PROJECTS ESTIMATED to COST MORE THAN $150,000 Addictions Foundation of Manitoba • Thompson – Make-Up Air Unit Replacement Wi

PROJECTS ESTIMATED to COST MORE THAN $150,000 Addictions Foundation of Manitoba • Thompson – Make-Up Air Unit Replacement Wi

•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• PROJECTS ESTIMATED TO COST MORE THAN $150,000 Addictions Foundation of Manitoba Thompson – make-up air unit replacement Winnipeg Regional Health Authority Actionmarguerite (St. Boniface) – fire pump, controller replacement and connection to back-up generator Deer Lodge Centre – boiler controls replacement Donwood Manor – roof replacement Health Sciences Centre – HVAC upgrades in the GA wing of the General Hospital Holy Family Nursing Home – elevator upgrades Manitoba Renal Program – dialysis reverse osmosis system replacement at Ashern site Pan Am Clinic – roof replacement Seven Oaks General Hospital – roof replacement St. Boniface General Hospital – boiler and chiller controls upgrades The Convalescent Home – phase two of roof replacement Churchill Staff Residences A and B – roof replacement Interlake Eastern Regional Health Authority Teulon EMS Station – new crew quarters Lac du Bonnet Personal Care Home and Whitemouth District Health Centre – phase two of fire alarm upgrades Pinawa Hospital – roof repairs Pine Falls Health Complex, Hunter Memorial Hospital (Teulon) and Goodwin Lodge (Teulon) – primary electrical distribution upgrades Pine Falls Health Complex – phase two of back service entrance upgrades Betel Home (Selkirk) – roof replacement Rosewood Lodge (Stonewall) – air conditioning upgrades Stonewall District Health Centre – boiler replacement Whitemouth District Health Centre/ Personal Care Home – sprinkler installation …2/ - 2 - Northern Regional Health Authority Snow Lake Health Centre – fire safety upgrades The Pas Health Complex – water booster replacement Thompson General Hospital – mould remediation in the medical records archive room, roof replacement, vacuum pump upgrades/replacement and phase two of a water booster upgrade Prairie Mountain Health Mafeking EMS Station – new crew quarters Brandon Child and Adolescent Treatment Centre – shingle replacement and fan vent upgrades Brandon - Rideau Park Personal Care Home – shingle replacement Minnedosa Health Centre – boiler replacement Rossburn Personal Care Home – phase two of the domestic water system replacement Souris Health Centre – roof replacement Sherwood Home (Virden) – shingle replacement Southern Health – Santé Sud Third Crossing Manor (Gladstone) – sprinkler system installation Gladstone Health Centre – sprinkler system installation MacGregor Health Centre – kitchen renovation Portage District General Hospital – boiler replacement Lions Prairie Manor (Portage la Prairie) – fire alarm replacement St. Claude Health Centre – sprinkler system installation Ste. Anne Hospital – attic ventilation ductwork and insulation upgrades Bethesda Regional Health Centre (Steinbach) – roof replacement Rest Haven Nursing Home (Steinbach) – dining room heating, ventilation and air conditioning (HVAC) upgrades, and a building controls system upgrades Boundary Trails Health Centre (Winkler-Morden) – crawlspace mechanical and cast drain line replacement …3/ - 3 - PROJECTS ESTIMATED TO COST LESS THAN $150,000 Addictions Foundation of Manitoba 1031 Portage Ave., 1041 Portage Ave. and 200 Osborne St. – surveillance and security system upgrades 1031 Portage Ave. and 1041 Portage Ave. – alarm system upgrades 1031 Portage Ave., 1041 Portage Ave. and Frederick Street (Brandon) – fire panel replacement 1031 Portage Ave. – heating, ventilation and air conditioning work 1041 Portage Ave. – storage room flooring replacement Manitoba Health, Seniors and Active Living Cadham Provincial Laboratory – controller upgrades, phase two of a direct digital control project, phase one of a fire suppression system project and phase two of laboratory remodel Winnipeg Regional Health Authority Actionmarguerite St. Boniface – roof replacement of the ABC Building Actionmarguerite St. Vital – elevator cylinder replacement Concordia Hospital – heating, ventilation and air conditioning controls