37 13. EMERGENCY RESPONSE AND EVACUATION ...................................................................................... 38 13.1 On site facilities ................................................................................................................................ 38 13.2 Regional Facilities ............................................................................................................................ 38 13.2.1 Hospitals 39 13.2.2 Emergency Vehicles 39 13.2.3 Evacuation facilities 39 14. STAKEHOLDER CONSULTATION ........................................................................................................... 40 15. ROAD SAFETY AUDIT .............................................................................................................................. 41 15.1 Audit reports ..................................................................................................................................... 41 15.1.1 Report A: Route B2 from Swakopmund to Arandis 41 15.1.2 Report B: Route B2 from Swakopmund to Walvis Bay 41 15.1.3 Report C: Arandis Town 41 15.1.4 Report D: Rössing Uranium Mine 41 15.1.5 Report E: Swakopmund Urban Area 41 15.2 Interpretation of Road Safety Audit Reports ..................................................................................... 42 15.2.1 Background 42 15.2.2 Findings 42 15.2.3 Conclusion 43 15.3 Actions required based on the findings of the Road Safety Audit .................................................... 43 15.3.1 Road and traffic management 44 15.3.2 Infrastructure upgrading and improvements 45 16. ROAD COMMITTEES ................................................................................................................................ 46 2/50 TRAFFIC IMPACT ASSESSMENT: RIO TINTO RÖSSING URANIUM LIMITED MARCH 2010 17. REGIONAL PLANNING ............................................................................................................................. 46 18. SUMMARY OF IMPACTS .......................................................................................................................... 46 19. ASSESSMENT OF RISK EXCEEDANCES ............................................................................................... 47 19.1 Road network.................................................................................................................................... 47 19.2 Transport

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    291 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us