Hornsea Project Three Offshore Wind Farm Preliminary Environmental

Hornsea Project Three Offshore Wind Farm Preliminary Environmental

Hornsea Project Three Offshore Wind Farm Hornsea Project Three Offshore Wind Farm Preliminary Environmental Information Report: Chapter 1 – Geology and Ground Conditions (Part 1) Date: July 2017 Chapter 1 – Geology and Ground Conditions Preliminary Environmental Information Report July 2017 Environmental Impact Assessment Preliminary Environmental Information Report Liability Volume 3 Chapter 1: Geology and Ground Conditions This report has been prepared by RPS, with all reasonable skill, care and diligence within the terms of their contracts with DONG Energy Power (UK) Ltd. Report Number: P6.3.1 Version: Final Date: July 2017 This report is also downloadable from the Hornsea Project Three offshore wind farm website at: www.dongenergy.co.uk/hornseaproject3 DONG Energy Power (UK) Ltd. 5 Howick Place, Prepared by: RPS London, SW1P 1WG Checked by: Tracey Siddle, Jennifer Brack, and Kieran Bell. © DONG Energy Power (UK) Ltd, 2017 All rights reserved Accepted by: Sophie Banham Front cover picture: Kite surfer near one of DONG Energy's UK offshore wind farms © DONG Energy Hornsea Approved by: Stuart Livesey Project Three (UK) Ltd., 2016. i Chapter 1 – Geology and Ground Conditions Preliminary Environmental Information Report July 2017 Table of Contents Table 1.16: Summary of potential environment effects, mitigation and monitoring. ............................................... 52 1. Geology and Ground Conditions .......................................................................................................................... 1 1.1 Introduction .................................................................................................................................................. 1 List of Figures 1.2 Purpose of this chapter ................................................................................................................................ 1 1.3 Study area ................................................................................................................................................... 1 Figure 1.1: Hornsea Three geology and ground conditions study area. ................................................................. 3 1.4 Planning policy context ................................................................................................................................ 2 Figure 1.2: Designated geological sites. ............................................................................................................... 10 Figure 1.3: Mineral extraction sites and mineral safeguarding areas. ................................................................... 12 1.5 Consultation ................................................................................................................................................. 6 Figure 1.4: Source Protection Zones. ................................................................................................................... 25 1.6 Methodology to inform the baseline ............................................................................................................. 8 1.7 Baseline environment .................................................................................................................................. 8 1.8 Key parameters for assessment ................................................................................................................ 32 List of Annexes 1.9 Impact assessment criteria (see Part 2 of this document) ......................................................................... 36 1.10 Assessment of significance (see Part 2 of this document) ......................................................................... 37 Annex 1.1: Borehole Logs 1.11 Cumulative Effect Assessment Methodology (see Part 2 of this document) .............................................. 43 Annex 1.2: Abstraction Licences Annex 1.3: Environment Agency Discharge Consents and Permits 1.12 Cumulative Effect Assessment (see Part 2 of this document) ................................................................... 46 1.13 Transboundary effects(see Part 2 of this document) ................................................................................. 50 1.14 Inter-related effects (see Part 2 of this document) ..................................................................................... 50 1.15 Conclusion and summary (see Part 2 of this document) ........................................................................... 50 1.16 Next Steps (see Part 2 of this document) .................................................................................................. 51 1.17 References (see Part 2 of this document) ................................................................................................. 54 List of Tables Table 1.1: Summary of NPS EN-1 and EN-5 provisions relevant to geology and ground conditions. ................... 2 Table 1.2: Summary of NPS EN-1 and NPS EN-5 policy on decision making relevant to geology and ground conditions. ............................................................................................................................................ 5 Table 1.3: Summary of key consultation issues raised during consultation activities undertaken for Hornsea Three relevant to geology and ground conditions. ................................................................................ 7 Table 1.4: Summary of key desktop reports. ......................................................................................................... 8 Table 1.5: Designated geological sites. ................................................................................................................. 9 Table 1.6: WFD data for North Norfolk Chalk Unit. .............................................................................................. 23 Table 1.7: WFD data for Broadland Rivers Chalk and Crag Unit ......................................................................... 23 Table 1.8: Groundwater Source Protection Zone. ............................................................................................... 24 Table 1.9: Maximum design scenario considered for the assessment of potential impacts on geology and ground conditions. .............................................................................................................................. 33 Table 1.10: Definition of terms relating to the sensitivity of the receptor................................................................ 36 Table 1.11: Definition of terms relating to the magnitude of an impact. ................................................................. 36 Table 1.12: Matrix used for the assessment of the significance of the effect. ........................................................ 36 Table 1.13: Designed-in measures adopted as part of Hornsea Three. ................................................................ 37 Table 1.14: List of other projects and plans considered within the CEA. ............................................................... 45 Table 1.15: Maximum design scenario considered for the assessment of potential cumulative impacts on geology and ground conditions. ....................................................................................................................... 46 ii Chapter 1 – Geology and Ground Conditions Preliminary Environmental Information Report July 2017 Glossary Term Definition Term Definition Geomorphology The scientific study of landforms and their evolution over different timescales. Glaciagenic Materials deposited as a result of glaciation or deglaciation. Aquifer A subsurface layer or layers of rock or other geological strata of sufficient porosity and permeability to allow either a significant flow of groundwater or the abstraction of significant quantities of groundwater. Glacial river deposits, or glaciofluvial deposits, consist of material that has been transported by rivers originating Glaciofluvial from glaciers. Artificial ground Artificial ground is a term used by the British Geological Survey (BGS) for those areas where the ground surface has been significantly modified by human activity. Whilst artificial ground is not part of the 'real geology' of Ground conditions An assessment of the history and chemical and physical characteristics of the soil conditions at a site. bedrock and superficial deposits it does affect them and needs recording because the near surface ground All water which is below the surface of the ground in the saturated zone and in direct contact with the ground or conditions are so important to human activities and economic development. Artificial Ground includes: Groundwater subsoil. Made ground —such as embankments and spoil heaps on the natural ground surface. Directive 2006/118/EC of the European Parliament and of the Council of 12 December 2006 on the protection of Worked ground — areas where the ground has been cut away such as quarries and road cuttings. Groundwater Directive groundwater against pollution and deterioration. Infilled ground — areas where the ground has been cut away then wholly or partially backfilled. Landscaped ground — areas where the surface has been reshaped. The branch of geology dealing with water below the earth's surface and with the geological aspects of surface Hydrogeology Disturbed ground — areas of ill-defined shallow or near surface mineral workings where it is impracticable to waters. map made and worked ground separately. Natural ground Lowering or

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    40 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us