Industrial Park (Phase- I) at South Block, Srikalahasthi Node

Industrial Park (Phase- I) at South Block, Srikalahasthi Node

ANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LIMITED Industrial Park (Phase- I) at South Block, Srikalahasthi Node Pre Feasibility Report September 2018 L&T Infrastructure Engineering Limited C1182901 RP002, Rev.0 L&T Infrastructure Engineering Ltd. Client: Andhra Pradesh Industrial Infrastructure Corporation Limited (APIIC) Vijayawada, AP Project: Project No.: DPR VCIC CTR Node (SB) C1182901 Title: Document No.: Rev.: Pre-feasibility Report RP002-P1 0 This document is the property of L&T Infrastructure Engineering Ltd. and File path: must not be passed on to any person or body not authorised by us to receive it i:\ports & harbour\vcic-chitoor\form 1 and tor\final files\final pfr form 1 and nor be copied or otherwise made use of either in full or in part by such person or tor\pfr\chittoor node south cluster start up area - pfr 28.09.2018.docx body without our prior permission in writing. Notes: 1. Revision Details: Init. Sign. Init. Sign. Init. Sign. Rev. Date Details Prepared Checked Approved DPR VCIC CTR Node (SB) C1182901 Pre-feasibility Report RP002rev. 0 TABLE OF CONTENTS 1 Preface .............................................................................................................................................1 2 Executive Summary........................................................................................................................3 3 Project Introduction/ Background Information ...........................................................................6 3.1 Project Identification ..................................................................................................................6 3.2 Project Developer .....................................................................................................................6 3.3 Project Site Location .................................................................................................................6 3.4 Brief Description of Nature of Project .......................................................................................8 3.4.1 Industrial Sector Categorisation as per EIA Notification .................................................9 3.5 Need for the Project ............................................................................................................... 13 3.5.1 General ........................................................................................................................ 13 3.5.2 Initiatives of GoI and GoAP ......................................................................................... 14 3.5.3 Location Advantage/Justification ................................................................................. 16 3.6 Employment Generation ........................................................................................................ 17 3.7 Consultant Appointed ............................................................................................................. 17 4 Project Description ...................................................................................................................... 18 4.1 Type of Project ....................................................................................................................... 18 4.2 Site Location .......................................................................................................................... 18 4.3 Details of Alternative Sites ..................................................................................................... 19 4.4 Factors Considered for Evaluation ........................................................................................ 20 4.5 Size or Magnitude .................................................................................................................. 21 4.6 Resources Availability and Optimisation ................................................................................ 22 4.6.1 Water Availability & Source ......................................................................................... 22 4.6.2 Energy/Power & Source .............................................................................................. 23 4.6.3 Wastewater Management ............................................................................................ 25 4.6.4 Solid Waste Management............................................................................................ 25 5 Site Analysis ................................................................................................................................ 27 5.1 General .................................................................................................................................. 27 5.2 Topography ............................................................................................................................ 28 5.3 Existing Connectivity .............................................................................................................. 28 5.3.1 Road connectivity ........................................................................................................ 28 5.3.2 Rail Connectivity .......................................................................................................... 29 5.3.3 Air connectivity ............................................................................................................. 29 5.3.4 Port connectivity .......................................................................................................... 29 5.4 Land Ownership ..................................................................................................................... 29 5.5 Existing Land use Pattern ...................................................................................................... 30 5.6 Soil Classification ................................................................................................................... 31 5.7 Climatic Data .......................................................................................................................... 31 5.7.1 Climatic Conditions ...................................................................................................... 31 5.7.2 Wind Direction ............................................................................................................. 31 5.7.3 Flooding Zone .............................................................................................................. 31 5.8 Social Infrastructure ............................................................................................................... 31 5.9 Existing Drainage Pattern ...................................................................................................... 32 6 Planning Brief .............................................................................................................................. 34 6.1 Planning Concept/Design Basis/Planning Considerations .................................................... 34 6.2 Planning Consideration .......................................................................................................... 34 6.2.1 Type of Industry ........................................................................................................... 35 6.2.2 Facilities ....................................................................................................................... 35 6.2.3 Transportation .............................................................................................................. 35 6.3 Population Projection ............................................................................................................. 35 6.4 Land use Planning ................................................................................................................. 35 6.5 Assessment of Infrastructure Demand .................................................................................. 35 6.5.1 Water ........................................................................................................................... 35 6.5.2 Power ........................................................................................................................... 36 6.5.3 Wastewater .................................................................................................................. 36 Table of Contents Page i DPR VCIC CTR Node (SB) C1182901 Pre-feasibility Report RP002rev. 0 6.5.4 Solid waste .................................................................................................................. 36 6.6 Amenities/ Facilities ............................................................................................................... 36 7 Proposed Infrastructure .............................................................................................................. 37 7.1 Land use ................................................................................................................................ 39 7.1.1 Industrial Area .............................................................................................................. 39 7.1.2 Logistics Zone .............................................................................................................. 39 7.1.3 Commercial Area ......................................................................................................... 39 7.1.4 Residential Area .........................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    54 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us