Microsoft Word

Microsoft Word

†iwR÷vW© bs wW G-1 evsjv‡`k †M‡RU AwZwi³ msL¨v KZ…©cÿ KZ…©K cÖKvwkZ e„n¯úwZevi, †m‡Þ¤^i 13, 2018 MYcÖRvZš¿x evsjv‡`k miKvi grm¨ I cÖvwYm¤ú` gš¿Yvjq grm¨-2 AwakvLv cÖÁvcb ZvwiL: 26 fv`ª 1425 e•Mvã/10 †m‡Þ¤^i 2018 wLª÷vã Gm, Avi, I bs 268-AvBb/2018|†h‡nZz, Protection and Conservation of Fish Act, 1950 (East Bengal Act No. XVIII of 1950), AZtci D³ Act ewjqv DwjøwLZ, Gi section 3 Gi sub-section (5) G cÖ`Ë ÿgZve‡j miKvi 29 ˆPÎ 1424 e•Mvã †gvZv‡eK 12 GwcÖj 2018 wLª÷vã Zvwi‡Li cÖÁvcb Gm, Avi, I bs-107-AvBb/2018 Øviv Protection and Conservation of Fish Rules, 1985, AZtci D³ Rules ewjqv DwjøwLZ, G wbgewY©Zœ ms‡kva‡bi j‡ÿ¨ 2 (`yB) gvm mg‡qi g‡a¨ AvcwË ev civgk© AvnŸvb Kwiqv cÖvK-cÖKvk KwiqvwQj; Ges †h‡nZz, D³ cÖvK-cÖKvkbvq DwjøwLZ `yB (2) gvm mgq BwZg‡a¨ AwZµvšÍ nBqv‡Q Ges cÖ¯ÍvweZ ms‡kva‡bi Dci †Kvb AvcwË ev civgk© cvIqv hvq bvB weavq miKvi D³ Rules Gi AwaKZi ms‡kva‡bi wel‡q P~ovšÍ wm×všÍ MÖnY Kwiqv‡Q; †m‡nZz, D³ Act Gi section 3 †Z cÖ`Ë ÿgZve‡j miKvi D³ Rules Gi wb¤œi~c AwaKZi ms‡kvab Kwij, h_v: ( 11349 ) g~j¨ : UvKv 4.00 11350 evsjv‡`k †M‡RU, AwZwi³, †m‡Þ¤^i 13, 2018 Dcwi-D³ Rules Gi rule 13 Gi sub-rule (1) Gi clause (a) Gi TABLE Gi Kjvg (1) Gi Sl. No. 5 Gi ci wb¤œi~c b~Zb Sl. No. 6 Ges Dnvi wecix‡Z Kjvg (2), (3) Ges (4) G wb¤œi~c Gw›Uªmg~n ms‡hvwRZ nB‡e, h_v: Ò 6. Total Length of 82 km between (i) Habinagar point: From three different river point of 22 451.08 N and March to Barisal district. Three points 90 25 .10.2 E April are: (ii) Bamnar Char Point: each year a. Total 13.70 km stretch of 22 49 22.44 N and the Kalabadar River 90 28 5.16 E between Habinagar point, Barisal Sadar Upazila and Bamnar Char point, Mehendigonj Upazila of Barisal. b. Total 8.81 km stretch of the (i) Bamnar char point: Gajaria River between 22.8229 N and Bamnar Char point of 90.4681 E Mehendigonj Upazila and (ii) Hizla Launch Ghat Hizla Launch Ghat point, Point: Hizla Upazila of Barisal. 22.9067 N and 90.5308 E c. Total 59.51 km stretch of (i) Hizla Launch Ghat: the Meghna River between 22.9067 N and Hizla Launch Ghat point of 90.5308 E Hizla Upazila and Dashkin- (ii) Dashkin-Paschim Paschim Jangalia point, Jangalia Point: Mehendigonj Upazila of 22.7333 N and Barisal. 90.4917 E Ó| ivóªcwZi Av‡`kµ‡g †gvt iBQDj Avjg mwPe| †gvt jvj †nv‡mb, DccwiPvjK, evsjv‡`k miKvix gy`ªYvjq, †ZRMuvI, XvKv KZ…©K gyw`ªZ| †gvt Avãyj gv‡jK, DccwiPvjK, evsjv‡`k dig I cÖKvkbv Awdm, †ZRMuvI, XvKv KZ…©K cÖKvwkZ| website: www.bgpress.gov.bd .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us