New Train Services

New Train Services

New Train Services SN Train No. w.e.f. 55613/55614 Dekargaon- 1 07-04-2014 Nahalagun Passenger 15617/15618 Guwahati – 2 20-02-2015 Naharlagun Intercity Express 22411/22412 Naharlagun - New 3 20-02-2015 Delhi AC Express 12087/12088 Guwahati - 4 07-05-2017 Naharlagun Shatabdi Express 55895/55896 Rangia – 5 07-10-2016 Murkongselek Passenger 75909/75910 Dibrugarh Town – 6 08-10-2016 Dangri DEMU 15613/15614 Kamakhya – 7 10-08-2015 Mukongselek Intercity Express LAKHIMPUR Ongoing projects PARLIAMENTARY CONSTITUENCY • Mukongselek-Pasighat (26.15Kms) new line, Assembly Segments ` 450 crore • Bogibil Rail cum Road Bridge Project at cost of Majuli Jonai ` 5000 crore Naoboicha Chabua New Survey Lakhimpur Doom Dooma • Dangri- Roing (60 kms) Dhakuakhana Sadiya • Dumduma – Wakro via Simaluguri, Namsai, Dhemaji Chowkham (96 kms) • Harmuti – Majuli (38 Kms) Works completed in Last Four Years • Pasighat- Tezu – Rupai (227 kms) • Harmuti- North Lakhimpur Gauge Conversation • North Lakhimpur – Bame (Along)- Silapathar completed on 14th January, 2014 (249 kms) • Sripani- Murkongselek Gauge Conversation Digital India work completed on 10th August, 2015 • North Lakhimpur Sripani Gauge Conversation • Point of Sale (POS) machine provided at work completed on 10th August, 2015 Dhemaji, Harmuti, Murkongselek, North Lakhimpur, Silapathar • Harmuti- Naharlagun New line project (21.75 kms) completed on 29th March, 2014 & Railway Electriϐication passenger train service started from 7th April, 2014 It has been decided to electrify the entire railway network in India. Works for electriication of the Improvements in Passenger Amenities railway tracks from Raninagar Jalpaiguri to Rangiya • 29 no. of Unmanned Level Crossing gates have and Agyathori via New Bongaigaon and on the south been eliminated to ensure safety bank of river Brahmaputra up to Dibrugarh via Goalpara and Guwahati are under progress. Soon, • Balipara – Bhalukpong section were successfully works for electriication of railway tracks from Rangiya converted to the Broad Gauge system from to Murkongselek via Harmuti on the north bank of river Meter Gauge Brahmaputra will be taken up • New Waiting Hall constructed at Harmuti and North Lakhimpur • Unreserved Ticketing System working at the following station: Baginadi, Lilabari, Gogamukh, Bordoloni, Dhemaji, Silapathar, Telem, Murkong Selek, Sripani, Archipathar, Laimekuri and Simen Chapari.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us