Gallito Ciego Ingles

Gallito Ciego Ingles

Gallito Ciego Hidropower Plant FACTS Location: Yonán District, Contumazá Province, Cajamarca Region. Water source: Jequetepeque river basin Installed capacity: 34.00 MW Effective capacity: 38.14 MW Typo: Hydropower Annual output: 151 GWh Net head: 83 metros Gallito Ciego hydropower plant, operated by Statkraft Peru. Design flow: 40 m3/S Gallito Ciego is located 252 km to the north of the Cajamarca Equipment: Vertical shaft city and region. The plant is located at the foot of the Francis turbines, powerhouse, 2 Gallito Ciego dam, which is mainly used for irrigation activities generation units in the agricultural area of the Jequetepeque valley. The Construction: Completed in dam is not owned by Statkraft Peru, but administered by 1997 the competent authorities. Operation: Since november 1997 The plant reservoir, which regulates the water flow Gallito Ciego started operations in 1977, that is discharged back to the river, is supplying energy to company Cementos located downstream of the powerhouse Pacasmayo. Subsequently, the company was to permit the activities in the lower basin incorporated as Cementos Norte Pacasmayo to continue. Consequently, the dispatch Energía S.A., owned by mining company takes into consideration the water Hoschild. In 2000, all of its power generation demand required for agricultural assets were sold to the Vattenfall group, activities in the Jequetepeque river which conducted commercial operations in valley. the National Interconnected Electrical System. In 2003, SN Power Peru acquired Corporate Responsibility the hydropower plant. Finally, in 2014, Statkraft Peru execute corporate Statkrat, main shareholder of SN Power Peru, responsibility programs regarding the took possession of its assets and operations, building of capacities and educational and the plant became property of Statkraft competences in the schools within the Peru. area of influence of the hydropower plant. Additionally, environmental Operation controls are conducted through the Updated: May 2015 The plant is operated remotely from the environmental monitoring program and dispatch center in Lima. A compensation solid waste integral management. STATKRAFT PERU S.A. Phone: +511 7008100 www.statkraft.com.pe.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us