Bow to Bluff Public Realm Plan — Design Update

Bow to Bluff Public Realm Plan — Design Update

Bow to Bluff Public Realm Plan — Design Update December 2017 Great public spaces encourage people to gather, recreate, explore and discover. Introduction The City of Calgary is planning to improve the corridor along the northwest C-train line from McHugh Bluff to the Bow River. The corridor design began in 2012 as a community-led The Plan combines input from the public and stakeholders initiative to develop an urban design framework that regarding elements that contribute to the vitality of a place, ff would transform the public corridor along the Light Rail including traffic movement, fences, placemaking, safety, lu Transit (LRT) line into a great public space. In the fall of play, gardens, cooking, cycling and strolling. The Plan McHugh B 2016, The City began the process toward implementation amends the proposed public realm improvements based of the framework. Public and stakeholder engagement in on new community and City input. As funding becomes the spring of 2017 brought forward updated issues and available, the revised design and associated budgets will LANEWAY MEWS opportunities as well as program ideas to guide the Bow to guide The City in determining the implementation process. Bluff Public Realm Plan (The Plan). What has changed since the completion of the 2012 Urban Design PARKETTE 2 4 AVE NW Framework? 10 ST NW SUNNYSIDE CTRAIN STATION ■ Calgary Transit extension to the Light Rail Transit ■ The previous City-owned warehouse on 2nd (LRT) platform and installation of a power Avenue and 9 Street has been demolished, substation transformed into a temporary community space and new plans for an affordable housing project are 3 AVE NW ■ Battistella Developments condominium on 2nd ongoing r Avenue and 9A Street e ■ City-implemented public-realm improvements, v ■ Bucci development on 5th Avenue MEMORIAL DR NW i including road narrowing and sidewalk widening GREEN WALKWAY R ■ Minto development planned on 9A Street along 2nd Avenue between 9A and 10th Streets 2 AVE NW w o PARKETTE 3 B ■ Lighting upgrades along 9A Street and through the park spaces along the east side of the LRT line PARKETTE 4 ACTIVE LIVING PARK + MEMORIAL DR. Project Timeline The development of The Plan spans from late 2016 to early Currently, funding is being acquired for a first phase of 2018. Feedback from the engagement informed the concept detailed design and construction projected to occur in 2018. design that will be used to seek funding from multiple sources within The City. 10 ST NW 2017 2018 PHASE 1 ENGAGE DESIGN INFORM DESIGN IMPLEMENTATION FUTURE MAY/JUN JUN–NOV DEC JAN–APR (2018) FUNDING N Vision + Objectives Public Feedback The Bow to Bluff Public Realm Plan transforms the corridor into a On May 27, we received a total of 1,519 comments. conduit for social interaction, community building and sustainable On May 27, 2017, residents were invited to provide feedback Design the Corridor. Give feedback on the programs and mobility. at an outdoor open house that took place at the containR design features they would like to see in the different areas. site. An online survey was also available from May 27th to June 15th for the community to provide further input. Prioritize. Rank the timing of the various improvements. Participants engaged in the following tasks: Corridor Elements and Programming. Select preferences What are the objectives for this Plan? Issues and Opportunities. Share ideas that could be used and comment on inspiration images to help create a more to update the design plan using a map of the 2012 design detailed programming plan for the corridor. The Bow to Bluff Design Framework identifies major ■ Inclusive civic spaces - Offer more diverse places to framework. improvements within the existing corridor. The following gather and enliven with festivals, events and place- objectives apply to the existing public realm and the making activities creation of new spaces and routes: ■ Green open space - Improve the overall aesthetic What We Heard ■ Shared streets - Create pedestrian and cycling of the corridor with natural features and plantings routes that are accessible, clear, convenient, safe ■ Aesthetics - Beautify the LRT fence by The top eight recommendations are as follows: The top five elements and programs were: and well-signed incorporating lighting, plantings, greater visibility ■ Add new vegetation and green space throughout ■ Re-purposed container ■ Exciting parks - Provide innovative and attractive and patterns parks that promote physical activities for all ages, ■ Visibility and safety - Enhance visibility and ■ More community spaces for activities and functions ■ Evening gathering space while ensuring new spaces and routes respond to integrate lighting along the corridor to increase the ■ Improve pedestrian safety ■ Community garden the functional requirement of the corridor feeling of safety ■ Create a better overall experience with ■ Vegetated fence more amenities ■ Mural / art ■ Provide more cycling infrastructure ■ Better maintenance Of the thirteen sub-projects proposed, the top five priorities for construction were (see image below): ■ More art 1. Parkette 3 2. Intersection (2 Ave NW and 9A ST NW) 3. LRT fence 4. Active living park and Memorial Dr 5. Green Walkway 4 AVE NW 3 AVE NW 2 AVE NW 10 6 3 1 9 4 13 11 12 8 7 5 2 6. Parkette 2 8. Intersection 10. Walkway 12. 