ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement

ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement

ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX B Alternatives Description and Construction Methods Submitted by: PARSONS BRINCKERHOFF Prepared by: PARAMETRIX J U L Y 2 0 1 1 Alaskan Way Viaduct Replacement Project Final EIS Alternatives Description and Construction Methods Discipline Report The Alaskan Way Viaduct Replacement Project is a joint effort between the Federal Highway Administration (FHWA), the Washington State Department of Transportation (WSDOT), and the City of Seattle. To conduct this project, WSDOT contracted with: Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 In association with: Coughlin Porter Lundeen, Inc. EnviroIssues, Inc. GHD, Inc. HDR Engineering, Inc. Jacobs Engineering Group Inc. Magnusson Klemencic Associates, Inc. Mimi Sheridan, AICP Parametrix, Inc. Power Engineers, Inc. Shannon & Wilson, Inc. William P. Ott Construction Consultants SR 99: Alaskan Way Viaduct Replacement Project July 2011 Alternatives Description and Construction Methods Discipline Report Final EIS This Page Intentionally Left Blank TABLE OF CONTENTS Chapter 1 Introduction and Summary ................................................................................................................. 1 1.1 Introduction ................................................................................................................................................ 1 1.2 Project Background ................................................................................................................................... 1 1.3 Summary ................................................................................................................................................... 2 1.3.1 Construction Plans, Durations, and Sequencing ............................................................................. 3 1.4 Build Alternatives Overview ....................................................................................................................... 3 1.4.1 Elements Common to All Build Alternatives .................................................................................... 4 1.4.2 Bored Tunnel Overview ................................................................................................................... 5 1.4.3 Cut-and-Cover Tunnel Alternative Overview ................................................................................... 8 1.4.4 Elevated Structure Alternative Overview ....................................................................................... 10 1.5 List of Final EIS Appendices .................................................................................................................... 12 Chapter 2 Description of Alternatives ............................................................................................................... 13 2.1 Viaduct Closed (No Build Alternative) ...................................................................................................... 13 2.1.1 Viaduct Closed (No Build Alternative) 2030 Scenario 1: Sudden Unplanned Loss of SR 99 ........ 13 2.1.2 Viaduct Closed (No Build Alternative) 2030 Scenario 2: Catastrophic Failure and Collapse of SR 99 ....................................................................................................................................... 13 2.1.3 2015 Existing Viaduct .................................................................................................................... 14 2.2 Elements Common to All Build Alternatives ............................................................................................ 14 2.2.1 Utility Relocations .......................................................................................................................... 14 2.2.2 Viaduct Removal ........................................................................................................................... 15 2.3 Bored Tunnel Alternative ......................................................................................................................... 16 2.3.1 South Portal Area .......................................................................................................................... 16 2.3.2 Bored Tunnel Alignment – Central ................................................................................................ 21 2.3.3 North Portal Area ........................................................................................................................... 23 2.3.4 Battery Street Tunnel Decommissioning ....................................................................................... 24 2.3.5 Program Elements ......................................................................................................................... 27 2.4 Cut-and-Cover Tunnel Alternative ........................................................................................................... 29 2.4.1 South – S. Royal Brougham Way to S. King Street ....................................................................... 29 2.4.2 Central – S. King Street to South Portal of Battery Street Tunnel ................................................. 32 2.4.3 Battery Street Tunnel – Portal to Portal ......................................................................................... 35 2.4.4 North – Battery Street Tunnel to Aloha Street ............................................................................... 36 2.5 Elevated Structure Alternative ................................................................................................................. 38 2.5.1 South – S. Royal Brougham Way to S. King Street ....................................................................... 38 2.5.2 Central – S. King Street to South Portal of Battery Street Tunnel ................................................. 40 2.5.3 Battery Street Tunnel – Portal to Portal ......................................................................................... 43 2.5.4 North – Battery Street Tunnel to Aloha Street ............................................................................... 43 2.5.5 Pine Street to Broad Street ............................................................................................................ 44 Chapter 3 Construction Elements and Methods .............................................................................................. 45 3.1 Construction Elements Common to All Build Alternatives ....................................................................... 45 3.1.1 Construction Staging Areas ........................................................................................................... 45 3.1.2 Construction Work Shifts ............................................................................................................... 49 3.1.3 Construction Haul Routes .............................................................................................................. 49 3.1.4 Construction Equipment ................................................................................................................ 50 3.1.5 Utility Relocations .......................................................................................................................... 51 SR 99: Alaskan Way Viaduct Replacement Project July 2011 Alternatives Description and Construction Methods Discipline Report i Final EIS 3.1.6 Seattle Ferry Terminal Access During Construction ...................................................................... 52 3.2 Bored Tunnel Alternative – Construction Methods for Major Elements ................................................... 53 3.2.1 Construction Risks and Ground Improvement Methods ................................................................ 53 3.2.2 South Portal Area Construction ..................................................................................................... 59 3.2.3 Bored Tunnel Construction ............................................................................................................ 60 3.2.4 North Portal Area Construction ...................................................................................................... 67 3.2.5 Viaduct Demolition ........................................................................................................................ 68 3.2.6 Battery Street Tunnel Decommissioning ....................................................................................... 69 3.2.7 Surface Street Improvements and Restoration of Utilities ............................................................. 69 3.3 Cut-and-Cover Tunnel Alternative Construction Methods ....................................................................... 70 3.3.1 South – S. Royal Brougham Way to S. King Street ....................................................................... 70 3.3.2 Central – S. King Street to South Portal of Battery Street Tunnel ................................................. 71 3.3.3 North – Battery Street Tunnel to Aloha Street ............................................................................... 72 3.4 Elevated Structure Alternative Construction Methods ............................................................................. 73 3.4.1 South – S. Royal Brougham Way to S. King Street ....................................................................... 74 3.4.2 Central – S. King Street to South Portal of Battery Street Tunnel ................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    116 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us