Richmond Highway Bus Rapid Transit TAC Meeting

Richmond Highway Bus Rapid Transit TAC Meeting

County of Fairfax, Virginia Richmond Highway Bus Rapid Transit TAC Meeting July 16, 2019 The Richmond Highway BRT project is funded in part by the Northern Virginia 1 Transportation Authority. County of Fairfax, Virginia Agenda • Project Overview • Project Updates • Next Steps • Staying Involved Department of Transportation 2 County of Fairfax, Virginia Department of Transportation 3 Project Overview Richmond Highway Bus Rapid Transit 4 County of Fairfax, Virginia How We Got To BRT • Route 1 Multimodal Alternatives Analysis • Embark Richmond Highway − Fairfax County Comprehensive Plan Amendment 2015-IV-MV1 − Richmond Highway Corridor Improvements Projects − Richmond Highway BRT Department of Transportation 5 County of Fairfax, Virginia Route 1 Multimodal Alternatives Analysis • Led by the Virginia Department of Rail and Public Transportation (DRPT) • Studied 15-mile segment of Richmond Highway from Huntington Metrorail to Woodbridge • Significant Community Input • Final recommendation was phased implementation of Alternative 4 − Near-term: Median-running BRT − Long-term: A Metrorail extension to Hybla Valley, with BRT Four Transit Alternatives − Assumes Richmond Highway has a 1: BRT – Curb consistent six-lane cross-section 2: BRT – Median • Completed in January 2015 3: LRT 4: Metrorail/BRT Hybrid Department of Transportation 6 County of Fairfax, Virginia Embark Richmond Highway Embark Richmond Highway is the County’s vision for the corridor that encompasses and expands upon the DRPT recommendations COMPREHENSIVE PLAN AMENDMENT BUS RAPID TRANSIT (BRT) ROAD WIDENING Department of Transportation 7 County of Fairfax, Virginia Fairfax County Comprehensive Plan Amendment 2015-IV-MV1 • Adopted March 20, 2018 • Establishes corridor-wide planning goals and objectives, with an urban design vision and land use changes in support of BRT, and guidance for creating * Potential BRT Station transit-oriented places • Implementation will occur through the rezoning and development process * • Office of Community Revitalization (OCR) is now developing design guidelines for the corridor Department of Transportation 8 County of Fairfax, Virginia Richmond Highway Corridor Improvements Projects • Project 1: Telegraph Road to Mount Vernon Highway − Led by Federal Highway Administration (FHWA Eastern Federal Lands) − Completed in fall 2017 • Project 2: Jeff Todd Way to Napper Road − Led by Virginia Department of Transportation (VDOT) − 2.9 miles, last remaining four-lane section north of Fort Belvoir − Environmental and design work is currently underway; construction anticipated for 2023-2025 − In each direction: an additional lane, bicycle and pedestrian improvements, and BRT accommodations Department of Transportation 9 County of Fairfax, Virginia Richmond Highway Corridor Improvements - Project 2 • VDOT project is under design, with construction anticipated for 2023- 2025 • In each direction: an additional lane, bicycle and pedestrian improvements, and BRT accommodations TYPICAL SECTION The intent of this graphic is to depict the configuration of elements within the proposed right-of-way. For clarity, potential landscaping is not shown. Department of Transportation 10 County of Fairfax, Virginia Richmond Highway BRT • The Richmond Highway Bus Rapid Transit (BRT) Project is an effort to plan, design, and construct a BRT system between Huntington Metrorail Station and Fort Belvoir • Nine potential BRT stations • Two sections: − Section I: Huntington Metrorail Station to Hybla Valley − Section II: Hybla Valley to Fort Belvoir • Future: - Section III: Fort Belvoir to Woodbridge Department of Transportation 11 County of Fairfax, Virginia Richmond Highway BRT Improvements • Two dedicated BRT lanes in median for majority of alignment; brings quality, reliability, and safety • Roadway widening, where necessary (no increase in number of lanes) • Consideration of future connections to walkways, trails, and bicycle facilities • Streetscape (station/landscape, walkways, signage) CONCEPTUAL ROADWAY CROSS SECTION 12 County of Fairfax, Virginia What is Bus Rapid Transit (BRT)? • BRT is a high-quality public transportation system designed to be fast, reliable, and more convenient than traditional bus routes • It operates much like rail service, on a dedicated transit way, but with the flexibility and lower cost of bus vehicles Department of Transportation 13 County of Fairfax, Virginia National BRT Examples In Virginia Existing: • Alexandria / Arlington (Metroway) • Richmond (GRTC Pulse) Planned: • Fairfax County (Richmond Highway BRT) • Route 7 Tysons to Alexandria Department of Transportation 14 County of Fairfax, Virginia What is Bus Rapid Transit (BRT)? • Key elements of BRT systems often include: − Service plans and frequencies that prioritize reliable, frequent, efficient service − Dedicated lanes & traffic signal priority − Information technology systems − “Rail style” stations, with features that enhance rider comfort and convenience − High-quality buses − Unique graphics & name Department of Transportation 15 AV4 JK1 County of Fairfax, Virginia