Proposed Closure of Watford Station

Proposed Closure of Watford Station

Railways Act 2005 Schedule 8 Proposed closure of Watford station Notice is given that London Underground Limited (“LUL”) as the operator of the Metropolitan line proposes to close, and discontinue services to and from, Watford station, Cassiobury Park Avenue, Watford, Hertfordshire WD18 7LE. This proposal is made in connection with the Croxley Rail Link Project (the “Project”). The Project involves the diversion of the Metropolitan line at a point 1.3 kilometres south of Watford station via a new viaduct to connect into the disused Croxley Green branch line before connecting into Network Rail’s existing network near Wiggenhall Road. The Croxley Rail Link would provide new stations on Ascot Road and Vicarage Road and Metropolitan line services would also call at the existing stations at Watford High Street and Watford Junction (the latter becoming the new terminus). The frequency of the new service is expected to be similar to the existing service to Watford station and the new station on Ascot Road will be within 15 minutes’ walk of Watford station. Details of these proposals can be found online at www.croxleyraillink.com or by telephoning the Croxley Rail Link project office on FREEPHONE 0800 612 5240. The construction and operation of the Croxley Rail Link is to be authorised by separate statutory powers under the Transport and Works Act 1992. The proposal to close, and discontinue services to and from, Watford station is dependent on the making of an Order under that Act, the construction of the necessary works and the opening of the Croxley Rail Link to Metropolitan line services. If you wish to object to the specific proposal to close, and discontinue services to and from, Watford station you should write to London TravelWatch (of which the formal title is the London Transport Users’ Committee) at 6 Middle Street, London EC1A 7JA (or email [email protected]). Further details of the closure process may be found at: www.londontravelwatch.org.uk/consultations/railway_closures The proposal date is 13 April 2012 and that is the closing date for receipt of objections. However the closure of, and discontinuance of services to and from, Watford station will not take place before the opening of the Croxley Rail Link to passenger services. The programme for the extension anticipates the opening taking place in 2016. Transport for London.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us