replacement Lions Manor –corridor camera replacements Luther Home – flooring replacement in the common areas Meadowood Manor – replacement of galvanized waste pipes in crawlspace and replacing two air make-up units/heat exchangers Park Manor – kitchen repairs and upgrades Seven Oaks General Hospital – phase two of domestic water line replacement on level one and roof replacement on level two St. Amant– phase two of air handling unit replacement St. Boniface General Hospital – cooling tower replacement, barricade and ligature prevention in the McEwen Building The Middlechurch Home of Winnipeg – sewage plant decommissioning The Simkin Centre (Sharon Home) – roof replacement on the Amenity Building Victoria General Hospital – floor replacement, domestic hot water and copper ionization systems, barricade and ligature prevention for the mental health unit and water temperature valve replenishment Churchill Health Centre – building and environmental assessments for winter wind/snow storms …4/ - 4 - Interlake-Eastern Regional Health Authority All regional facilities – phase one of arc flash testing Arborg and District Health Centre and Arborg Personal Care Home – phase two of kitchen upgrades, exit pad replacements Arborg District Health Centre – transfer switch and intercom system replacement, exit pad replacements Ashern Personal Care Home – transfer switch and intercom system replacement Ashern Hospital and Personal Care Home – exit pad replacements Hunter Memorial Hospital (Teulon) and Goodwin Lodge (Teulon) – exit pad replacements Beausejour Health Centre – controls software upgrades, nurse call system upgrades East Gate Lodge (Beausejour) – controls software upgrades, air handling control unit replacement Kinplace Personal Care Home (Oakbank) – controls software upgrades Lundar Personal Care Home – fire panel repairs E. M Crowe Memorial Hospital and Personal Care Home (Eriksdale) – fire panel repairs, kitchen and walk-in freezer repair Betel Home (Selkirk) – air conditioning replacements, and kitchen air conditioner and heater replacement Stonewall District Hospital – design consultations for boiler replacement Northern Regional Health Authority All facilities in region – roof assessments Northern Lights Manor (Flin Flon) – building management systems headend upgrades Gillam Hospital – carbon monoxide detector replacement Rosaire House – plumbing repairs Thompson General Hospital – front sliding doors upgrades Prairie Mountain Health Birtle Health Centre and Personal Care Home – boiler replacement Glenboro Health Centre – fire alarm system replacement Killarney Health Centre – fire alarm panel replacement Rivers Health Centre – flooring replacement Shoal Lake EMS Station – vehicle exhaust capture installation Shoal Lake Health Centre – replace headend controller Wawanesa Health Centre and Personal Care Home – replace headend controllers …5/ - 5 - Southern Health – Santé Sud Boyne Lodge (Carman) – patient wandering security system replacement Rock Lake Hospital (Crystal City) – nurse call system replacement Third Crossing Manor (Gladstone) – sewer line replacement Gladstone Health Centre – phase two of a roof replacement Red River Valley Lodge (Morris) – domestic hot water boiler replacement Oak Buff EMS Station – vehicle exhaust capture installation Lions Prairie Manor (Portage la Prairie) – roof replacement Villa Youville (Ste. Anne) – air conditioning compressor unit and well water pump replacement Bethesda Health Centre (Steinbach) – electrical transformer replacement, lab and phlebotomy cooling system upgrades and an infant abduction system installation Rest Haven Nursing Home (Steinbach) – flooring replacement in the dining hall and main public areas Vita and District Health Centre – air conditioning replacement, emergency generator room modifications/transfer switch work and mould remediation in two mechanical rooms Boundary Trails Health Centre (Winkler-Morden) – card access system upgrades, chiller compressor replacement and a nurse call and security system upgrades CancerCare Manitoba CancerCare Manitoba McCharles Site – urgent care centre lighting upgrades .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us