Richmond Highway BRT Improvements 16 Slide 16 AV4 Under Public Involvement and newsletters? Aguayo, Vanessa, 1/10/2019 JK1 I removed the zoomed in version on the newsletter slide - we can discuss if you had other concerns. I think it fits well here to say "we've been working on a conceptual way to show you how BRT could look..." Jennifer Koch, 1/10/2019 County of Fairfax, Virginia Funding Commitment for BRT Funding Gap & Cost Programmed Proposed Funding Sources Estimate(M) Funding (M) Sources $730M* $4M DRPT $250M NVTA 70%(FY18/23) $57.6M CMAQ/RSTP $50M SMART SCALE $10M CMAQ/RSTP $70.4M NVTA 70% $288M FTA New Starts Sub-Total $361.6M $368.4M Note: *Cost based on an approximate 5-10% design and are subject to change and refinement as more engineering/design is completed Department of Transportation 17 Preliminary BRT Schedule 18 Project Updates Richmond Highway Bus Rapid Transit 19 County of Fairfax, Virginia Branding • Branding is more than a logo! The brand will bring the service to life and will help frame and position the BRT Program and the BRT service with the community, the stakeholders, and target audience • Branding Development Team − Leading the development of the BRT brand − Made up of representatives from the community, including some Community Advisory Group members − Meeting regularly throughout 2019 • Next Steps: engage CAG, executive committee, focus groups and community Department of Transportation 20 County of Fairfax, Virginia Environmental (NEPA) The National Environmental Policy Act (NEPA) requires that we consider how the project will affect the community and the environment before we make decisions. Activities To Date Include: • Federal Transit Administration concurred with Purpose and Need Statement • Existing conditions analysis for most disciplines complete, including natural resources fieldwork • Historic architecture identification underway Department of Transportation 21 County of Fairfax, Virginia Environmental Evaluation • Examples of resources being studied: − Community facilities − Cultural resources − Natural resources − Minority and low-income populations − Noise and vibration − Endangered Species − Air Quality Historic Gum Springs Signage Department of Transportation 22 County of Fairfax, Virginia Public Outreach • Various other engagement activities along the corridor • A Story Map is now live on the website! • Provide feedback at: Fairfaxcounty.gov/transportation/Rich mond-hwy-brt • Sign up for email/text updates via fairfaxcounty.gov/alerts (search Fairfax DOT and Richmond Highway BRT) • Community Meetings − Held in April 2018 and January 2019 − Next Meeting: September 17, 2019 fairfaxcounty.gov/transportation/richmond-hwy-brt Department of Transportation 23 County of Fairfax, Virginia Public Outreach • Summer Mini-Meeting Effort − 6 meetings − Various locations − Every Wednesday starting July 24, 2019 • Newsletter #3 − Updated the new website with news and project information, including an informational video and Public Information Materials from 1/23/19 Department of Transportation 24 County of Fairfax, Virginia Other Project Updates Continuing work on: − Operations and Maintenance Facility (O&M) • Locations being studied − Fort Belvoir Station • Adjusted location to Belvoir Road − Station Design • Working on Basis of Design Report • Developing Prototypical Station (platform size, station amenities, etc.) Department of Transportation 25 Next Steps Richmond Highway Bus Rapid Transit 26 County of Fairfax, Virginia Next Steps Public Meeting #2 Public Meeting #3 • January 23, 2019 • September 17, 2019 (completed) Between now and Public Meeting #3, the Team will: • Continue to review comments from this meeting to better understand the needs in the corridor and what people would like to see at stations and in station areas • Continue to advance the system design and identify potential property impacts • Continue to develop reports that describe the types of impacts that the project could have on environmental resources • Continue to develop conceptual station design • Continue development of the BRT brand • Continue to work on securing funding Department of Transportation 27 County of Fairfax, Virginia How to Stay Involved • This process will be most effective with input from people who live, work, travel along, or spend time on the corridor − Sign up for Fairfax Alerts! www.FairfaxCounty.gov/alerts (Category: Richmond Highway BRT Project Updates) − Track the project on social media (County and Connector Facebook and Twitter) − Materials from the meeting will be posted at South County Center Website: fairfaxcounty.gov/transportation Key words: Richmond Highway BRT Department of Transportation 28 Questions Contact Information • Website: fairfaxcounty.gov/transportation (key words: “Richmond Highway BRT”) • Email the Project Team: [email protected] • Address (for mailing comment sheets): Fairfax County Department of Transportation, Richmond Highway BRT Project Manager, 4050 Legato Rd, Suite 400, Fairfax, VA 22033. Richmond Highway Bus Rapid Transit 29.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    30 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us