9A Street Bow to Bluff Community Event on May 27, 2017 7. Intersection 9. Parkette 4 11. LRT Fence 13. Parkette 1 + (North) Laneway Mews Issues + Opportunities The most prominent condition on site is the LRT corridor running Key opportunities for the public realm: north-south, with a fence dividing the Hillhurst and Sunnyside ■ Protect and enhance existing park spaces and routes ■ Design versatility into the layout as well as the details of site furnishings, accommodating weekly ■ Create new spaces and routes that are clear, communities. community events and festivals accessible and convenient for diverse modes of travel and user groups ■ Create year-round visual interests and recreational amenities in the park spaces The LRT corridor shifts from elevated to street level and ■ Memorial Drive is an obstacle for north-south ■ Expand the cycling network and strengthen specific presents a significant visual and physical barrier east-west pedestrian and cycle movement pedestrian connections, specifically across the LRT ■ Promote a sense of safety and increase sightlines across the corridor. The issues of the current conditions line and high-vehicle traffic zones through the renewal of the LRT fence and upkeep of ■ Poor connections for pedestrians and cyclists are as follows: existing vegetation throughout the corridor due to insufficient bike ■ Ensure new public spaces and routes complement routes through the area ■ The existing LRT line creates a visual barrier and new and future development ■ Integrate the local heritage and culture into impedes east-west connections the design ■ Low visibility from outside the corridor ■ Design street furniture that is high-quality and contributes to a cohesive identity within the ■ Underused and uninviting spaces due to a lack of ■ Lack of active edges along key routes defined uses and maintenance, particularly for the corridor triangular parkettes UNDERUSED SPACE DEVELOPMENT 9 ST NW REDUCED SIGHTLINES / 1 AVE NW 7 ST NW 4 AVE NW 3 AVE NW 2 AVE NW New Development POOR VISIBILITY NARROW WALKWAY SUSTAINABLE LANDSCAPE TREATMENT New Development Heavy Traffic Heavy Traffic Heavy Traffic MEMORIAL DR McHugh Bluff Future Affordable Connection Housing Site Complete Unclear Connection Sunnyside r C Train Station C Train Corrido 9A ST NW New Development Future Development Future Development 4 AVE NW AVE 4 NW AVE 3 NW AVE 2 Heavy Cycling Connection New Development 5 AVE NW AVE 5 10 ST NW 10 ST NW 0 25 50m New Development Concept Design The concept for the Bow to Bluff corridor responds to what we have learned through public input and site analysis. It builds on the vision established in the 2012 Bow to Bluff Framework. It is the roadmap for implementation. AREA 1 AREA 3 AREA 5 AREA 6 McHugh Bluff to 5 Ave NW 4 Ave NW to 2 Ave NW 2 Ave NW to 1 Ave NW 1 Ave NW to Memorial Dr. 1 AVE NW 7 ST NW 4 AVE NW 3 AVE NW 2 AVE NW 9 ST NW MEMORIAL DR C Train Corridor 9A ST NW 4 AVE NW AVE 4 NW AVE 3 NW AVE 2 5 AVE NW AVE 5 10 ST NW 0 25 50m AREA 2 AREA 4 5 Ave NW to 4 Ave NW 9A St NW Area 1 | McHugh Bluff to 5 Ave NW Area 2 | 5 Ave NW to 4 Ave NW The bridge underpass at the north end of the site forms playground and the primary pathway. These pathway The underused triangular parkette to the east of the LRT The open space west of the LRT consists primarily of a linear a gateway that announces entry to the corridor. A set of connections are supported by easily identifiable signage that has the appropriate residential context to become a play vegetated strip. The widened pathway offers a clear visual stairs leads visitors towards McHugh Bluff, a grassy slope helps newcomers and commuters navigate nearby parks area. Crabapple trees arranged in a perfect semi-circle wrap connection towards the bluff. Paved in a distinctive pattern, area with stands of trees and native plants. A lookout at the and cycling routes. A heavily used commuter route via the around a central play mound, defining the park’s edges. the path expands in areas to create small gathering spaces. top of the stairs faces the revitalized 9A Street, enhanced laneway west of the LRT is converted into an attractive mews Various play structures engaging different age groups are Aspens planted on both sides of the path create a unique with new trees, shrubs and lighting along the LRT fence.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us